Recovery: gmnf aquatic passage, FR17A culvert reconstruction green mountain & finger lakes national forest, weston, vermont
Award Notice Posted
- Solicitation number
- AG-4419-S-10-0443
- Agency
-
Operations Center East
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Gurney Brothers Construction, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-4419-C-10-0365 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Usda Forest Service Green Mountain National Forest Rutland, Vermont 05701, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
RECOVERY PROJECT DISCRIPTION: The intent of this project to replace the Green Mountain and Finger Lakes National Forest Aquatic Passage FR17A Culvert Reconstruction Project, in Weston, Vermont. The replacement of two existing metal pipes with a new bottomless arch on concrete abutments and association approach roadway work.
PROJECT LOCATION: This project is located over Jenny Coolidge Brook Manchester Ranger District, Weston Township, Windsor County, Vermont.
*PRICE RANGE IS FROM: $ 250,000 to $500,000*
*THIS PROCUREMENT IS HEREBY DETERMINED "UNRESTRICTED"*
THIS PROJECT IS FUNDED IN WHOLE BY THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA).
ALL VENDORS ARE REQUIRED TO BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR/ORCA) PRIOR TO AWARD OF A CONTRACT, HTTP://WWW.CCR.GOV/
NOTICE: FACSIMILE/EMAIL PROPOSALS ARE NOT ACCEPTABLE.
Update #2 ·
NOTE: THIS PRE-SOLICITATION REPLACES AG-4419-S-10-0387
RECOVERY PROJECT DISCRIPTION: The intent of this project to replace the Green Mountain and Finger Lakes National Forest Aquatic Passage FR17A Culvert Reconstruction Project, in Weston, Vermont. The replacement of two existing metal pipes with a new bottomless arch on concrete abutments and association approach roadway work.
PROJECT LOCATION: This project is located over Jenny Coolidge Brook Manchester Ranger District, Weston Township, Windsor County, Vermont.
*PRICE RANGE IS FROM: $ 250,000 to $500,000*
*THIS PROCUREMENT IS HEREBY DETERMINED "UNRESTRICTED"*
THIS PROJECT IS FUNDED IN WHOLE BY THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA).
ALL VENDORS ARE REQUIRED TO BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR/ORCA) PRIOR TO AWARD OF A CONTRACT, HTTP://WWW.CCR.GOV/
NOTICE: FACSIMILE/EMAIL PROPOSALS ARE NOT ACCEPTABLE.
Update #1 ·
NOTE: THIS PRE-SOLICITATION REPLACES AG-4419-S-10-0387
RECOVERY PROJECT DISCRIPTION: Green Mountain and Finger Lakes National Forest Aquatic Passage FR17A Culvert Reconstruction Project, in Rutland, Vermont. The replacement of two existing metal pipes with a new bottomless arch on concrete abutments and assoc. approach roadway work. This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structires, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.
THIS PROJECT IS FUNDED IN WHOLE BY THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA).
PROJECT LOCATION: This project is located Rutland, Vermont in Windsor County.
PRICE RANGE: The Government's estimate is between $250,000 and $500,000.
SET A-SIDE DETERMINATION WILL BE MADE AT TIME OF SOLICITATION POSTING.
ALL VENDORS ARE REQUIRED TO BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR) PRIOR TO AWARD OF A CONTRACT, HTTP://WWW.CCR.GOV/
Files
| File | Type | Posted |
|---|---|---|
| FSR 17A Soil Informaiton Report.pdf | ||
| SF 1442 Solicitation Cover Page.pdf | ||
| DBA Statewide.pdf | ||
| FR17A Culvert Reconst Drawings.pdf | ||
| FR17A Culvert Reconst Proj_Supplemental Specs.docx | DOCX document | |
| SF 1442 Cont _ 0443.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity