RECOVERY--Y--Work will be completed in accordance with the basic contract, and as detailed in the Scope of Work (SOW), BOGGS LOCK AND DAM, LOUISIANA

Award Notice Posted

Solicitation number
W912EE-09-D-0009-0002
Agency
Awarded
to Regional Construction, L.L.C.
Set-aside
No set-aside

Opportunity facts

Contract number
W912EE-09-D-0009-0002 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This contract action was accomplished using other than competitive procedures because this is an order under an existing contract that was awarded using non-competitive procedures.

Project# 107169 CWIS# 000065 The work consists of furnishing all plant, labor, materials, and equipment for the surfacing and resurfacing of project roads with the project limits at Boggs Lock and Dam, Louisiana. Principal features of work include mobilization and demobilization, pre-rolling existing pavement to identify failed areas, cold planing existing pavement, repair of existing failed areas within existing pavement, in-grade preparation of existing granular base and shoulder course material, lime treatment of existing base course material, placement of granular base course material, tack coating, asphaltic concrete pavement, granular shoulder course material and pavement striping, removing and replacing existing wheel stops, placing new wheel stops, and environmental protection! .

Update #1 ·

RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W912EE-09-D-0009-0002.

The work consists of furnishing all plant, labor, materials, and equipment for the surfacing and resurfacing of project roads with the project limits at Boggs Lock and Dam, Louisiana. Principal features of work include mobilization and demobilization, pre-rolling existing pavement to identify failed areas, cold planing existing pavement, repair of existing failed areas within existing pavement, in-grade preparation of existing granular base and shoulder course material, lime treatment of existing base course material, placement of granular base course material, tack coating, asphaltic concrete pavement, granular shoulder course material and pavement striping, removing and replacing existing wheel stops, placing new wheel stops, and environmental protection.