RECOVERY--Z--ARRA 10 SOUTHFIELD DRAIN No. 2 REHABILITATION PROJECT
Award Notice Posted
- Solicitation number
- W911XK-10-B-0007
- Agency
-
ENDIST Detroit
US Army Corps of Engineers, Department of Defense
- Awarded
- to Blaze Contracting Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W911XK-10-C-0020-P00001 Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): BLAZE CONTRACTING INC, (011507360) W911XK-10-C-0020, SOUTHFIELD DRAIN No. 2 PROJECT
A. SCOPE OF WORK
DT004 Disposal Site Change
The current material disposal facility is the (Waste Management's
Eagle Valley Landfill). This disposal site is changed to the Waste Management's Pine Tree Acres Landfill, Oakland County.
Update #4 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): BLAZE CONTRACTING INC. (011507360) W911XK-10-C-0020, SOUTHFIELD DRAIN No. 2 PROJECT
DT003 Collapsed Pipe Repair
An 18" sewer pipe collapsed between MH713 and MH773 on Sutherland
Road while it was being prepped for lining. A spot repair is to be completed in that area to fix the collapsed pipe. The spot repair will be roughly 15' in length, consisting of SDR 35 pipe
Update #3 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): BLAZE CONTRACTING INC. (011507360) W911XK-10-CC-0020, SOUTHFIELD DRAIN No. PROJECT.
DT005 Additional Stretch of CIPP Lining
A stretch of pipe that is in very poor condition was left out of required work under the contract.
The stretch of pipe is between Manhole 623 and Manhole 624 on Stuart Street. The pipe is 15
inches in diameter and amounts to roughly 336 lineal feet. The stretch of pipe is
added to the contract requirement, increasing the total length of Cured-In-Place-Pipe (CIPP) to
12,340 lineal feet.
Update #2 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): BLAZE CONTRACTING, INC (011507360) W911XK-10-C-0020, SOUTHFIELD DRAIN No. 2 PROJECT.
DT006 CIPP Lining Pipe Diameter Discrepancy
The contract documents show that Cured-In-Place-Pipe is to be
installed inside a 15" diameter clay pipe between MH#728 and MH#698.
The actual diameter of the pipe between MH#728 and MH#698 is 18".
The contractor shall install lining to fit an 18" pipe in lieu of
the 15" pipe, which was shown on the plans. The total lineal footage
in this reach is 330lf.
Update #1 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): BLAZE CONTRACTING, INC. (011507360), W911XK-10-C-0020, SOUTHFIELD DRAIN No. 2 PROJECT.
REVISION TO DRAWINGS:
Drawing C-101 Drawings should show an 18" pipe between Manhole#728
and Manhole#698.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Z--Oakland County FY10 Southfield Drain No. 2, Rehabilitation Project | Award Notice | |
| RECOVERY--Z--SOUTHFIELD DRAIN No. 2 REHABILITATION PROJECT | Award Notice | |
| This notice | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 76281, FY10 Contract for Southfield Drain No. 2, Drain Rehabilitation Project Cured in Place Pipe Lining (CIPP) System | Award Notice |