RECOVERY--Y--Repair Building P-10570 Motor Pool-Replace Roof and Repair Doors
Award Notice Posted
- Solicitation number
- EC-00508-9J
- Agency
-
MICC Fort Drum
Mission and Installation Contracting Command, Department of Defense
- Awarded
- to Chugach Industries, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W911S2-06-D-0005-0061 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
This contract action was accomplished using other than competitive procedures because this is an order under an existing contract that was awarded using non-competitive procedures.
RECOVERY: This firm fixed price task order number 61 was awarded under Contract W911S2-06-D-0005 to Chugach Industries Incorporated and funded by the American Recovery and Reinvestment Act (ARRA) of 2009.
Rationale for this action is as follows: The existing contract is one of two contracts awarded under the authority of the SBA 8 (a) program for the repair, rehabilitation and construction services. The contract is one of the primary means of providing quick and responsive contract support to accomplish installation minor construction workload priorities and surges. To ensure the intent of the Recovery Act is met, this contract provides the most expeditious and efficient method of expending Recovery Act funds. Numerous subcontracting opportunities are associated with this contract.
The work shall include all work in connection with the upgrade of Vehicle Maintenance Building P-10570 at Fort Drum, New York. The work shall include but is not limited to removing and replacing the overhead doors, including all exterior personnel doors. The interior doors and hardware shall be replaced with the same type as existing. The two sets of bathrooms shall be upgraded to include new toilets, urinals, sinks, mirrors, lighting, toilet partitions, urinal partitions, shower receptor and tile walls. The roof shall be replaced with EPDM gutter for the length of the building both sides and removal of EPDM roofing, insulation and OSB board and replaced with new insulation (same thickness and type as removed), 7/16 inch OSB over insulation, mechanically fastened with 0.060 EPDM roofing system fully adhered, snow load 70 PSF and 100MPH wind. The existing lube pits shall be upgraded by adding fiberglass grates (150 PSF rated), and lighting shall be upgraded to provide fluorescent units in the pit and the POL delivery system shall be upgraded. The floors in the repair bays shall be painted. The hand rails on the stairs and stairs themselves, to include steps, shall be painted. The acoustical ceiling shall be completely removed, to include the grid system and replaced with new tile. The floor tile shall be removed and replaced with new. Vinyl base shall be installed where tile is installed, and shall be stripped, sealed and waxed with one coat after installation.
The electrical interior work shall include removing lights and replacing with new lights similar to the existing lighting fixture. In rooms 116, 117 and 118 Repair Bays a new 200 amp 3 phase panel will be installed for future use. The new panels shall be centrally located in the areas designated and shall be tied into main electric panels in the Room 114 electrical room. The exterior pavement around the building shall be milled down (asphalt only) 1.5 inches, tack coat placed and asphalt top placed 1.5 inches deep. New hose reels at existing locations in the repair bays will be installed to accommodate a water and compressed air reel for each bay. In the existing repair bays the contractor is to install a new vehicle exhaust reel (2 per bay) and fan similar to the ones installed in VMF P-10265, remove existing ductwork for exhausting vehicle exhaust and remove fans and seal outlets to the outside. There are approximately 28 reels and 14 exhaust fans. Two of the bays shall be designated a welding bay, and welding curtains and exhaust fans shall be installed similar to welding bay in VMF P-10265. The fire detection system shall be upgraded to current NFPA 70, NFPA 72, NFPA 101 and UFC-3-600-01 standards to include, smoke detectors, fire alarm panel, enunciator panel, pull stations, emergency lighting, audible signals, visual signals, exit lighting and mass notification system. A sprinkler system will be added to the building to include an FDC on the exterior of the building and standpipe on the main entrance for fire departments to connect into the building. This portion of the project will require 90% drawings for review and 100% stamped drawings prior to construction. The siding that has been damaged or lost shall be replaced with similar metal siding to match existing. Five (5) gates shall be replaced with three strands of barbed wire on top. In the entrance vestibules, where there is floor grating, contractor shall remove, clean pit and install new grates similar to existing. An oil water separator shall be installed outside the existing oil water separator room, or at another location designated by the Government. The type of oil water separator shall be manufactured by Rockford Sanitary Systems Incorporated. The new oil water separator shall have full and complete access from the surface and be sized properly to accommodate all water flow from the facility and integral storage with double wall construction, leak detection, a high level sensor and alarm.
Update #1 ·
RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER THE FORT DRUM EXISTING REPAIR, REHABILITATION AND CONSTRUCTION (RRC) Contract Number W911S2-06-D-0005, Contractor: Chugach Industries Incorporated, 3800 Centerpoint Drive, Suite 601, Anchorage, AK 99503. The Directorate of Contracting will obtain services to provide all supervision, plant, labor and equipment necessary to perform all work in connection with the upgrading of the vehicle maintenance facility. Work shall include but is not limited to removing and replacing overhead doors to include exterior and interior doors, new EPDM roof system, boilers, sprinkler system, oil water separator, five gates and fencing. The magnitude of this project is estimated to be between $1,000,000 and $5,000,000. The project will be funded by the American Recovery and Reinvestment Act of 2009. This is not a request for quotation or a solicitation for offers.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity