RECOVERY C--Recovery - Upgrade Electrical Distribution & Generator Phase III Design at the Oscar G. Johnson VA Medical Center, Iron Mountain, MI

Award Notice Posted

Solicitation number
VA-69D-10-RA-0072
Agency
Awarded
to MEP Associates, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
VA69DRA1330 Federal contract award
NAICS code
541330 Engineering Services
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

Provide Professional Architectural Engineering Design services for the Upgrade Electrical Distribution & Generator Phase III, Project 585-09-112 at the Oscar G. Johnson VA Medical Center, Iron Mountain, Michigan. The A/E shall provide all necessary professional services to perform planning and design of the systems for the project. The A/E is responsible and liable for the professional design in accordance with the contract, good engineering practices, VA standards, VA project-specific requirements if any, and applicable codes. Profession engineer services to prepare the analysis, design, calculations, construction documents, specifications, cost estimates, construction period services, site visits, commissioning and as-built drawings are part of the scope of work. The A/E shall coordinate requirements with the local utility. The project will include the modifications to the electrical distribution system for the Life Safety, Equipment, and critical electrical panel load distribution serving critical care areas; the identification of cloth wiring within Building 1 and the design of new wire installation and runs; design new on site 13.8 kV generator set for back up of the two new 13.8 kV generators. Installation of additional conductors, switches, transfer switch, generator, and correction of code violations will be part of this project. The A/E will provide studies and cost analysis of potential options and make recommendations to the VA as part of the project. The A/E shall incorporate the sustainability goals outlined in the Federal Mandates with the appropriate LEED strategy and energy conservation guidelines in accordance with Energy Policy Act (EPACT 2005). Estimated construction cost is between 2,000,000 - 5,000,000. Area of consideration is restricted to 275 driving miles of the VA Medical Center at Iron Mountain, MI. Submit two (2) copies of SF 330 with appropriate documentation by close of business December 15, 2009. Mail information to: Great Lakes Acquisition Center, Attn: Jason Hinze, 5000 West National Avenue, Building 5, Milwaukee, Wisconsin 53295-0005. Selection criteria will be based on: (1) specialized experience and technical competence of the firm (including a joint venture or association) with the type of design required, (2) specific experience and qualifications of personnel proposed for assignment to the project, (3) Professional capacity of the firm in the designated geographic area of the project to perform work, (4) Past record of performance on contracts with the Department of Veterans Affairs, (5) Geographic location and facilities of the working office(s), (6) Demonstrated success in prescribing the use of recovered materials and achieving waste reduction and energy efficiency in facility design and (7) Construction cost control effectiveness. No bid packages are available. This is not a Request For Proposal (RFP). NAIC #541330 applies.

Notice history

Notice Type Posted
RECOVERY C--Recovery -- Upgrade Electrical Distribution & Generator Phase III Design Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors