Recovery y--amendment #2
Award Notice Posted
- Solicitation number
- VA-245-09-RP-0181
- Agency
-
Headquarters
Department of Veterans Affairs
- Awarded
- to Marada Contracting, Inc.
- Set-aside
- Competitive 8(a)
Opportunity facts
- Contract number
- VA245C0389 Federal IDV award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
Added: Jul 10, 2009 11:44 am
Modified: Aug 13, 2009 8:32 amTrack Changes
The following are questions and answers to solocitation VA-245-09-RP-0181
Q:
1) The VA-245-09-RP-0181 RFP Project: 688-09-020 directs offers to: Submit original and four copies of Optional Form 308 with a bid guarantee as stipulated in the Section Instructions, Conditions, and Notices to Offerors:
However, it is not clear what type of bid guarantee is being requested. Please clarify and advise.
A: Submit original and two (2) copies of Optional Form 308 with a bid guaranty that is valid for a six (6) month period.
Q:
2) Also, how does the VA want the Offerors to handle Task 4 - replacing door lights with screen mesh? Does the Government have a spec for the contractor to use for this or is it to be designed by an A&E with drawings and specs as part of the D/B? What does the VA expect to happen for this task and if design is applicable to these, where in the price schedule should any design related cost for them be placed, in Phase 1 or Phase 4?
A:
Place design related cost in Phase 1
Some time ago the research building had a security inspection.
Many doors have small lights which have steel screen sandwiched between the panes.
A few doors had just plain glass. These doors need to have the light frame disassembled, the glass removed and replaced with glass ( or lexan ) that has steel screening sandwiched or embedded in it to make it more difficult for forced entry. Then reassemble the frame.
Q:
RFI # 3) The VA-245-09-RP-0181 RFP Project: 688-09-020 directs offers to: Submit original and four copies of Optional Form 308 with a bid guarantee as stipulated in the Section Instructions, Conditions, and Notices to Offerors:
However, the 1442 notes 2 copies of the proposal are required. Please clarify and advise.
A: Submit original and two (2) copies of Optional Form 308 with a bid guaranty that is valid for a six (6) month period.
Q:
RFI # 4) Also, the solicitation due date has apparently changed from 8-10-09 to 8-17-09 on Fed-Biz-Ops; however, there does not appear to be an actual Amendment specifically annotating this change. Since the package requires acknowledgment of all amendments, is this an amendment that must be acknowledged in the proposal? Please advise.
A: Refer to original solicitation for this project (VA-245-09-RP-0181) which list all amendments for the solicitation.
Q:
RFI # 5) This project does not appear to affect a roadway as mentioned and info requested in the technical aspect?
5) The Offeror shall describe in a written narrative the plan for phasing the work so that the facility remains operational while utilities and access roadways are realigned. The narrative will also detail how the contractor intends to prepare the site, disassemble, relocate, reassemble, and reactivate utility services to the facility within any specified time limits.
Please advise.
A:
No roadways are involved with this project.
However, if the A/E determines that the existing Fire main serving the research building is too small to accommodate a 16,000 sq. ft. expansion and that the fire main needs to be replaced with a bigger one then, after building the new fire main at some time the research building will have to be switched over to the new main. That will require a utility shutdown, i. e. fire main, to accomplish the switch over.
Q:
RFI # 6) Is there a specific pricing Schedule that bidders are to fill out & submitt?
A: Proposal must show detailed accounting of labor, services, and supply, etc.
Q:
RFI # 7) Page 72 Part III - Proposal Requirements Section E. states "Carefully follow Instructions, Conditions.." this section is not found in the solicitation. Please advise.
A: Submit original and two (2) copies of Optional Form 308 with a bid guaranty that is valid for a six (6) month period.
Update #5 ·
Added: Jul 10, 2009 11:44 am
Modified: Jul 20, 2009 2:52 pmTrack Changes
This Modification is to inform prospective Vendors of the below issues:
1. The closing date for this solicitation is changed from August 10, 2009 to August 17, 2009.
2. The method of receiving documents for this solicitation is changed from prior announcements to: Vendors will submit an e-mail request for solicitation documentation to Robert.Perry2@VA.Gov and/or Dorrence.Carrington@VA.Gov. Solicitation material includes information and documentation to include project drawings and specifications.
3. All other conditions of the soliciation remains as stated in the original solicitation.
Update #4 ·
Added: Jul 10, 2009 11:44 am Modified: Jul 20, 2009 10:21 amTrack Changes This Modificaiton is to add solicitation drawings and specifications that did not post with the prior solicitation announcement.
Update #3 ·
Added: Jul 10, 2009 11:44 am Modified: Jul 16, 2009 4:08 pmTrack Changes In reference to Solicitation number VA-245-09-RP-0181 the Recovery Act - Research Building Sprinkler System - Project Number: 688-09-020. The site visit has been changed to July 17, 2009 at 10:00 AM at FMS Conference Room - BH-132.
Update #2 ·
Added: Jul 10, 2009 11:44 am Modified: Jul 10, 2009 3:04 pmTrack Changes Recovery Act - Solicitation No. VA 245-09-RP-0181. The Department of Veteran Affairs is seeking a construction contractor to replace a sprinkler system at VA Medical Center, Research Building, 50 Irving Street, NW, Washington, DC. Project No. 688-09-020. Competition for this procurement is an 8(a) set-aside. The contractor shall provide the labor, materials, equipment and supplies to replace the Research Building's sprinkler system. The replacement system shall conform to VA guidelines. Completion time is 160 calendar days after the receipt of the notice to proceed. The estimated cost range for this project is between $200,000.00 to $500,000.00. The firm must be a general construction firm approved under NAICS Code 236220 and the size standard is $31. Million. The offeror shall obtain any and all necessary licenses or permits required to perform this work in the District of Columbia. Offers will be accepted only from responsible contractors. General proposals will be evaluated and award will be made on the basis of both cost and technical considerations most advantageous to the government as per FAR Part 15. In descending order of importance, evaluations will be based on cost, construction management, past performance, and schedule. Technical Evaluation Criteria for this solicitation shall be included in the solicitation. Prospective contractors may acquire solicitation documents, which are only available in .pdf electronic format by registering and downloading plans and specifications from the FedBizOpps website www.fbo.gov (to access export controlled solicitation, vendor must have an MNPN in CCR, a DUNS number and must be registered in FedBisOpps. A site visit (pre-proposal conference) is scheduled for July 16, 2009 @ 10am. Report to VA Medical Center, Facilities Management Service, 50 Irving Street, NW, #BH-132, Washington, DC 20422. Solicitation documents will be available on or about July 16, 2009. Approximate proposal due date is August 10, 2009. Award of a fix-firm price construction contract is anticipated to be approximately August 14, 2009. There will be no public opening. The proposal will be evaluated and award shall be made utilizing the best value method under FAR Part 15. Firms are advised that award may be made without discussions or any contact concerning the proposal received. Please consult the list of current viewers if you cannot open a file. Procurement is subject to availability of funds.
Update #1 ·
Added: Jul 10, 2009 11:44 am Recovery Act - Solicitation No. VA 245-09-RP-0181. The Department of Veteran Affairs is seeking a construction contractor to replace a sprinkler system at VA Medical Center, Research Building, 50 Irving Street, NW, Washington, DC. Project No. 688-09-020. Competition for this procurement is an 8(a) set-aside. The contractor shall provide the labor, materials, equipment and supplies to replace the Research Building's sprinkler system. The replacement system shall conform to VA guidelines. Completion time is 160 calendar days after the receipt of the notice to proceed. The estimated cost range for this project is between $200,000.00 to $500,000.00. The firm must be a general construction firm approved under NAICS Code 236220 and the size standard is $31. Million. The offeror shall obtain any and all necessary licenses or permits required to perform this work in the District of Columbia. Offers will be accepted only from responsible contractors. General proposals will be evaluated and award will be made on the basis of both cost and technical considerations most advantageous to the government as per FAR Part 15. In descending order of importance, evaluations will be based on cost, construction management, past performance, and schedule. Technical Evaluation Criteria for this solicitation shall be included in the solicitation. Prospective contractors may acquire solicitation documents, which are only available in .pdf electronic format by registering and downloading plans and specifications from the FedBizOpps website www.fbo.gov (to access export controlled solicitation, vendor must have an MNPN in CCR, a DUNS number and must be registered in FedBisOpps. A site visit (pre-proposal conference) is scheduled for July 16, 2009 @ 10am. Report to VA Medical Center, Facilities Management Service, 50 Irving Street, NW, #BH-132, Washington, DC 20422. Solicitation documents will be available on or about July 16, 2009. Approximate proposal due date is August 10, 2009. Award of a fix-firm price construction contract is anticipated to be approximately August 14, 2009. There will be no public opening. The proposal will be evaluated and award shall be made utilizing the best value method under FAR Part 15. Firms are advised that award may be made without discussions or any contact concerning the proposal received. Please consult the list of current viewers if you cannot open a file. Procurement is subject to availability of funds.
Files
| File | Type | Posted |
|---|---|---|
| VA-245-09-RP-0181-0011000.DOC | DOC document | |
| VA-245-09-RP-0181-0010000.DOC | DOC document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Research Building Sprinkler System Expansion (BUILD) | Award Notice | |
| This notice | Award Notice |