Recovery--R--arra - project number 57420 - FY09 saginaw dredge material disposal facility (DMDF) effluent monitoring, zilwaukee, michigan
Award Notice Posted
- Solicitation number
- W911XK-09-D-0014-0001
- Agency
-
ENDIST Detroit
US Army Corps of Engineers, Department of Defense
- Awarded
- to Futurenet Group, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W911XK-09-D-0014-0001 Federal contract award
- NAICS code
- 541330 Engineering Services
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
This project will involve the collection and analysis of pond water samples from within the DMDF, effluent samples at outfall 001, background samples from the Saginaw River, and groundwater well monitoring. In accordance with proposed sampling map. It is expected that samples collected from within the DMDF and the outfall can be collected with the use of hand tools such as a peristaltic pump and by hand sampling in the effluent. Samples collected from the Saginaw River will require use of a boat. ESTIMATED COST OF THIS PROJECT IS BETWEEN $50,000 AND $70,000.00. NOTE: ADDITIONAL SAMPLING REQUIRED - THIS WILL BE A MODIFICATION TO AN EXISTING DELIVERY ORDER. THIS PROCUREMENT WAS SET-ASIDE FOR THE
8(A) PROGRAM. CONTRACTOR: FUTURENET GROUP, INC. 12801 AUBURN ST., DETROIT, MI 48223-3413 - DUNS NO. 933549230
Update #1 ·
This contract action was accomplished using other than competitive procedures because this is an order under an existing contract that was awarded using non-competitive procedures.
This Scope of Work (SOW) has been developed by the U.S. Army Corps of Engineers - Detroit District (COE) to provide for the proper implementation of multiple surface water sampling events at the Saginaw River Dredge Material Disposal Facility (DMDF), Zilwaukee, Michigan. This SOW will be reviewed and approved by the COE, coordinating State and Federal Agencies, the Contractor, and Environmental Services Laboratory. The purpose of this project is to characterize pond water within the DMDF prior to discharge, conduct periodic monitoring of effluent when discharged from the DMDF, and to determine background concentrations within Saginaw River for select parameters, for the purpose of estimating environmental impacts of discharging water from the DMDF. NOTE: THIS PROCUREMENT WAS SET-ASIDE FOR THE 8(A) PROGRAM.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity