RECOVERY FSPM031348 - Repair HVAC Various Research Lab Facilities

Award Notice Posted

Solicitation number
FA930106D0010-FSPM031348
Agency
Awarded
to Pojoaque Pueblo Service Corporation
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
FA9301-06-D-0010-0122 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
5 South Wolfe Avenue Edwards AFB, California 93524, United States

Notice details come from SAM.gov. Updated .

Notice text

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER BASE INFRASTRUCTURE CONTRACT (BIS) CONTRACT NUMBER FA9301-06-D-0010. Contractor: Pojoaque Pueblo Construction Service Cor. Rt 11 Box 8, Suite Const, Santa Fe, NM 87501. It is the Contracting Squadron's intent to award a firm-fixed price task order to the above contractor. Davis-Bacon wages presently in effect for California, CA030031 (Modification 26) dated 7/14/2006 and Service Contract Act 94-2045 (Rev. 28) dated 5/23/2006 will prevail. These acquisitions are subject to the North American Industry Classification Code 237990 and the annual size standard is $31.0 million.


RECOVERY - Repair HVAC Various Research Lab Facilities - FSPM031348


THE PROJECT DESCRIPTION IS AS FOLLOWS:
The work to be accomplished at Edwards AFB is removal and replacement of 1 chiller and pump wth heat strip at 8765, condenser with coil at 4221. The intent of this project is to provide a complete functioning stand alone HVAC system (Turn- Key) in place of the existing system. Work shall be accomplished in compliance with the EAFB Design Standards and applicable codes including the latest editions of the International Electrical, Plumbing and Mechanical Codes.
The contractor shall accomplish the following:
Install (1) 50 ton chiller with heat strips in the air handler 8765, Install (2) chiller and CHW coil in the existing air handler at 4221, Digital thermostat with night time set back, Modify the electrical distribution as required by NEC and manufacturers recommendation for all new equipment. During the construction effort, contractor shall barricade work area to prevent hazardous conditions. During the construction effort, contractor shall keep area clean at all times and remove all waste and dispose of waste in an appropriate manner.


The contractor shall provide the follwing submittals to the COTR for review/approval prior to starting work:
Fctory authorized Start-up, check out, Work plan and sketches indicating proposed layout of new equipment, Proposed penetrations including flashing and sealing techniques, Product data and/or cut sheets on insulation, and Test results of the new HVAC system shall be provided befor completion of the project. Warranty shall be (1) year parts and labor.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors