RECOVERY - FSPM042537 - Construct Lighting, Research Lab Gate and RECOVERY - FSPM044402 - Realign Road Research Lab Gate
Award Notice Posted
- Solicitation number
- FA930104D0025-FSPM042537-FSPM044402
- Agency
-
Air Force Test Center
Air Force Materiel Command, Department of Defense
- Awarded
- to ACE Engineering Inc.
- Set-aside
- Competitive 8(a)
Opportunity facts
- Contract number
- FA9301-04-D-0025-0458 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- 5 South Wolfe Avenue Edwards AFB, California 93524, United States
Notice details come from SAM.gov. Updated .
Notice text
RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE SIMPLIFIED ACQUISITION ENGINEER REQUIREMENTS (SABER) CONTRACT NUMBER FA9301-04-D-0025. Contractor: Ace Engineering, Inc. 1800 Wright Avenue, La Verne, CA 91750-5824. It is the Contracting Squadron's intent to award firm-fixed price task orders to the above contractor. Davis-Bacon wages presently in effect for California. CA070013 (Modification 13) dated 11/23/2007 and CA070031 (Modification 17) dated 11/23/2007 will prevail. These acquisitions are subject to the North American Industry Classification Code 236220 and the annual size standard is $28.5 million.
FSPM042537 - MC New Lighting, AFRL Gate
THE PROJECT DESCRIPTION IS AS FOLLOWS:
The work to be accomplished for 95 ABW/CEC. The work to be accomplished is the provision of area lighting approaching and through the AFRL Entry Control Facility (ECF) and the installation of a permanently-mounted emergency generator of sufficient capacity to power the area lighting and ECF building as outlined in UFC 04-022-01. Area lighting requirements are identified in UFC 04-022-01. Conduit shall be installed for future camera requirements.
FSPM044402 - MC Realign Road, AFRL Gate
THE PROJECT DESCRIPTION IS AS FOLLOWS:
The work to be accomplished for 95 ABW/CEC. The work to be accomplished is the realignment of the roads approaching and through the AFRL Entry Control Facility (ECF), construction of a parking lot and associated sidewalks. Work requires modifications to existing roadway structures; replacement, repositioning, installation of roadway signage and relocation of utilites.