RECOVERY Y--RECOVERY ACT - 620-10-118 REPLACE BOILERS at FDR - STAGE 1

Award Notice Posted

Solicitation number
VA24310RA0198
Agency
Awarded
to Iron Eagle Environmental Services
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Contract number
VA243-C-0879 Federal contract award
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

AWARD OF RECOVERY BOILER REPLACEMENT PROJECT NO 620-10-118

IS MADE TO IRON EAGLE ENVIRONEMENTAL SERVICES INC ON 5-25-10



END OF AWARD NOTICE

Update #2 ·

PLACE OF PERFORMANCE:

VA HUDSON VALLEY HEALTH CARE SYSTEM

2094 ALBANY POST ROAD

MONTROSE, NEW YORK 10548



NAICS CODE: 238220

COST RANGE: $5,000,000.00 TO $10,000,000.00



Scope of Work





ITEM 1- Boiler Replacement Projects (Phase I & II): Furnish all labor, tools, materials, equipment, supplies, supervision, training, commissioning and personnel necessary to complete Project No. 620-10-118 Boiler Replacement (Phase I & II) at the VA Hudson Valley Healthcare System, FDR Montrose. All work shall be in strict accordance and comply with contract drawings, specifications, and VA standards, national, state, local and any applicable codes as per requirements of all governing agencies. Work includes general, mechanical & electrical work, installation of new three (3) 35,000 pounds per hour rated boilers and one (1) 200HP (6900 pounds per hour) boiler inclusive with burners, boiler controls & its new accessories, necessary removal of existing burners, existing boiler controls & its existing accessories and certain other items. (Boiler Plant) and associated plumbing HVAC and electrical work. The general construction works includes but is not limited to selective demolition asbestos and lead abatement, structural steel framing, concrete work, metal fabrication including catwalks, brick work, aluminum window removal and re-installation, built-up roof patching at new work, joint sealants, flooring work, painting and certain other items to complete this project. The contractor will provide permits and regulatory approval, oversight of complete installation, oversee project construction, commissioning and training of VA engineering personnel, debris removal & disposal. Include all cleanup, testing, commissioning, and related work. All work to be completed and as indicated and noted on Contract, drawings, scope of work and in these Specifications. All design and construction must be in compliance with VA Master Specifications, security requirements, guidelines and standards, EPACT 2005, Executive Order 13423, ASHRAE standards and all other applicable federal, state, national and local code as per requirement of all governing agencies. Contractor will be responsible to coordinate and schedule work to minimize to short duration any shutdowns. The Contractor shall furnish and erect/ install temporary boiler system for the facility to supply steam generation for heating, domestic hot water and hospital operations during the complete construction project period.

900 Calendar Days Completion Time from Notice to Proceed

ITEM1 - Base Bid (Phase I & II work).

ITEM 2- Alternate Deduct: Base Bid less Phase II work.

650 Calendar Days Completion Time from Notice to Proceed



ADDITIONAL INFORMATION:

The solicitation is proposed to be issued as a Service Disable Veteran Owned Small Business {SDVOSB} Set a Side.



This is only an announcement and must not be construed as a guarantee in any form.



The full solicitation is expected to be posted on or about April 8, 2010.





---END OF ANNOUNCMENT ---

Update #1 ·

PLACE OF PERFORMANCE:

VA HUDSON VALLEY HEALTH CARE SYSTEM

2094 ALBANY POST ROAD

MONTROSE, NEW YORK 10548



NAICS CODE: 238220

COST RANGE: $5,000,000.00 TO $10,000,000.00



Scope of Work





ITEM 1- Boiler Replacement Projects (Phase I & II): Furnish all labor, tools, materials, equipment, supplies, supervision, training, commissioning and personnel necessary to complete Project No. 620-10-118 Boiler Replacement (Phase I & II) at the VA Hudson Valley Healthcare System, FDR Montrose. All work shall be in strict accordance and comply with contract drawings, specifications, and VA standards, national, state, local and any applicable codes as per requirements of all governing agencies. Work includes general, mechanical & electrical work, installation of new three (3) 35,000 pounds per hour rated boilers and one (1) 200HP (6900 pounds per hour) boiler inclusive with burners, boiler controls & its new accessories, necessary removal of existing burners, existing boiler controls & its existing accessories and certain other items. (Boiler Plant) and associated plumbing HVAC and electrical work. The general construction works includes but is not limited to selective demolition asbestos and lead abatement, structural steel framing, concrete work, metal fabrication including catwalks, brick work, aluminum window removal and re-installation, built-up roof patching at new work, joint sealants, flooring work, painting and certain other items to complete this project. The contractor will provide permits and regulatory approval, oversight of complete installation, oversee project construction, commissioning and training of VA engineering personnel, debris removal & disposal. Include all cleanup, testing, commissioning, and related work. All work to be completed and as indicated and noted on Contract, drawings, scope of work and in these Specifications. All design and construction must be in compliance with VA Master Specifications, security requirements, guidelines and standards, EPACT 2005, Executive Order 13423, ASHRAE standards and all other applicable federal, state, national and local code as per requirement of all governing agencies. Contractor will be responsible to coordinate and schedule work to minimize to short duration any shutdowns. The Contractor shall furnish and erect/ install temporary boiler system for the facility to supply steam generation for heating, domestic hot water and hospital operations during the complete construction project period.

900 Calendar Days Completion Time from Notice to Proceed

ITEM1 - Base Bid (Phase I & II work).

ITEM 2- Alternate Deduct: Base Bid less Phase II work.

650 Calendar Days Completion Time from Notice to Proceed



ADDITIONAL INFORMATION:

The solicitation is proposed to be issued as a Service Disable Veteran Owned Small Business {SDVOSB} Set a Side.



This is only an announcement and must not be construed as a guarantee in any form.



The full solicitation is expected to be posted on or about April 8, 2010.





---END OF ANNOUNCMENT ---

Files

File Type Posted
VA-243-10-RA-0198-0002001.ZIP ZIP file
VA-243-10-RA-0198-0002000.DOC DOC document
VA-243-10-RA-0198-0001000.DOC DOC document
VA-243-10-RA-0198-0001001.ZIP ZIP file
VA-243-10-RA-0198-000.DOC DOC document
VA-243-10-RA-0198-002.ZIP ZIP file
VA-243-10-RA-0198-004.ZIP ZIP file
VA-243-10-RA-0198-001.ZIP ZIP file
VA-243-10-RA-0198-003.ZIP ZIP file

Notice history

Notice Type Posted
This notice Latest Award Notice
Recovery Y--FDR boiler project 620-09-118 Original Award Notice