RECOVERY--Y--PROJECT NUMBER 34619, Replace Headstall Creek Bridge
Award Notice Posted
- Solicitation number
- DE-02683-9P
- Agency
-
MICC Fort Gordon
Mission and Installation Contracting Command, Department of Defense
- Awarded
- to The Davis Group. Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W911SE-08-D-0011-0006 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Fort Gordon DOC Directorate of Contracting, 419 B Street, Bldg 29718, 3rd Floor Fort Gordon GA 30905 US
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): W911SE-08-D-0011, W911SE-08-D-0013, W911SE-08-D-0018
These contracts were previously competed and awarded to The Davis Group, 209 San Carlos Ave, Sanford FL, 32771, Point of Contact: Dennis Smith at 407-688-0261 (W911SE-08-D-0011), Jarrett Construction, 2267 WL Dickinson Dr, Montgomery AL 36109, Point of Contact: Joel Griswold at 334-270-0046 (W911SE-08-D-0013), and TMS Contracting, 635 Frosty Morn Dr, Clarksville TN, 37040, Point of Contact: Christa Suggs at 931-647-2233.
The Fort Gordon Directorate of Contracting issued a Firm Fixed Price Task Order to The Davis Group (W911SE-08-D-0011-0006) to obtain all supervision, labor, and equipment necessary to abandon the current bridge in place and install a new/refurbished pre-engineered/pre-fabricated truss bridge across the gap, above and over the existing bridge site.
A no cost modification (W911SE-08-D-0011-0006-02)has been issued to extend the completion date of the project. The project is funded by the American Recovery and Reinvestment Act of 2009.
Update #2 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): W911SE-08-D-0011, W911SE-08-D-0013, W911SE-08-D-0018
These contracts were previously competed and awarded to The Davis Group, 209 San Carlos Ave, Sanford FL, 32771, Point of Contact: Dennis Smith at 407-688-0261 (W911SE-08-D-0011), Jarrett Construction, 2267 WL Dickinson Dr, Montgomery AL 36109, Point of Contact: Joel Griswold at 334-270-0046 (W911SE-08-D-0013), and TMS Contracting, 635 Frosty Morn Dr, Clarksville TN, 37040, Point of Contact: Christa Suggs at 931-647-2233.
The Fort Gordon Directorate of Contracting has issued a Firm Fixed Price Task Order to the Davis Group (W911SE-08-D-0011-0006)to obtain all supervision, labor, and equipment necessary to remove and dispose of the current bridge and install a new/refurbished pre-engineered/pre-fabricated truss bridge across the gap, above and over the existing bridge site.
A no cost modification (W911SE-08-D-0006-01) has been created to issue the Notice to Proceed for this project. The project is funded by the American Recovery and Reinvestment Act of 2009.
Update #1 ·
PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS WAS AVAILABLE ONLY TO THE CONTRACTORS UNDER THE EXISTING MATOC contracts W911SE-08-D-0011, W911SE-08-D-0013 and W911SE-08-D-0018. These contracts were previously competed and awarded to The Davis Group, 209 San Carlos Ave, Sanford FL, 32771, Point of Contact: Dennis Smith at 407-688-0261 (W911SE-08-D-0011), Jarrett Construction, 2267 WL Dickinson Dr, Montgomery AL 36109, Point of Contact: Joel Griswold at 334-270-0046 (W911SE-08-D-0013), and TMS Contracting, 635 Frosty Morn Dr, Clarksville TN, 37040, Point of Contact: Christa Suggs at 931-647-2233. The Fort Gordon Directorate of Contracting has issued a Firm Fixed Price Task Order to The Davis Group (W911SE-08-D-0011) to obtain all supervision, labor, and equipment necessary to abandon the current bridge in place and install a new/refurbished pre-engineered/pre-fabricated truss bridge across the gap, above and over the existing bridge site. The project is funded by the American Recovery and Reinvestment Act of 2009.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Y--PROJECT NUMBER 34619, Replace Headstall Creek Bridge | Award Notice | |
| This notice | Award Notice | |
| RECOVERY--Y--Replace Headstall Creek Bridge | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity