Recovery: horse fly TS road restoration. This notice is provided for information purposes only. This opportunity is available only to contractors with TRI-forest road maintenance multiple award contracts under solicitation AG-04M3-S-09-0017.
Award Notice Posted
- Solicitation number
- AG-0489-S-10-0165
- Agency
-
Operations Center Northwest
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Iron Triangle LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG04M3C090022-AG0489D100111 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Wallowa Whitman National Forest 1550 Dewey Avenue P O Box 907 Baker City, Oregon 97814, United States
Notice details come from SAM.gov. Updated .
Notice text
Task order project will include: 2.5 miles of reconstruction work on 3 separate roads to prepare roads for timber haul. Two segments, approximately 0.1 miles each are road re-alignments consisting of clearing and grubbing, excavation, and a culvert installation. The third road, approximately 2.3 miles, requires reshaping and spot rocking. Work includes road-side clearing, reconditioning and excavation work on existing roadbed, drain dip and water bar construction, and spot rocking with grid-rolled aggregate from a Forest Service source. Anticipated period of performance for this task order is 30 calendar days after notice to proceed. The Government intends to place a firm fixed price task order on or before June 1, 2010.
The resulting order shall utilize funds provided by the American Recovery and Reinvestment Act (ARRA) of 2009. Inclusion of unique provisions required implementing the Act, including those for significant reporting and transparency requirements by the successful offeror will be required.
Notice history
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity