RECOVERY--N--Furnish and Install Three (3) Electric Hoist Motor Units (Acutators) at the Cache River Floodgate, Mound City, IL, Project Number 107061.

Award Notice Posted

Solicitation number
W912EQ10Q0019
Agency
Awarded
to Becker, Diane
Set-aside
No set-aside

Opportunity facts

Contract number
W912EQ-10-P-0070 Federal contract award
NAICS code
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Contractor Shall Furnish Labor, Materials, Equipment, Transportation, Supervision, and Performing All Operations in Connection with the Removal of All Three Existing Hoisting Units. Installing and Testing Three New Electric Motor-Operated Hoist Units Complete with Necessary Accessories and Appurtenances for Cache River Culvert in Mound City, IL. The New Units shall be Limoitorque Model L120 or Approved Equal and Compatible for Existing EIM Units.

Update #3 ·

Solicitation Number: W912EQ-10-Q-0019

Agency: Department of the Army

Office: U. S. Army Corps of Engineers

Location: USACE District Memphis

Notice Type: Award

Contract Award Date: March 17, 2010

Contract Award Number: W912EQ-10-P-0070

Contract Award Dollar Amount: $133,114.00

Contractor Awarded Name: Nautical Resource, The (DUNS 961738874)

Contractor Awarded Address: 514 Dow Ave, Celina, TN 38551-4114

Update #2 ·

RESPONSE TO QUESTIONS:

1. IS A 20% BID BOND REQUIRED? ANSWER: NO

2. WILL A PAYMENT AND PERFORMANCE BOND BE REQUIRED? ANSWER: NO

3. WHAT ARE THE AMOUNT OF CALENDAR DAYS ALLOWED TO COMPLETE THIS PROJECT? ANSWER: 180 CALENDAR DAYS

4. WILL OUR CERTIFICATE FOR THE CORPS OF ENGINEERS TRAINING COURSE: CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS NEED TO BE RETAKEN FOR THIS PROJECT? IF SO, WILL MEMPHIS PROVIDE THIS COURSE AGAIN? ANSWER: CERTIFICATE OF QUALITY MANAGEMENT (QM) CERTIFICATIONS IS NOT REQUIRED FOR SUPPLIES AND SERVICES CONTRACTS. CERTIFICATES ARE VALID FOR 5 YEARS. BUT THIS REQUIREMENT IS NEGATED FOR THE SUBJECT TASK ORDER

5. IS THE PROJECT EXEMPT FOR SALES TAX? ANSWER: YES
END OF QUESTIONS.

Update #1 ·

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

The work includes furnishing labor, material, and equipment, transportation, and supervision, and performing all operations in connection with the removal of all three existing hoisting units, installing, and testing of three new electric motor-operated hoist units complete with necessary accessories and appurtenances for Cache River Culvert in Mound City, Illinois. The new units shall be Limitorque Model L120 or approved equal and compatible with existing EIM units.