RECOVERY--Y--Renovate Barracks P-10124 - Repair Doors, Ceilings, Walls, Electric, Plumbing

Award Notice Posted

Solicitation number
EC-00583-8J
Agency
Awarded
to Alutiiq Global Solutions LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W911S2-06-D-0006-0089 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This contract action was accomplished using other than competitive procedures because this is an order under an existing contract that was awarded using non-competitive procedures.

This firm fixed price task order number 89 was awarded under Contract W911S2-06-D-0006 to Alutiiq Global Solutions LLC and funded by the American Recovery and Reinvestment Act (ARRA) of 2009.

Rationale for this action is as follows: The existing contract is one of two contracts awarded under the authority of the SBA 8(a) program for repair, rehabilitation and construction services. The contract is one of the primary means of providing quick and responsive contract support to accomplish installation minor construction workload priorities and surges. To ensure the intent of the Recovery Act is met, this contract provides the most expeditious and efficient method of expending Recovery Act funds. Numerous subcontracting opportunities are associated with this contract.

The work shall include all work in connection with the renovation of Barracks Bldg. P-10124, Fort Drum, NY. Work shall include, but is not limited to,demolishing existing bathroom walls and constructing new walls and doorways to increase the size of the bathroom, each containing one new shower, toilet and sink. The new suites will each contain a small kitchenette to include cabinets and countertop, microwave and refrigerator. A new closet with shelves will be constructed in each suite. Flooring in the suites shall be replaced with new vinyl composition tile and waxed. All rooms shall be painted, to include radiant floor baseboard heater covers. All existing suspended ceiling tiles shall be removed and replaced with new tile. All broken windows and room entry doors will be replaced with new windows and doors to match existing. Those doors not damaged shall receive a fresh coat of paint to match existing. All doors shall be prepared for the installation of a keyless entry system. All common areas, to include the laundry room, will receive new paint and floor tile to match existing. All rigid dryer hose shall be removed and replaced with new. A new CQ (Charge of Quarters) desk will be constructed to replace the existing desk to be demolished. New lighting and electrical hardware will be installed, per code, to support the facility. Emergency lighting shall also be provided per current fire and safety codes. Damaged or inoperable A/C wall units shall be removed and replaced with 120 VAC 8000 BTU High Efficiency units. All existing baseboard heat thermostats shall be removed and replaced in kind. Paint system shall consist of 1 coat latex primer, followed by 2 coats of latex eggshell or semi-gloss paint. Color shall match what was originally used in the facility.

Update #1 ·

RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER THE EXISTING FORT DRUM REPAIR, REHABILITATION AND CONSTRUCTION (RRC) Contract Number W911S2-06-D-0006, Contractor: Alutiiq Global Solutions, LLC, 3033 South Parker Road, Suite 1111, Aurora, CO 80014. The Directorate of Contracting will obtain services to provide all supervision, plant, labor and equipment necessary to perform all work in connection with the renovation of Barracks Bldg. P-10124, Fort Drum, NY. Work shall include, but is not limited to,demolishing existing bathroom walls and constructing new walls and doorways to increase the size of the bathroom, each containing one new shower, toilet and sink. The new suites will each contain a small kitchenette to include cabinets and countertop, microwave and refrigerator. A new closet with shelves will be constructed in each suite. Flooring in the suites shall be replaced with new vinyl composition tile and waxed. All rooms shall be painted, to include radiant floor baseboard heater covers. All existing suspended ceiling tiles shall be removed and replaced with new tile. All broken windows and room entry doors will be replaced with new windows and doors to match existing. Those doors not damaged shall receive a fresh coat of paint to match existing. All doors shall be prepared for the installation of a keyless entry system. All common areas, to include the laundry room, will receive new paint and floor tile to match existing. All rigid dryer hose shall be removed and replaced with new. A new CQ (Charge of Quarters) desk will be constructed to replace the existing desk to be demolished. New lighting and electrical hardware will be installed, per code, to support the facility. Emergency lighting shall also be provided per current fire and safety codes. Damaged or inoperable A/C wall units shall be removed and replaced with 120 VAC 8000 BTU High Efficiency units. All existing baseboard heat thermostats shall be removed and replaced in kind. Paint system shall consist of 1 coat latex primer, followed by 2 coats of latex eggshell or semi-gloss paint. Color shall match what was originally used in the facility. The magnitude of this project is estimated to be between $1,000,000 and $5,000,000. The project will be funded by the American Recovery and Reinvestment Act of 2009. This is not a request for quotation or a solicitation for offers.