Recovery - hidden creek and fix creek fish passage culverts, north fork ranger district, clearwater national forest
Award Notice Posted
- Solicitation number
- AG-82B1-S-10-0120
- Agency
-
Operations Center Intermountain
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Stone Ridge Construction, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-82B1-C-10-0104 Federal IDV award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- see locations listed above, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
ATTACHED IS THE LETTER OF INTENT TO AWARD.
Update #1 ·
RECOVERY - The Fix Creek Bridge project involves the removal of an existing culvert and the replacement with a new 37' span by 16' wide Trideck beam bridge. Improvements consist of but are not limited to structural excavation, excavation and reshaping of the channel, placement of in-stream step pool structures, placement of riprap, installation of precast concrete abutments and prestressed concrete beams, embankment and excavation of the roadway approcahes, and road surfacing.
The Hidden Creek Bridge project involves the removal of an existing culvert and the replacement with a new 46' span by 16' wide Trideck beam bridge. Improvements consist of but not limited to structural excavation, excavation and reshaping of the channel, placement of in-stream step pool structures, placement of riprap, installation of precast concrete abutments and prestressed concrete beams, embackment and excavation of the roadway approaches and road surfacing.
The projects are located on Road No. 250 at milepost 56.0 and 57.13 on the North Fork Ranger District of the Clearwater National Forest, approximately 56 miles northeasterly from Pierce on NFS Road 250 in Clearwater County, Idaho (Section 16, T40N., R10E)
The project cost estimate is between $100,000 and $250,000. Performance and payment bonds will be required per the Miller Act and Davis Bacon wage rates will apply.
All responsible sources may submit a bid which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by calling 888-227-2423 or via the Internet at http://www.ccr.gov//.
Files
| File | Type | Posted |
|---|---|---|
| Friday March 05 2010 | — | |
| SF 30 AMEND 1.PDF | ||
| 9-HC250 Cross Sections.pdf | ||
| 0-HC250 Cvr.pdf | ||
| 5-HC250 Superstructure Plan.pdf | ||
| Wage determination.txt | TXT text file | |
| 6-HC250 Superstructure Details.pdf | ||
| FC-250.pdf | ||
| 10-FC250 Cross Sections.pdf | ||
| 2-HC250 Road Plan Profile.pdf | ||
| 8-HC250 Stream Details.pdf | ||
| 2-FC250 Road Plan Profile.pdf | ||
| 8-FC250 Stream Details.pdf | ||
| HC-250.pdf | ||
| 3-FC250 Stream Plan Profile.pdf | ||
| 0-FC250 Cvr.pdf | ||
| 1-HC250 Trideck Section Quantities.pdf | ||
| Special Requirements.doc | DOC document | |
| 5-FC250 Superstructure Plan.pdf | ||
| 7-FC250 Curb Details.pdf | ||
| 9-FC250 Cross Sections.pdf | ||
| 4-FC250 Abutment Details.pdf | ||
| AG-82B1-S-10-0120.pdf | ||
| 10-HC250 Cross Sections.pdf | ||
| 1-FC250 Trideck Section Quantities.pdf | ||
| 7-HC250 Curb Details.pdf | ||
| FC250 SPS - Final Submittal.doc | DOC document | |
| 6-FC250 Superstructure Details.pdf | ||
| 4-HC250 Abutment Details.pdf | ||
| SF 1442.PDF | ||
| 3-HC250 Stream Plan Profile.pdf | ||
| Amendment 001 | — |
Show all 32