RECOVERY--Y--Guadalupe River, CA, Construct Two Bridges and Complete Project.
Awarded Award Notice Posted
- Solicitation number
- W91238-09-B-0002
- Agency
- ENDIST Sacramento US Army Corps of Engineers, Department of Defense
- Awarded
- to Proven Management Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W91238-09-C-0015 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
Added: Jul 27, 2009 12:51 pm
Replacement of UPRR bridge 4 (railroad bridge) between New Julian Avenue and Coleman Avenue, in downtown San Jose, California.
The primary objective of the Guadalupe River project is to provide 100-year flood protection to the areas of San Jose adjacent to the river. The basic object of this project is to:
a. Construct a two-track railroad bridge and associated approaches.
b. Construct a pedestrian under crossing.
c. Construct a maintenance road.
The work is needed to provide hydraulic capacity not provided by the previous bridges and to provide the required recreational features of the project.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Y--Guadalupe River, CA, Construct Two Bridges and Complete Project. | Award Notice | |
| RECOVERY--Y--The Guadalupe River Project Contract 3A Phase 3 consists of replacement of UPRR bridges Nos. 3 (vehicular bridge) & 4 (railroad bridge) between New Julian Avenue and Coleman Avenue, all in downtown San Jose, California | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity