RECOVERY FUNDS: Repairs to Chambers Creek Site 75B

Award Notice Posted

Solicitation number
AG-7442-S-09-0028
Agency
Awarded
to Jay Mills Contracting Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG-7442-C-09-0032 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Site Showing is scheduled for June 11, 2009 at 10:00 am CST at Usda-Nrcs Service Center, 1822 FM 66, Suite 101. Waxahachie, Texas 75167, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Recovery Funded Project to Repair Chambers Creek Watershed Dam Site 75B.

Update #3 ·

CORRECTION TO RESPONSE DATE: June 29, 2009



USDA-Natural Resources Conservation Service is announcing a project under the American Recovery and Reinvestment Act. NRCS is contracting for repairs to the Chambers Creek Site 75A in Ellis County, Texas. The work includes the furnishing of all labor, transportation, materials, equipment and incidentals required to install lime-treatment on both the upstream and downstream slopes of the embankment, and repairing the wave berm. The major items of work consist of the following: preparing the access and campsites; removing fences from the work area; clearing and grubbing the work area; stripping and stockpiling the topsoil from the embankment and lime processing area; excavating the embankments slopes and wave berm; rebuilding the wave berm with earthfill; backfill the embankment slopes with lime treated earthfill; placing rock and topsoil and vegetate the disturbed areas. The lime will be added to and mixed with the earthfill material in a designated processing area.



It is anticipated that the solicitation will be posted o/a May 29, 2009.



Range is $1,000,000 to $5,000,000.



Site showing is scheduled for June 11, 2009 at 10:00 am CST at USDA-NRCS Sevice Center, 1822 FM 66, Suite 101, Waxahachie, TX.

Update #2 ·

USDA-Natural Resources Conservation Service is announcing a project under the American Recovery and Reinvestment Act. NRCS is contracting for repairs to the Chambers Creek Site 75A in Ellis County, Texas. The work includes the furnishing of all labor, transportation, materials, equipment and incidentals required to install lime-treatment on both the upstream and downstream slopes of the embankment, and repairing the wave berm. The major items of work consist of the following: preparing the access and campsites; removing fences from the work area; clearing and grubbing the work area; stripping and stockpiling the topsoil from the embankment and lime processing area; excavating the embankments slopes and wave berm; rebuilding the wave berm with earthfill; backfill the embankment slopes with lime treated earthfill; placing rock and topsoil and vegetate the disturbed areas. The lime will be added to and mixed with the earthfill material in a designated processing area.



It is anticipated that the solicitation will be posted o/a May 29, 2009.



Range is $1,000,000 to $5,000,000.



Site showing is scheduled for June 11, 2009 at 10:00 am CST at USDA-NRCS Sevice Center, 1822 FM 66, Suite 101, Waxahachie, TX.

Update #1 ·

USDA-Natural Resources Conservation Service is announcing a project under the American Recovery and Reinvestment Act. NRCS is contracting for repairs to the Chambers Creek Site 75A in Ellis County, Texas. The work includes the furnishing of all labor, transportation, materials, equipment and incidentals required to install lime-treatment on both the upstream and downstream slopes of the embankment, and repairing the wave berm. The major items of work consist of the following: preparing the access and campsites; removing fences from the work area; clearing and grubbing the work area; stripping and stockpiling the topsoil from the embankment and lime processing area; excavating the embankments slopes and wave berm; rebuilding the wave berm with earthfill; backfill the embankment slopes with lime treated earthfill; placing rock and topsoil and vegetate the disturbed areas. The lime will be added to and mixed with the earthfill material in a designated processing area.



It is anticipated that the solicitation will be posted o/a May 29, 2009.



Range is $1,000,000 to $5,000,000.



An amendment to this announcement will be posted once the site showing date/time/location is confirmed.

Files

Show all 27

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors