RECOVERY - Construction Management (CM) Services for the Otay Mesa Land Port of Entry (LPOE) Modernization & Expansion

Award Notice Posted

Solicitation number
CA034755(CM)
Agency
Awarded
to Parsons Government Services Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
GS-09P-09-KS-D-0077(GS-P-09-09-KT-5024) Federal contract award
NAICS code
541611 Administrative Management and General Management Consulting Services
PSC
Not on record
Place of performance
San Diego, California San Diego, California, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

THIS AMENDMENT IS TO IDENTIFY WHICH CM FIRMS UNDER THE REGIONAL IDIQ CONTRACT IN ZONE 2 HAVE BEEN SELECTED BY GSA. They are listed below as follows (in no particular order):


APSI Construction Management
8885 Research Drive
Irvine, CA 92618


URS Corporation
600 Montgomery St., 26th Flr.
San Francisco, CA 94111


Abacus Project Management Inc.
3030 N. Central Ave., STE 1207
Phoenix, AZ 85012


Heery International
3573 E. Sunrise Dr. STE. 120
Tucson, AZ 85718


Parsons Infrastructure & Technology Group Inc.
100 West Walnut St
Pasadena, CA 91124


 


 

Update #2 ·

THIS AMENDMENT IS TO IDENTIFY WHICH CM FIRMS UNDER THE REGIONAL IDIQ CONTRACT IN ZONE 2 HAVE BEEN SELECTED BY GSA. They are listed below as follows (in no particular order):


APSI Construction Management
8885 Research Drive
Irvine, CA 92618


URS Corporation
600 Montgomery St., 26th Flr.
San Francisco, CA 94111


Abacus Project Management Inc.
3030 N. Central Ave., STE 1207
Phoenix, AZ 85012


Heery International
3573 E. Sunrise Dr. STE. 120
Tucson, AZ 85718


 

Update #1 ·

AGENCY: General Services Administration (GSA), Public Buildings Service (PBS), Design and Construction Division (9PC)


PROJECT: RECOVERY - Construction Management (CM) Services for the Otay Mesa Land Port of Entry (LPOE) Modernization & Expansion


Funded by the American Recovery and Reinvestment Act (ARRA) of 2009 (Public Law 11-5) (Recovery Act)


LOCATION: San Diego, California



This notice is provided for informational purposes only. This opportunity is available only to contractors who have received an awarded Region 9 GSA Indefinite Delivery Indefinite Quantity (IDIQ) contract in Zone 2 (Southern California) to provide CM services.


The General Services Administration (GSA), Public Buildings Service (PBS), Design and Construction Division (9PC) has a requirement to procure services from a highly qualified Construction Management (CM) firm to perform CM services throughout the design and construction of the Otay Mesa Land Port of Entry (LPOE) Expansion & Modernization Project in San Diego, California. It is important to note that this project is funded under the American Recovery and Reinvestment Act (ARRA) of 2009 (Public Law 11-5) (Recovery Act).


The Otay Mesa Land Port of Entry is located in San Diego, California. The port's last major renovation was in 1996 and since than this LPOE has experienced dramatic growth in traffic volumes. In 1996 it was estimated that nearly 4 million inspections were being conducted per year. Since then studies have shown that the number of these inspections has nearly doubled to 8 million per year with a current projections suggesting that Otay Mesa will experience an increased demand of roughly 18 million inspections per year by 2030. Population growth, increased law enforcement activities national security requirements, changes in trade policies, and outdated facilities and technology have combined to render this LPOE in dire need of expansion, upgrade, and modernization.


In order to assist GSA to ensure quality of work and success of the project, the CM firm will be required to conduct design and constructability reviews of the design documents and drawings developed by the Architect-Engineer(A/E) firm and Value Engineering workshops during the Design Phase of this project. The CM firm will also assist GSA in overseeing the day-to-day activities of the general contractor during the actual construction phase of the project, also known as the Management and Inspection Phase.


The CM work proposed includes but is not limited to the following:
• Conduct constructability reviews during design.
• Arrange and conduct Value Engineering and Partnering workshop sessions for the project team, at the appropriate times throughout the project development from the design to the completion of construction.
• Provide management expertise and direction in monitoring the performance of the construction contractor, the project schedule, ensuring that the requirements specified in the construction contract documents for this phase of the project are met, and coordinating the contractor's work with respect o the operations of the tenants in the building.
• Assist the GSA project team with administrative tasks, including documentation, record keeping, payment validation, review of contractor's certified payrolls, periodic labor interviews to ensure compliance with Davis-Bacon Wage rate, contractor's requests for information (RFIs), and submittal and change order processing for the construction contract.
• Provide technical expertise, in areas such as quality assurance, quality control, inspection, testing, and estimating.
• Inform GSA immediately of any project-related problems which are beyond the CM's ability to resolve.
• Design Phase Services: These services shall include, but not limited to, providing design technical reviews; code compliance reviews; constructability reviews utilizing Building Information Modeling (BIM); analysis of value engineering proposals; preparation of cost estimate; cost analysis; cost control/monitoring; site surveys; scheduling; review of design scope changes, etc.
• Project Procurement Phase Services: These services shall include, but not limited to, providing assistance in contract procurement; answering bid/RFP questions, attending/participating in site visits, pre-bid conferences preparing and issuing solicitation amendments for review and approval by the Government Contracting Officer, etc.
• Project Construction Phase Services: These services shall include, but not limited to, providing establishing temporary field offices; setting up job files, working folders, and record keeping systems scheduling and conducting preconstruction meetings; monitoring the submittal review process; maintaining marked up sets of project plans and specifications for future as-built drawings; performing routine inspections of construction as work proceeds, etc.
• Commissioning Services: These services shall include, but not limited to, providing professional and technical expertise for start-up, calibration, and /or certification of a facility or operating systems within a facility, etc.
• Testing/Inspection Services: The CM may be tasked to provide the services of an independent testing and/or inspection agency/laboratory to perform project specific quality control testing and inspection services, to include but not limited to, concrete, precast concrete connections, steel, steel decking, applied fireproofing, roofing, curtain walls/glazing, and elevator installations, etc.
• Post Construction Services: The CM may be tasked to provide services such as: Performing Post Occupancy Evaluation (POEs); assisting agency in the formulation of lessons learned; providing occupancy planning including development of move schedules, cost estimates, inventory lists, providing move coordination, relocation assistance, and/or furniture coordination; providing telecommunication and computer coordination, etc.
• Claims Services: The CM may be tasked to provide claims services when and as required by the Government for specific projects. The CM will review disputes and claims from the A&E and/or construction contractor(s) and render all assistance that the Government may require, including, but not limited to, the following: Furnishing reports with supporting information necessary to resolved disputes or defend against the claims; preparation and assembly of appeal files; participation in meetings or negotiations with claimants; appearance in legal proceedings; preparation of cost estimated for use in claims negotiations; preparation of risk assessments/analyses relative to claim exposure, etc.


A minimum of three (3) CM firms under the GSA Regional CM IDIQ contract for Zone 2 will be provided a fair opportunity to participate on the project in concurrence with Federal Acquisition Regulation (FAR) Part 16.505. The delivery order will be an initial award for tasks associated with constructability review with an owner exercisable option for construction administration. Ultimately the award will be made to the most highly qualified A/E firm that provides best value to the Government and with whom a mutually satisfactory delivery order can be negotiated.


If you have any questions or concerns regarding this informational posting please direct your questions to Christopher Lee via email at christopher.lee@gsa.gov.


 