Recovery--Y--embankment stabilization and slide repairs at JOE pool DAM, texas.

Award Notice Posted

Solicitation number
W9126G09R0184
Agency
Awarded
to SMR Construction Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W9126G-09-C-0082 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award.

This is a special notice to inform the public of the use of the Recovery Act funds.

RECOVERY: THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO 8(a) CONTRACTOR SMR CONSTRUCTION, INC.

The Contract Specialist for this action is Allen R. Bassett at 817-886-1051; or by e-mail at Allen.R.Bassett@usace.army.mil

This contract action was accomplished using Other Than Full and Open Competition under the authority of FAR 6.302-5(b)(4), Sole source awards under the 8(a) Program15 U.S.C. 637 and the Partnership Agreement dated 1 February 2002 between the U.S. Small Business Administration (SBA) and the Department of Defense (DoD).

The contractor shall provide all labor, supervision, tools, transportation, equipment, and materials necessary to repair upstream and downstream embankments at Joe Pool Dam.

Work entails repair of eight slides along the downstream embankment of Joe Pool Dam via excavation and stockpiling of topsoil for reuse; excavate slide material, mix with lime, and replace the soil/lime mixture followed by compaction and seeding of disturbed areas. Removal and disposal of site concrete apron and guard posts at slide areas. Grading of benched shoreline areas to a uniform surface; apply geotextile filter fabric followed by application of bedding material; place riprap on repaired shoreline and tie in to exiting riprap.

Update #1 ·

This is a special notice to inform the public of the use of the Recovery Act funds.

RECOVERY: THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO 8(a) CONTRACTOR SMR CONSTRUCTION, INC.

The Contract Specialist for this action is Allen R. Bassett at 817-886-1051; or by e-mail at Allen.R.Bassett@usace.army.mil

The objective is to repair upstream and downstream embankments at Joe Pool Dam.

Work entails repair of eight slides along the downstream embankment of Joe Pool Dam via excavation and stockpiling of topsoil for reuse; excavate slide material, mix with lime, and replace the soil/lime mixture followed by compaction and seeding of disturbed areas. Removal and disposal of site concrete apron and guard posts at slide areas. Grading of benched shoreline areas to a uniform surface; apply geotextile filter fabric followed by application of bedding material; place riprap on repaired shoreline and tie in to exiting riprap.

The estimated cost of construction is between $1,000,000 and $2,000,000.

POINT OF CONTACT:
Allen R. Bassett 817-886-1051

US Army Corps of Engineers
819 Taylor Street, Room 2A19
Fort Worth, Texas 76102-0300

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors