RECOVERY Y--STIMULUS PROJECT/RECOVERY ACT (ADDITION): PROJECT # 630-08-101 Roof Replacement Phase II
Award Notice Posted
- Solicitation number
- VA-243-10-RA-0174
- Agency
-
Veterans Integrated Service Network 2
Veterans Health Administration, Department of Veterans Affairs
- Awarded
- to Veterans Contracting Group, Inc.
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- Contract number
- VA243RA0843 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- U.S. Department of Veterans Affairs New York Harbor Health Care Systems 423 East 23rd Street New York, New York 10010 USA
Notice details come from SAM.gov. Updated .
Notice text
SCOPE OF WORK for CONSTRUCTION630-08-118
OPC Medical Gas / Panel Upgrade
SCOPE OF WORK
1.2 STATEMENT OF BID ITEMS (STATEMENT OF WORK)
A. ITEM I, Repair Roof Phase II: The work scope is fairly well defined and the project will be a lump sum bids with the following work at a minimum required:
1. Replacement of roofing systems of Building #1, (Main Building): Chapel Roof, and Gymnasium Roof.
2. Replacement of existing roofing system of Building # 4,(A/C Building).
3. Replacement of existing roofing system of Building # 5,(Switchgear/ Chiller Building).
4. Replacement of existing roofing system of Building # 2 including lower roof over maintenance shops, (Annex Building).
5. Repair of main canopy at the entrance to Main Building # 1.
6. Extend Rear Parking Lot Security Booth entrance canopy. Walkway Bridges between Building # 1 & 3 and Building # 2 & 3.
7. Replacement of existing Exterior Ceiling System for Walkway Bridges between Buildings #1 & #3.
B. Base Bid and Alternates. This project includes the Base Bid and Alternates No.1, No. 2, No. 3, No.4, No. 5, No. 6, No.7, No. 8, No. 9, No.10, No. 11 and No. 12. The Base Bid includes all the work described in Article 1.2 A Statement of Work. Each successive Alternate deletes work from the Base Bid as follows:
1. Base Bid - includes work described in Article 1.2 A Statement of Work.
a. Alternate No. 1 - This Alternate is the Base Bid minus the removal of the Gymnasium Roof from Item No. 1 of the Statement of Work.
b. Alternate No. 2 - This Alternate is the Base Bid minus the removal of Item 6 of the Statement of Work in its entirety.
c. Alternate No. 3 - This Alternate is the Base Bid minus the removal of the Gymnasium Roof from Item No. 1 of the Statement of Work and the removal of Item 6 of the Statement of Work in its entirety.
d. Alternate No. 4 - This Alternate is the Base Bid minus the removal of Switchgear / Chiller Building from Item 3 of the Statement of Work in its entirety.
e. Alternate No. 5 - This Alternate is the Base Bid minus the removal of Annex Building from Item 4 of the Statement of Work in its entirety.
f. Alternate No. 6 - This Alternate is the Base Bid minus the removal of Main Building #1 Canopy Entrance from Item 5 of the Statement of Work in its entirety.
g. Alternate No. 7 - This Alternate is the Base Bid minus the removal of Walkway Bridges Exterior Ceiling System from Item 7 of the Statement of Work in its entirety.
h. Alternate No. 8 - This Alternate is the Base Bid minus the item #2 Replacement of existing roofing system of Building # 4(A/C Building), minus the item #3 replacement of existing roofing system of Building # 5,(Switchgear/ Chiller Building) and minus the item #4 Replacement of existing roofing system of Building # 2 including lower roof over maintenance shops (Annex Building).
i. Alternate No. 9 - This Alternate is the Base Bid minus the item #2 Replacement of existing roofing system of Building # 4(A/C Building), minus the item #3 replacement of existing roofing system of Building # 5,(Switchgear/ Chiller Building), minus the item #4 Replacement of existing roofing system of Building # 2 including lower roof over maintenance shops (Annex Building)and minus the item #5 Repair of main canopy at the entrance to Main Building # 1.
j. Alternate No. 10 - This Alternate is the Base Bid minus the item #2 Replacement of existing roofing system of Building # 4(A/C Building), minus the item #3 replacement of existing roofing system of Building # 5,(Switchgear/ Chiller Building), minus the item #4 Replacement of existing roofing system of Building # 2 including lower roof over maintenance shops (Annex Building), minus the item #5 Repair of main canopy at the entrance to Main Building # 1, minus the item #6 Extend Rear Parking Lot Security Booth entrance canopy. Walkway Bridges between Building # 1 & 3 and Building # 2 & 3 and minus the item #7 Replacement of existing Exterior Ceiling System for Walkway Bridges between Buildings #1 & #3.
k. Alternate No. 11 - This Alternate is the Base Bid minus the item #2 Replacement of existing roofing system of Building # 4(A/C Building)and minus the item #3 replacement of existing roofing system of Building # 5,(Switchgear/ Chiller Building).
l. Alternate No. 12 - This Alternate is the Base Bid minus the item #5 Repair of main canopy at the entrance to Main Building # 1, minus the item #6 Extend Rear Parking Lot Security Booth entrance canopy, Walkway Bridges between Building # 1 & 3 and Building # 2 & 3 and minus the item #7 Replacement of existing Exterior Ceiling System for Walkway Bridges between Buildings #1 & #3.
C. Contract Time.
1. Contractor shall achieve substantial completion of the work within two hundred seventy (365) calendar days unless the period of completion is extended by the contract documents.
SOLICITATION WILL BE ISSUED ON OR BEFORE 01/28/2010.
Files
| File | Type | Posted |
|---|---|---|
| VA-243-10-RA-0174-000.DOC | DOC document | |
| VA-243-10-RA-0174-001.ZIP | ZIP file |
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY Y--STIMULUS PROJECT/RECOVERY ACT (ADDITION): CONTRACT #: VA243-RA-0843 PROJECT # 630-08-101 Roof Replacement Phase II | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity