RECOVERY--Y--PROJECT NUMBER 72869, Ground Source Heat Pumps & Photovoltaic for Bldg 100-101

Award Notice Posted

Solicitation number
W912DQ06X0050DK01
Agency
Awarded
to Caman Construction Company Inc 8 (A)/ Strickland Construction Co Inc A Missouri JV
Set-aside
No set-aside

Opportunity facts

Contract number
W912DQ-07-D-0046-DK01 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

This project will convert space cooling systems at Building 100-101 (the main administration building at the plant) from DX coils to a system using ground source heat pumps for cooling and heating. This project will also include options for a photovoltaic array, inverter, and associated electrical distribution to compensate for energy used by the water re-heat system. The new well field will be located in areas south of Building 100-101.

Update #2 ·

THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE MATOC CONTRACTS LISTED.
W9128DQ-07-D-0031 MaxFour/Weitz; W912DQ-07-D-0045 Greenleaf/ECI;
W912DQ-07-D-0046 Caman/Strickland; W912DQ-08-D-0030 McTech Corp

This project will convert space cooling systems at Building 100-101 (the main administration building at the plant) from DX coils to a system using ground source heat pumps for cooling and heating. This project will also include options for a photovoltaic array, inverter, and associated electrical distribution to compensate for energy used by the water re-heat system. The new well field will be located in areas south of Building 100-101.

Update #1 ·

W912DQ-07-D-0031 MaxFour/Weitz; W912DQ-07-D-0045 Greenleaf/ECI;
W912DQ-07-D-0046 Caman/Strickland; W912DQ-08-D-0030 McTech Corp
This project will convert space cooling systems at Building 100-101 (the main administration building at the plant) from DX coils to a system using ground source heat pumps for cooling and heating. This project will also include options for a photovoltaic array, inverter, and associated electrical distribution to compensate for energy used by the water re-heat system. The new well field will be located in areas south of Building 100-101.