Recovery Project ND PRA THRO 10(3), North Unit Scenic Drive

Award Notice Posted

Solicitation number
DTFH68-09-B-00017
Agency
Awarded
to DLM Contracting Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH68-09-C-00023 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Theodore Roosevelt National Park Medora, North Dakota 58645, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

All Schedule A and Option X items are accepted.

Update #2 ·

We anticipate advertising this project no later than mid-April, however, advertisement is contingent upon receipt of Recovery and Reinvestment Act funds.





PROJECT DETAILS: The base scheduled for this project will consist of the rehabilitation, restoration, and resurfacing (3R) of approximately 5.36 miles of Route 10 from the Park Entrance to 0.4 miles past the Squaw Creek Bridge. Rehabilitation consists of pulverizing the existing asphalt and base to a depth of 7 inches and resurfacing with 3.5 inches of Superpave Hot Asphalt Concrete Pavement. Also included are the replacement of guardrail end terminals, curb, paved ditch, some drainage structures, and Stream Bank stabilization with gabion baskets. .



In addition to the Main Entrance Road, 4 existing parking areas will be rehabilitated with new concrete curb and sidewalk. All of the rehabilitated parking area will meet existing dimensions. One new parking area will be constructed at the Buckhorn Trail Head. This will formalize a structurally stable parking area in place of a deteriorated paved ditch.



This project will also include subexcavation, backfill, and resurfacing several locations along Route 10. These areas were damaged by haul vehicles during a previous project and will be repaired and resurfaced to meet the proposed structural section of the adjacent pavement.



It is anticipated that this will be a single-season project. The project is anticipated to begin this spring and extend to late summer of 2009.



This project is located about 15 miles south of Watford City, North Dakota in McKenzie County. The proposed project is in rolling and mountainous terrain. Elevation is approximately 5000 ft. The route is wholly within Theodore Roosevelt National Park.



There is one Option Scheduled for this project which consists of constructing a single chip seal on the remaining portion of the Main Entrance Road from the end of the 3R project to the Oxbow Overlook, from approx. MP 5.36 to MP 14.0. The chip seal will include all existing parking areas within these limits. Pavement markings and signs will be replaced in kind.



Principal work items on the base schedule include: lump sum contractor testing; 1,300 ln ft of silt fence; removal of 7,000 sq yd of asphalt pavement; 19,000 cu yds of subexcavation; 14,400 cu yds of select borrow; 480 cu yds of embankment construction; 31,500 sq yds of geogrid; 300 cu yds of placed riprap (various class); 590 cu yds of galvanized or aluminized coated gabions; 94,500 sq yds of pulverizing; 12,100 tons of roadway aggregate; 21,000 tons of Superpave pavement; 520 ln ft of pipe culvert (various sizes); 1,400 ln ft of concrete curb; 2,200 ln ft of asphalt curb; 16,200 sq yds of hydraulic seeding; 16,200 sq yds of hydraulic mulching; lump traffic and safety supervisor; 7,500 hours of traffic control (flagger and pilot car). All of the above along with associated survey and staking; removal of structures and obstructions; raising guardrail; and temporary traffic control devices.



Advertisement of this project is based upon receipt of Economic Recovery money.

Update #1 ·

THE TENTATIVE ADVERTISEMENT DATE FOR THIS PROJECT IS MARCH 24, 2009.





PROJECT DETAILS: The base scheduled for this project will consist of the rehabilitation, restoration, and resurfacing (3R) of approximately 5.36 miles of Route 10 from the Park Entrance to 0.4 miles past the Squaw Creek Bridge. Rehabilitation consists of pulverizing the existing asphalt and base to a depth of 7 inches and resurfacing with 3.5 inches of Superpave Hot Asphalt Concrete Pavement. Also included are the replacement of guardrail end terminals, curb, paved ditch, some drainage structures, and Stream Bank stabilization with gabion baskets. .



In addition to the Main Entrance Road, 4 existing parking areas will be rehabilitated with new concrete curb and sidewalk. All of the rehabilitated parking area will meet existing dimensions. One new parking area will be constructed at the Buckhorn Trail Head. This will formalize a structurally stable parking area in place of a deteriorated paved ditch.



This project will also include subexcavation, backfill, and resurfacing several locations along Route 10. These areas were damaged by haul vehicles during a previous project and will be repaired and resurfaced to meet the proposed structural section of the adjacent pavement.



It is anticipated that this will be a single-season project. The project is anticipated to begin this spring and extend to late summer of 2009.



This project is located about 15 miles south of Watford City, North Dakota in McKenzie County. The proposed project is in rolling and mountainous terrain. Elevation is approximately 5000 ft. The route is wholly within Theodore Roosevelt National Park.



There is one Option Scheduled for this project which consists of constructing a single chip seal on the remaining portion of the Main Entrance Road from the end of the 3R project to the Oxbow Overlook, from approx. MP 5.36 to MP 14.0. The chip seal will include all existing parking areas within these limits. Pavement markings and signs will be replaced in kind.



Principal work items on the base schedule include: lump sum contractor testing; 1,300 ln ft of silt fence; removal of 7,000 sq yd of asphalt pavement; 19,000 cu yds of subexcavation; 14,400 cu yds of select borrow; 480 cu yds of embankment construction; 31,500 sq yds of geogrid; 300 cu yds of placed riprap (various class); 590 cu yds of galvanized or aluminized coated gabions; 94,500 sq yds of pulverizing; 12,100 tons of roadway aggregate; 21,000 tons of Superpave pavement; 520 ln ft of pipe culvert (various sizes); 1,400 ln ft of concrete curb; 2,200 ln ft of asphalt curb; 16,200 sq yds of hydraulic seeding; 16,200 sq yds of hydraulic mulching; lump traffic and safety supervisor; 7,500 hours of traffic control (flagger and pilot car). All of the above along with associated survey and staking; removal of structures and obstructions; raising guardrail; and temporary traffic control devices.



Advertisement of this project is based upon receipt of Economic Recovery money.

Files

File Type Posted
throA003.pdf PDF
throA002.pdf PDF
throA001.pdf PDF
IFB.pdf PDF