RECOVERY-- MXDP031040P2 - Repair/Upgrade HVAC P2, Network Control Center, B241, Laughlin AFB, TX

Award Notice Posted

Solicitation number
F2R3C19036A001
Agency
Awarded
to Mapco, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
FA3099-06-D-0003-0006 Federal contract award
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Not on record
Place of performance
Laughlin AFB Del Rio, Texas 78843, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE MULTIPLE AWARD CONSTRUCTION CONTRACT PROGRAM AT LAUGHLIN AFB. Project is to provide a new HVAC system to support the addition of new heat producing equipment that increased the load on the current system.

Update #3 ·

THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE MULTIPLE AWARD CONSTRUCTION CONTRACT PROGRAM AT LAUGHLIN AFB. Repair/upgrade the HVAC equipment in building 241 at Laughlin AFB, TX. Provide all A/E Services for the design-build of the new HVAC system for the server room/ NCC area. The design will require development of specifications and calculations for a hot water reheat system. This reheat system will be installed by the contractor and piped from the mechanical room over to each of the two Liebert units. The Liebert units are currently servicing the NCC server area. The new design will consider every aspect affected by the hot water reheating system, such as, but not limited to; piping schemes to incorporate the reheating system, new boiler specifications in order to meet current requirements and energy efficiency ratings, and specifications for a hot water pump. Remove/replace one air cooled chiller, remove/replace one air handler unit and associated ductwork, remove existing HVAC controls systems (pneumatic systems, Johnson DSC, and electrical controls), install direct digital controls (DDC), install a fan coil unit, remove/replace the building fire alarm panel and install fire detection and signaling devices inside the NCC and network server areas. The estimated magnitude of this project is between $250,000 and $500,000. The Request for Proposal will be issued on or about 24 Feb 2009 and will close on or about 9 March 2009.



Update #2 ·

This is a fixed price order against an existing contract using competitive procedures.

Update #1 ·

RECOVERY – Design-Build Repair/Upgrade HVAC Building 241 Network Control Center THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE MULTIPLE AWARD CONSTRUCTION CONTRACT PROGRAM AT LAUGHLIN AFB. Repair/upgrade the HVAC equipment in building 241 at Laughlin AFB, TX. Provide all A/E Services for the design-build of the new HVAC system for the server room/ NCC area. The design will require development of specifications and calculations for a hot water reheat system. This reheat system will be installed by the contractor and piped from the mechanical room over to each of the two Liebert units. The Liebert units are currently servicing the NCC server area. The new design will consider every aspect affected by the hot water reheating system, such as, but not limited to; piping schemes to incorporate the reheating system, new boiler specifications in order to meet current requirements and energy efficiency ratings, and specifications for a hot water pump. Remove/replace one air cooled chiller, remove/replace one air handler unit and associated ductwork, remove existing HVAC controls systems (pneumatic systems, Johnson DSC, and electrical controls), install direct digital controls (DDC), install a fan coil unit, remove/replace the building fire alarm panel and install fire detection and signaling devices inside the NCC and network server areas. The estimated magnitude of this project is between $250,000 and $500,000. The Request for Proposal will be issued on or about 24 Feb 2009 and will close on or about 9 March 2009.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors