Recovery--H--project number 145341 depot slough, south coast; 145334 siuslaw south coast

Award Notice Posted

Solicitation number
W9127N08D0004
Agency
Awarded
Set-aside
No set-aside

Opportunity facts

Contract number
W9127N-08-D-0004 T/O 0005 MOD 01
NAICS code
561330 Professional Employer Organizations
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

31 versions

Update #31 · Latest ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): THOMAS/WRIGHT, INC. W9127N-08-D-0004, TASK ORDER 0013, MODIFICATION 05

Portland District Corps of Engineers issued a task order using Recovery Act funding for Contract No. W9127N-08-D-0004, Task Order 0013, Modification 05, awarded to Thomas/Wright, Inc., for work specifically funded under ARRA for quality assurance services. The amount of this task order is $39,500.00, for CLINS 7101, 7102, 7121, and 7122.

Update #30 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): THOMAS/WRIGHT, INC., W9127N-08-D-0004, TASK ORDER #0013, MODIFICATION 05

Portland District Corps of Engineers intends to issue Task Order #0013, Modification 05, using American Recovery and Reinvestment Act (ARRA) funding, under Contract No. W9127N-08-D-0004 awarded to Thomas Wright, Inc. for quality assurance inspections for the South Coast Dredging Projects located in Depot Slough and Siuslaw Turning Basin, located in the State of Oregon. This task order will increase contract line item numbers (CLINs) 7101 in the amount of $14,364.80; 7102 in the amount of $20,577.92; 7121 in the amount of $201.60; and 7122 in the amount of $4,355.68 established specifically for work that falls under ARRA. This action will increase the task order by a total of $39,500.00, not decrease by $39,500.00 as previously posted.

Update #29 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, INC. W9127N-08-D-0004, Task Order #0013, Modification 05

Portland District Corps of Engineers intends to issue Task Order #0013, Modification 05, using American Recovery and Reinvestment Act (ARRA) funding, under Contract No. W9127N-08-D-0004 awarded to Thomas Wright, Inc. for quality assurance inspections for the South Coast Dredging Projects located in Depot Slough and Siuslaw Turning Basin, located in the State of Oregon. This task order will increase contract line item numbers (CLINSs) 7101 in the amount of $14,364.80; 7102 in the amount of $20,577.92; 7121 in the amount of $201.60; and 7122 in the amount of $4,355.68 established specifically for work that falls under ARRA. This action will decrease the task order by a total amount of $39,500.00.

Update #28 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): THOMAS/WRIGHT, INC., W9127N-08-D-0004, T/0 15, MOD 04

Portland District Corps of Engineers issued a task order modification using recovery act funding to Thomas/Wright, Inc., to increase funding in the amount of $30,000.00 for Contract Line Item Numbers 7111, 7112, and 7123 for work specifically funded under ARRA for quality assurance services.

Update #27 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): THOMAS/WRIGHT, INC., W9127N-08-D-0004

Portland District Corps of Engineers intends to issue Modification 04 to Task Order 0015 using American Recovery and Reinvestment Act funding under Contract No. W9127N-08-D-0004, awarded to Thomas/Wright, Inc. for quality assurance inspections. This modification will increase funding per the following Contract Line Item Nos. established specifically for work that falls under ARRA: CLIN 7111 in the amount of $21,392.80; CLIN 7112 in the amount of $8,572.00; and CLIN 7123 in the amount of $35.20.

Update #26 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, Inc., W9127N-08-D-0004

Portland District Corps of Engineers issued a task order using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0015, Modification 03, awarded to Thomas/Wright, Inc., for quality assurance inspections at Bonneville Dam, Oregon, for the Bonneville Spillway Gate Pit Repair project. This action increased CLIN's 7107, 7108, and 7123 by a total amount of $79,850.00.

Update #25 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, INC. W9127N-08-D-0004

Portland District Corps of Engineers intends to issue a task order modification using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0015, awarded to Thomas/Wright, Inc., for quality assurance inspections at Bonneville Dam, Oregon, for the Bonneville Spillway Gate Pit Repair project. This will increase CLIN 7107 in the amount of $59,241.60; CLIN 7108 in the amount of $20,572.80; and CLIN 7123 in the amount of $35.60; established specifically for work that falls under ARRA. This action will increase the task order by a total amount of $79,850.00.

Update #24 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, Inc., W9127N-08-D-0004

This is a correction to Task Order #0013, Modification 04, post submitted on March 24, 2010 at 4:28 PM.
Portland District Corps of Engineers intends to issue Task Order #0013, Modification 04, using American Recovery and Reinvestment Act (ARRA) funding, under Contract No. W9127N-08-D-0004 awarded to Thomas Wright, Inc. for quality assurance inspections for the dredging Channels & Harbor Projects located in Pacific County and Cowlitz County, Washington State. This task order will decrease contract line item numbers (CLINSs) 7101 in the amount of $8,259.79; 7102 in the amount of $14,498.08; 7119 in the amount of $3,776.39; 7120 in the amount of $1,948.00; 7121 in the amount of $258.30; 7122 in the amount of $1,210.46; and 7123 in the amount of $20.00, established specifically for work that falls under ARRA. This action will decrease the task order by a total of $29,970.99.

Update #23 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, Inc. W9127N-08-D-0004

Portland District Corps of Engineers intends to issue Task Order #0013, Modification 04, using American Recovery and Reinvestment Act (ARRA) funding, under Contract No. W9127N-08-D-0004, awarded to Thomas/Wright, Inc. for quality assurance inspections. The task order will decrease contract line item numbers (CLINs) 7101 in the amount of $9,696.24; 7102 in the amount of $14,731.92; 7119 in the amount of $11,927.41; and 7122 in the amount of $4069.51 established specifically for work that falls under ARRA. This action will decrease the task order by a total amount of $40,425.08.

Update #22 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, Inc. W9127N-08-D-0004

Portland District Corps of Engineers issued a task order using recover act funding for Contract W9127N-08-D-0004, Task Order 0015, Modification 02, awarded to Thomas/Wright, Inc, adding CLIN's for work specifically funded under ARRA for quality assurance services. The amount of this task order is $19,800.00 for CLINS 7107 and 7123.

Update #21 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, Inc. W9127N-08-D-0004

Portland District Corps of Engineers intends to issue a task order modification using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0015, awarded to Thomas/Wright, Inc., for quality assurance inspections at Bonneville Dam for the Bonneville Domestic Water project. This will increase CLIN 7107 in the amount of $19,747.20; and CLIN 7123 in the amount of $52.80; established specifically for work that falls under ARRA. This action will increase the task order by a total amount of $19,800.00.

Update #20 ·

Portland District Corps of Engineers issued a task order using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0018, awarded to Thomas/Wright, Inc., adding CLINs for work specifically funded under ARRA for quality assurance services. The amount of this task order is $27,300.00 for CLINs 7107, 7108, 7113, 7114, 7122, and 7123.

Update #19 ·

Portland District Corps of Engineers intends to issue a Task Order 0018 using American Recovery and Reinvestment Act (ARRA) funding, under Contract No. W9127N-08-D-0004 awarded to Thomas/Wright, Inc. for quality assurance inspections. This modification will increase funding per the following Contract Line Item Numbers established specifically for work that falls under ARRA: CLIN 7107 in the amount of $9,873.60; CLIN 7108 in the amount of $2678.75; CLIN 7113 in the amount of $9370.40; CLIN 7114 in the amount of $1,171.30; CLIN 7122 in the amount of $4000.00; CLIN 7123 in the amount of 205.95. This action will increase the task order by a total amount of $27,300.00.

Update #18 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, INC. W9127N-08-D-0004

Portland District Corps of Engineers intends to issue Modification 02 to Task Order 0013 using American Recovery and Reinvestment Act (ARRA) funding, under Contract No. W9127N-08-D-0004 awarded to Thomas/Wright, Inc. for quality assurance inspections. This modification will increase funding per the following Contract Line Item Numbers (CLINs) 7119 in the amount of $15,703.80; 7120 in the amount of $1,948.00; and 7122 in the amount of $2,348.20 established specifically for work that falls under ARRA. This action will increase the task order by a total amount of $20,000.00.

Update #17 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, INC, W9127N-08-D-0004

Portland District Corps of Engineers issued a task order modificationusing recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0015, Modification 01, awarded to Thomas/Wright, INC., including CLINS for work specifically funded under ARRA for quality assurance services. The amount of this modification is $15,000.00.

Update #16 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): THOMAS/WRIGHT, INC., W9127N-08-D-0004

Portland District Corps of Engineers intends to issue a Task Order 0015 using American Recovery and Reinvestment Act (ARRA) funding, under Contract No. W9127N-08-D-0004 awarded to Thomas/Wright, Inc. for quality assurance inspections. This modification will increase funding per the following Contract Line Item Numbers established specifically for work that falls under ARRA: CLIN 7107 in the amount of $2,468.40; CLIN 7108 in the amount of $4,286.00; CLIN 7111 in the amount of $2,468.40; CLIN 7112 in the amount of $4,286.00; and CLIN 7122 in the amount of $1491.20. This action will increase the task order by a total amount of $15,000.00.

Update #15 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, INC., W9127N-08-D-0004

Portland District Corp of Engineers issued a Task Order 0015 using American Recovery and Reinvestment Act funding under Contract No. W9127N-08-D-0004, Task Order #0015, awarded to Thomas/Wright, Inc. adding CLINS for work specifically funded under ARRA for quality assurance inspections. The amount of this Task Order is $97,000.00 for CLINS 7107, 7108, 7122, and 7123.

Update #14 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Thomas/Wright, Inc., W9172N-08-D-0004

Portland District Corp of Engineers intends to issue a Task Order 0015 using American Recovery and Reinvestment Act funding under Contract No. W9127N-08-D-0004 awarded to Thomas/Wright, Inc. for quality assurance inspections. This modification will increase funding per the following Contract Line Item Nos. established specifically for work that falls under ARRA: CLIN 7107 in the amount of $65,824.00; CLIN 7108 in the amount of $30,002.00; CLIN 7122 in the amount of $400.00; and CLIN 7123 in the amount of $774.00. This action will increase the task order by a total amount of $97,000.00.

Update #13 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): THOMAS/WRIGHT, INC., W9127N-08-D-0004

Portland District Corps of Engineers intends to issue a Modification 01 to Task Order 0013 using American Recovery and Reinvestment Act funding under Contract No. W9127N-08-D-0004, awarded to Thomas/Wright, Inc. for quality assurance inspections. This modification will increase funding per the following Contract Line Item Nos. established specifically for work that falls under ARRA: CLIN 7101 in the amount of $17,956.00; CLIN 7102 in the amount of $29,230.00; CLIN 7121 in the amount of $252.00; and CLIN 7122 in the amount of $2,562.00. This action will increase the task order by a total amount of $50,000.00.

Update #12 ·

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers issued a task order using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0013, awarded to Thomas/Wright, Inc., adding CLINs for work specifically funded under ARRA for quality assurance services. The amount of this task order is $64,000.00 for CLINs 7101-7136.

Update #11 ·

RECOVERY -- THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers intends to issue a Task Order 0013 using American Recovery and Reinvestment Act (ARRA) funding, under Contract No. W9127N-08-D-0004, awarded to Thomas/Wright, Inc. for quality assurance inspections. The task order will add contract line item numbers (CLINs) 7101 in the amount of $17,956.00, 7102 in the amount of $11,692.00, 7103 in the amount of $11,470.00, 7104 in the amount of $7,469.00, 7105 in the amount of $2,371.50, 7106 in the amount of $1,544.25, 7107 in the amount of $82.28, 7108 in the amount of $107.15, 7109 in the amount of $82.28, 7110 in the amount of $107.15, 7111 in the amount of $82.28, 7112 in the amount of $107.15, 7113 in the amount of $117.13, 7114 in the amount of $117.13, 7115 in the amount of $47.43, 7116 in the amount of $61.77, 7117 in the amount of $42.35, 7118 in the amount of $55.15, 7119 in the amount of $1,495.60, 7120 in the amount of $48.70, 7121 in the amount of $6.30, 7122 in the amount of $4,252.10, 7123 in the amount of $20.00, 7124 in the amount of $3,500.00, 7125 in the amount of $134.55, 7126 in the amount of $175.22, 7127 in the amount of $52.39, 7128 in the amount of $68.24, 7129 in the amount of $64.86, 7130 in the amount of $84.46, 7131 in the amount of $77.32, 7132 in the amount of $100.70, 7133 in the amount of $99.70, 7134 in the amount of $129.84, 7135 in the amount of $77.32, and 7136 in the amount of $100.70 established specifically for work that falls under ARRA. This action will increase the task order by a total amount of $64,000.00.

Update #10 ·

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers issued a task order Modification 02 using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0011, awarded to Thomas/Wright, Inc., for previously added CLINs for work specifically funded under ARRA for quality assurance services. The amount of this modification is decreased by $90,000.00 for CLINs 7001, 7002, 7005, 7006, 7021, 7021, and 7022.

Update #9 ·

RECOVERY -- THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers intends to issue a Modification 02 to Task Order 0011 using American Recovery and Reinvestment Act (ARRA) funding under Contract No. W9127N-08-D-0004, awarded to Thomas/Wright, Inc. for quality assurance inspections. The modification will decrease funding per the following Contract Line Item Nos. established specifically for work that falls under ARRA: CLIN 7001 in the amount of $27,878.40, CLIN 7002 in the amount of $38,573.00, CLIN 7005 in the amount of $7,356.80, CLIN 7006 in the amount of $8,383.20, CLIN 7021 in the amount of $1,008.00, and CLIN 7022 in the amount of $6,800.60. This action will decrease the task order by a total amount of $90,000.00.

Update #8 ·

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers issued a task order Modification 09 using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0005, awarded to Thomas/Wright, Inc., adding CLINs for work specifically funded under ARRA for quality assurance services. The amount of this modification is $10,000.00 for CLINs 7007, 7008, 7022, and 7023.

Update #7 ·

RECOVERY -- THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers intends to issue Modification 09 to Task Order 0005 using American Recovery and Reinvestment Act (ARRA) funding under Contract No. W9127N-08-D-0004, awarded to Thomas/Wright, Inc. for quality assurance inspections. The modification will add contract line item numbers (CLINs) 7007 in the amount of $7,027.68, 7008 in the amount of $2,600.00, 7022 in the amount of $200.00, and 7023 in the amount of $172.32 established specifically for work that falls under ARRA. This action will increase the task order by a total amount of $10,000.00.

Update #6 ·

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers issued a task order Modification 06 using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0005, awarded to Thomas/Wright, Inc., adding CLINs for work specifically funded under ARRA for quality assurance services. The amount of this modification is $41,500.00 for CLINs 7007, 7008, 7013, 7014, 7022, and 7023.

Update #5 ·

RECOVERY -- THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers intends to issue Modification 06 to Task Order 0005 using American Recovery and Reinvestment Act (ARRA) funding under Contract No. W9127N-08-D-0004, awarded to Thomas/Wright, Inc. for quality assurance inspections. The modification will add contract line item numbers (CLINs) 7007 in the amount of $14,055.36, 7008 in the amount of $9,152.00, 7013 in the amount of $10,919.04, 7014 in the amount of $2,729.76, 7022 in the amount of $4,380.00, and 7023 in the amount of $263.84 established specifically for work that falls under ARRA. This action will increase the task order by a total amount of $41,500.00.

Update #4 ·

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers issued a task order Modification 04 using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0005, awarded to Thomas/Wright, Inc., adding CLINs for work specifically funded under ARRA for quality assurance services. The amount of this modification is $18,000.00 for CLINs 7007, 7008, 7013, 7022, and 7023.

Update #3 ·

RECOVERY -- THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers intends to issue Modification 04 to Task Order 0005 using American Recovery and Reinvestment Act (ARRA) funding under Contract No. W9127N-08-D-0004, awarded to Thomas/Wright, Inc. for quality assurance inspections. The modification will add contract line item numbers (CLINs) 7007 in the amount of $12,138.72, 7008 in the amount of $2,496.00, 7013 in the amount of $1,364.88, 7022 in the amount of $1,500.00, and 7023 in the amount of $500.40 established specifically for work that falls under ARRA. This action will increase the task order by a total amount of $18,000.00.

Update #2 ·

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers issued a task order Modification 01 using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0011, awarded to Thomas/Wright, Inc., adding CLINs for work specifically funded under ARRA for quality assurance services. The amount of this modification is $114,000.00 for CLINs 7001, 7002, 7015, 7019, 7021, 7022, and 7024.

Update #1 ·

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT NO. W9127N-08-D-0004.

Portland District Corps of Engineers issued a task order Modification 01 using recovery act funding for Contract No. W9127N-08-D-0004, Task Order 0005, awarded to Thomas/Wright, Inc., adding CLINs for work specifically funded under ARRA for quality assurance services. The amount of this modification is $89,500.00 (includes mixed funds). Recovery amount is $85,622.48 for CLIN's 7007, 7008, 7013, 7014, 7022, and 7023. Non-Recovery amount is $3,877.52 for CLIN's 0004AA, 0004AB, and 0012.

Notice history

Notice Type Posted
RECOVERY--H--PROJECT NUMBER 323857, Quality Assurance Services for John Day Dam Latest Award Notice
This notice Award Notice
RECOVERY--H--Quality Assurance and Contract Administration Services Original Award Notice