RECOVERY - FSPM031527 - Repair HVAC Wastewater Treatment Plant

Award Notice Posted

Solicitation number
FA930106D0010-FSPM031527
Agency
Awarded
to Pojoaque Pueblo Service Corporation
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
FA9301-06-D-0010-0120 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
5 South Wolfe Avenue Edwards AFB, California 93524, United States

Notice details come from SAM.gov. Updated .

Notice text

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER BASE INFRASTRUCTURE CONTRACT (BIS) CONTRACT NUMBER FA9301-06-D-0010. Contractor: Pojoaque Pueblo Construction Service Cor. Rt 11 Box 8, Suite Const, Santa Fe, NM 87501. It is the Contracting Squadron's intent to award a firm-fixed price task order to the above contractor. Davis-Bacon wages presently in effect for California, CA030031 (Modification 26) dated 7/14/2006 and Service Contract Act 94-2045 (Rev. 28) dated 5/23/2006 will prevail. These acquisitions are subject to the North American Industry Classification Code 237990 and the annual size standard is $31.0 million.


FSPM031527 - Repair HVAC Wastewater Treatment Plant


THE PROJECT DESCRIPTION IS AS FOLLOWS:


The work to be accomplished at the Waste Water Treatment Plant Buildings 694, 698 and 699.  The work includes but is not limited to removal and replacement of the following HVAC components:


1. Building 694:  Evaporative cooler


2. Building 698:  Spark resistant exhaust fan


3. Building 699:  Spark resistant exhaust fan, (additive bid item) Spark resistant exhaust fan-plastic, (additive bid item) Spark resistant centrifugal exhaust blower, (additive bid item) Supply air fan


Except as noted, all removed items shall be disposed of off EAFB property at the contractor's expense.


Work shall be accomplished in an operating facility.  Shutdowns shall be minimized and shall be authorized by the Facility Manager or the designee.


All equipment shall be new unless otherwise noted.


Work shall be accomplished in compliance with the January 2009 EAFB Design Standards and applicable codes including the latest editions of the International Electrical, Plumbing and Mechanical Codes.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors