RECOVERY--Y--PROJECT NUMBER 34070, Replace Three Boilers, 525

Award Notice Posted

Solicitation number
W91ZLK-WR6M7J
Agency
Awarded
to Edco Contractors, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W91ZLK-07-D-0113-0191 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W91ZLK-WR6M7J.

PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS ONLY AVAILABLE ONLY TO THE BELOW LISTED CONTRACTORS UNDER THE CURRENT CONTRACT NUMBERS:
W91ZLK-07-D-0113 EDCO CONTRACTORS, INC.
W91ZLK-07-D-0114 N-POWELL COMPANY, INC.
W91ZLK-07-D-0115 BETTER BUILT CONSTRUCTION SERVICES, INC.
W91ZLK-07-D-0116 MELTECH/W.M. SCHLOSSSER, LLC B (JOINT VENTURE)
W91ZLK-07-D-0117 SOVEREIGN CONSULTING, INCL
W91ZLK-07-D-0119 C & R ENVIRONMENTAL ASSOCIATES, INC.
W91ZLK-07-D-0118 CAPTIAL TECHNOLOGY SERVICES, INC.

The scope of this project consists of removing existing boiler to include blow down piping, valves, and non return valves and install new boiler, blow down lines and non return valves.

Update #1 ·

RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W91ZLK-WR6M7J.

PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS ONLY AVAILABLE ONLY TO THE BELOW LISTED CONTRACTORS UNDER THE CURRENT CONTRACT NUMBERS:
W91ZLK-07-D-0113 EDCO CONTRACTORS, INC.
W91ZLK-07-D-0114 N-POWELL COMPANY, INC.
W91ZLK-07-D-0115 BETTER BUILT CONSTRUCTION SERVICES, INC.
W91ZLK-07-D-0116 MELTECH/W.M. SCHLOSSSER, LLC B (JOINT VENTURE)
W91ZLK-07-D-0117 SOVEREIGN CONSULTING, INCL
W91ZLK-07-D-0119 C & R ENVIRONMENTAL ASSOCIATES, INC.
W91ZLK-07-D-0118 CAPTIAL TECHNOLOGY SERVICES, INC.

The scope of this project consists of removing existing boiler to include blow down piping, valves and non return valves and install new boiler, blow down lines and non return valves.