RECOVERY--Y--Replace Deteriorated Building 2 and Install New Heating, Ventilation and Air Conditioning System and Electrical Upgrade, VA Medical Center, Bonham TX
Award Notice Posted
- Solicitation number
- W9127S10R0015
- Agency
-
ENDIST Little Rock
US Army Corps of Engineers, Department of Defense
- Awarded
- to AMX Vss, L.L.C.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W9126G-09-D-0015 CL06 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): AMX , W9126G-09-D-0015; Blackhawk Ventures, W9126G-09-D-0014; and LEC Construction, W9126G-09-D-0016
Install New Heating, Ventilation and Air Conditioning System and Upgrade Electrical in Building 2. The Contractor shall completely prepare the site for building operations, including demolition and removal of existing structures, and furnish labor and materials to perform work in support of the North Texas Veterans Health Care Medical System in Bonham, TX.
Update #1 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): W9126G-09-D-0014, W9126G-09-D-0015, W9126G-09-D-0016 with Blackhawk, AMX and LEC Construction Companies
Contractor to provide all supervision; labor; material; equipment to correct HVAC deficiencies and perform renovations on the 2nd Floor; Building No.2 West Wing in accordance will contract drawings and specifications. This project is located at the VA North Texas Health Care System, Sam Rayburn Memorial Veterans Center;1201 E. 9th Street, Bonham, Texas 75418. Contractor to provide and install new HVAC System and all associated electrical distribution and controls in support thereof. New HVAC controls to be interfaced with existing Siemens Energy Management System (EMS). The VA expects a complete operating HVAC system with EMS, tested and balanced (air/water) in accordance with VA Standards; manufactures recommendations and industry standards.
Demolish approximately 600 sq. ft. of existing plaster ceiling (contractor to protect and be extremely careful around existing fire sprinkler system). Demolish existing partition walls and all plumbing (Room 218); build back Mechanical Room (Room 218) walls; utilities; electrical; and lighting as per contract drawings and specifications. Patch existing voids in concrete floor using a non shrinking grout or equal and prepare floor surface for installation of Carpet; Ceramic Tile and VCT as noted on Finish Schedules. Demolish perimeter steam radiators and install perimeter exterior walls (with finishes) and window sills as per drawings and details. Remove existing vertical domestic water and drain lines; cap-off at existing concrete ceiling and above ceiling of 1st Floor. Patch and fire caulk/stop all existing and new penetrations. General Contractor to provide a design submittal by a Certified Fire Protection Engineer or a Certified Fire Protection Designer for the purpose of relocation of existing fire sprinkler heads; installation of new Fire Alarm Pull Stations and Ceiling Smoke Detectors (to match existing Siemens system).
Build-back includes; but not limited to new female and male toilet facilities and kitchenette(s); walls; and lighting; new electrical distribution system and electrical panels as per contract drawings and specifications. All work to be accomplished in accordance with VA and Industry Standards and Practices; NFPA; National Electric Code; in accordance with manufactures recommendations; contract documents; construction drawings and specifications. Contractors are responsible for verification of all measurements; dimensions and utility locations; system furniture as shown on contract drawings to be installed by others. Contractor to maintain two sets of drawings and specifications on site with one set of drawings used for red lines. After completion of project; contractor shall deliver to the COTR a red line copy of drawings to be submitted to the A/E to incorporate into as-built drawings.