Recovery: little popple north culvert replacement eagle river/florence ranger district chequamegon-nicolet national forest, forest county, wisconsin
Award Notice Posted
- Solicitation number
- AG-4419-S-10-0555
- Agency
-
Operations Center East
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Krueger & Steinfest Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-4419-C-10-0485 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Usda Forest Service Chequamegon-Nicolet National Forest Eagle River/Florence Ranger District Laona, Wisconsin 54541, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
*PRE-BID MEETING*
DATE: MAY 5, 2010
TIME: 9:00AM (CST)
LOCATION: USDA FOREST SERVICE. CHEQUAMEGON-NICOLET NF
LAKEWOOD-LAONA RANGER DISTRICT OFFICE
4978 HWY 8 WEST
LAONA, WI 54541
COR: RICHARD AHLFS - (715) 674-4481
******************************************************************************************************************
RECOVERY DESCRIPTION: The intent of this project is to remove existing culverts, assemble and install new Three Sided Concrete Box Culvert, provide erosion control and reconditioning of existing road along with asphalt surface as well as simulated stream bottom at the Little Popple North Culvert Replacement Chequamegon-Nicolet National Forest, Eagle River/Florence Rnager District, Forest County, WI.
PROJECT LOCATION: From Rhinelander Wisconsin, travel East on State Hwy 8, 47 miles to State Hwy 139. Then travel North 11 miles to Popple River Road. Then travel west 0.1 miles to the site which is on Popple River Road in Forest County, Wisconsin.
Price Range for this project is: Between $100,000 - $250,000.
*THIS PROCUREMENT IS HEREBY DETERMINED "UNRESTRICTED" FOR FULL & OPEN COMPETITION*
RECOVERY: This project is funded in whole by the American Recovery & Reinvestment Act (ARRA).
ALL VENDORS ARE REQUIRED TO BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR/ORCA) PRIOR TO AWARD OF A CONTRACT, HTTP:://WWW.CCR.GOV/
******************************************************************************************************************
*NOTICE: FACSIMILE/EMAIL PROPOSALS ARE NOT ACCEPTABLE*
Update #1 ·
RECOVERY DESCRIPTION: Little Popple North Culvert Replacement - Chequamegon-Nicolet National Forest - Eagle River/Florence Ranger District. Project is to remove existing culverts, assemble and install new Three Sided Concrete Box Culvert, provide erosion control and reconditioning of existing road along with asphalt surface as well as simulated stream bottom.
PROJECT LOCATION: From Rhinelander Wisconsin, travel East on State Hwy 8, 47 miles to State Hwy 139. Then travel North 11 miles to Popple River Road. Then travel west 0.1 miles to the site which is on Popple River Road in Forest County, Wisconsin.
PRICE RANGE: The Government Estimate is between: $100,000 - $250,000.
Set a-side determination will be made at time of Solicitation Posting.
RECOVERY: This project is funded in whole by the American Recovery & Reinvestment Act (ARRA).
ALL VENDORS ARE REQUIRED TO BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR) PRIOR TO AWARD OF A CONTRACT, HTTP:://WWW.CCR.GOV/
Files
| File | Type | Posted |
|---|---|---|
| Little Popple North Prebid List.pdf | ||
| Experience Capability Statement 0555.doc | DOC document | |
| SF 1442 Cover Pg.pdf | ||
| Drawings.pdf | ||
| SF 1442 Cont _ 0555.docx | DOCX document | |
| Standard Specifications.doc | DOC document | |
| DBA.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity