Recovery Funded Watershed Repairs to Trinity Watershed Sites Little Elm and Laterals sites 16 and 19, and Trinity Pilot Grove Site 28 (all in Colllin County), Texas

Award Notice Posted

Solicitation number
AG-7442-S-10-0007
Agency
Awarded
to Unity Contractor Services, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG-7442-C-10-0038 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Site Showing Information: Date: March 4, 2010 Time: 10:00 am CST Location: Texas Star Bank 320 South Preston Road (US 289) Celina, Texas 75009, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

RECOVERY FUNDED PROJECT: Lime treated earthfill to repair slope slides on Little Elm and Laterals Watershed Site 16.



Site 19 was canceled.

Update #4 ·

Recovery Funded:



CHANGES: Site showing is scheduled for March 4, 2010 at 10:00 am CST. Location is Texas Star Bank, 320 South Preston Road (US 289), Celina, Texas 75009.



Bids are due March 24, 2010 at 2:00 pm CST. DELETE: All references to Watershed Site Little Elm and Laterals Site 19 and Trinity Hickory Creek Site 13 (Denton County).



USDA-Natural Resources Conservation Service is announcing a project under the American Recovery and Reinvestment Act. The work includes repairs to ohe Watershed dam, Trinity Watershed Little Elm and Laterals Site 16, in Collin County, Texas. The designs for this site will address the repair of slope slides along the embankment by lime-treatment and will consist of: preparing the access and campsite; removing fences from the work area; clearing grubbing the work area; stripping and stockpiling the topsoil from the embankment and lime processing area; excavating the embankment slopes; backfilling the embankment slopes with lime-treated earthfill and earthfill (as appropriate); placing topsoil 1-foot thick normal to the slope over the lime treated earthfill; and vegetating the disturbed areas.



Range: $250,000 to $500,000



Update #3 ·

Recovery Funded:



CHANGES: Site showing is postponed to a later date TBD. Bids will be due 30 days after posting of the solicitation. DELETE: "Bids are now due on February 3, 2010 at 2pm".



Pilot Grove Site 28 solicitation is AG-7442-S-10-0027. See announcement on site showing information.



USDA-Natural Resources Conservation Service is announcing a project under the American Recovery and Reinvestment Act. The work includes repairs to three Watershed dams, Trinity Watershed Little Elm and Laterals Sites 16 and 19 and Pilot Grove Site 28 in Collin County, Texas. The designs for these sites will address the repair of slope slides along the embankment by lime-treatment and will consist of: preparing the access and campsite; removing fences from the work area; clearing grubbing the work area; stripping and stockpiling the topsoil from the embankment and lime processing area; excavating the embankment slopes; backfilling the embankment slopes with lime-treated earthfill and earthfill (as appropriate); placing topsoil 1-foot thick normal to the slope over the lime treated earthfill; and vegetating the disturbed areas.



Range: $1-5 Million



Solicitation to be posted o/a January 4, 2010.

Update #2 ·

Recovery Funded:



Changes: Site showing to be postpone to January 2010 and the Bids are now due on February 3, 2010 at 2pm. Pilot Grove Site 28 replaces Hickory Creek Site 13.



USDA-Natural Resources Conservation Service is announcing a project under the American Recovery and Reinvestment Act. The work includes repairs to three Watershed dams, Trinity Watershed Little Elm and Laterals Sites 16 and 19 and Pilot Grove Site 28 in Collin County, Texas. The designs for these sites will address the repair of slope slides along the embankment by lime-treatment and will consist of: preparing the access and campsite; removing fences from the work area; clearing grubbing the work area; stripping and stockpiling the topsoil from the embankment and lime processing area; excavating the embankment slopes; backfilling the embankment slopes with lime-treated earthfill and earthfill (as appropriate); placing topsoil 1-foot thick normal to the slope over the lime treated earthfill; and vegetating the disturbed areas.



Range: $1-5 Million



Solicitation to be posted o/a January 4, 2010.

Update #1 ·

Recovery Funded: USDA-Natural Resources Conservation Service is announcing a project under the American Recovery and Reinvestment Act. The work includes repairs to three Watershed dams, Trinity Watershed Little Elm and Laterals Sites 16 and 19 (Collin County) and Hickory Creek Watershed Site 13 (Denton County), Texas. The designs for these sites will address the repair of slope slides along the embankment by lime-treatment and will consist of: preparing the access and campsite; removing fences from the work area; clearing grubbing the work area; stripping and stockpiling the topsoil from the embankment and lime processing area; excavating the embankment slopes; backfilling the embankment slopes with lime-treated earthfill and earthfill (as appropriate); placing topsoil 1-foot thick normal to the slope over the lime treated earthfill; and vegetating the disturbed areas.



Range: $1-5 Million



Solicitation to be posted o/a December 2, 2009.

Files

File Type Posted
Long Abstract.contract.xlsx XLSX spreadsheet
Amendment 2.pdf PDF
Amendment 1.pdf PDF
AG-7442-S-10-0007.pdf PDF
TX36_dvb.htm HTM file
Little Elm Laterals 16-005.pdf PDF
LEL 16 Repair-SP.pdf PDF
Little Elm Laterals 16-003.pdf PDF
Little Elm Laterals 16-001.pdf PDF
Little Elm Laterals 16-004.pdf PDF
Signed SWPPP.pdf PDF
Little Elm Laterals 16-002.pdf PDF
16 LE Site Show.map directions.pdf PDF
Map to 4300 Community Ave.pdf PDF
Show all 14

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors