Recovery - vexar rigid tube replacement/maintenance, 3 year project, fortine ranger district, kootenai national forest, montana

Award Notice Posted

Solicitation number
AG-82B1-S-10-0024
Agency
Awarded
to W P & H C Incorporated
Set-aside
Total Small Business

Opportunity facts

Contract number
AG82B1P100056 Federal contract award
NAICS code
115310 Support Activities for Forestry
PSC
Not on record
Place of performance
Fortine Ranger District, Kootenai National Forest Fortine, Montana 59918, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·



RECOVERY - NOTE THIS SOLICITATION WAS PREVIOUSLY LISTED AS AG-82B1-S-10-0024 AND IS SUPERSEDED BY THIS SOLICITATION AG82B1-S-10-0069. ALL TERMS AND CONDITIONS ARE IDENTICAL TO THE SUPERSEDED SOLICITATION.



CONTINUATION OF DESCRIPTION FROM ABOVE:



The Government supplies the flexible replacement netting and bamboo. The Contractor furnishes the labor, supervision, transportation and incidentals to complete flexible netting maintenance or removal. The Government supplies will be located at the tree cooler at the Fortine Ranger Station. Payment is by the acre of maintenance for each unit and bid item.



Some items may be irregular shelterwood units that have harvest holes of half to three acres in size in that require walking two chains between holes in the same unit to do the flexible netting maintenance



Permission to work behind a gated road closure and gate key shall be obtained from the Fortine Ranger District prior to working behind closed gates.



Location - The work is located on Fortine Ranger District of the Kootenai National Forest. The work site, access to the area, method of work, size of units, and other information pertinent to each flexible netting unit is listed on the attached vicinity map and individual unit maps. Project base maps are available at the Fortine Ranger Station.

Update #1 ·

RECOVERY - Description - This contract requires replacement of already installed older flexible netting that may need replacement of the flexible netting or rotted bamboo sticks that support the plastic flexible netting. Flexible netting maintenance involves weaving bamboo through the flexible netting plastic webbing twice and then placing the flexible netting over a seedling and pounding the bamboo into the ground 4 with a piece of slash or other hammer device. Flexible netting removed from a dead seedling and not reused in the same unit shall be carried down to the nearest drivable road and stacked in a pile for pickup by the Forest Service at a later time. Work is on uneven ground, slippery slash and on steep slopes where the footing is not the best, and during all types of adverse weather conditions.

Files

File Type Posted
A-1 S-10-0069.pdf PDF
S-10-0069 B-M Final.docx DOCX document
ATTACHMENT 4.tif TIF image
attachment 2.tif TIF image
attachment 1.tif TIF image
s-10-0069- COVER.pdf PDF
ATTACHMENT 3.tif TIF image