Recovery--Y--PPS# 28222 repair and correct failed safety deficiency @ plank road & wayside road (FA-20016-7P) fort bragg, NC

Award Notice Posted

Solicitation number
W912HN-08-D-0051
Agency
Awarded
to Barnhill Contracting Company
Set-aside
No set-aside

Opportunity facts

Contract number
W912HN-08-D-0051-0011 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS ONLY EXTENDED TO THE EXISTING CONTRACTOR AWARDED CONTRACT W912HN-08-D-0051, BARNHILL CONTRACTING COMPANY. This is not a solicitation. The Savannah District, U.S. Army Corps of Engineers has a requirement for a Request for Proposal Development. It is the intent of the Government to award a Task Order on an existing Indefinite Delivery Contract. The task order will be firm fixed price. The contractor's Data Universal Numbering System (DUNS) is 024829988, the North American Industry Classification System (NAICS) is 237310; size standard is $33.5 million.



PROJECT INFORMATION: The work shall consist of the following:

Prepare improvements MUTCD and NCDOT methodology at the intersection of Plank Road and Wayside Road, Fort Bragg, NC. (1) The preparation of a collision diagram for the latest four year study period using the NCDOT format, (2) Collect sixteen hour traffic counts to include a count diagram indicating total and peak hour movements. (NOTE) Taking traffic counts for a part-time period and expanding to the required time is not permitted. Counts shall be taken for the entire study period. (3) From information obtained, provide necessary improvements to correct accident, capacity and geometric problems to include warranted traffic signal, conceptual widening proposals and sketches.

Update #2 ·

THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS ONLY EXTENDED TO THE EXISTING CONTRACTOR AWARDED CONTRACT W912HN-08-D-0051, BARNHILL CONTRACTING COMPANY. This is not a solicitation. The Savannah District, U.S. Army Corps of Engineers has a requirement for a Request for Proposal Development. It is the intent of the Government to award a Task Order on an existing Indefinite Delivery Contract. The task order will be firm fixed price. The North American Industry Classification System (NAICS) is 237310; size standard $33.5 million.

PROJECT INFORMATION: The work shall consist of the following:

Prepare improvements MUTCD and NCDOT methodology at the intersection of Plank Road and Wayside Road, Fort Bragg, NC. (1) The preparation of a collision diagram for the latest four year study period using the NCDOT format, (2) Collect sixteen hour traffic counts to include a count diagram indicating total and peak hour movements. (NOTE) Taking traffic counts for a part-time period and expanding to the required time is not permitted. Counts shall be taken for the entire study period. (3) From information obtained, provide necessary improvements to correct accident, capacity and geometric problems to include warranted traffic signal, conceptual widening proposals and sketches.

Update #1 ·

THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER W912HN-08-D-0051. This is not a solicitation. The Savannah District, U.S. Army Corps of Engineers has a requirement for a Request for Proposal Development. It is the intent of the Government to award a Task Order on an existing Indefinite Delivery Contract. The task order will be firm fixed price. The North American Industry Classification System (NAICS) is 237310; size standard $33.5 million.

PROJECT INFORMATION: The work shall consist of the following:

Prepare improvements MUTCD and NCDOT methodology at the intersection of Plank Road and Wayside Road. (1) The preparation of a collision diagram for the latest four year study period using the NCDOT format, (2) Collect sixteen hour traffic counts to include a count diagram indicating total and peak hour movements. (NOTE) Taking traffic counts for a part-time period and expanding to the required time is not permitted. Counts shall be taken for the entire study period. (3) From information obtained, provide necessary improvements to correct accident, capacity and geometric problems to include warranted traffic signal, conceptual widening proposals and sketches.