This contract action was accomplished using other than competitive procedures because this is a task/delivery order where an exception to fair opportunity requirements was approved as this is a follow-on order to a competitive initial order (FAR 8.405-6(b)(2) or 16.505(b)(2)(iii).

BASE TASK ORDER: THE BASE TASK ORDER IS FOR 380 HOURS OF ENGINEERING DURING CONSTRUCTION (EDC) FOR CHILD DEVELOPMENT CENTER TINKER AFB (LINE ITEM 1) AT A PRE-NEGOTIATED HOURLY RATE TO ACCOMPLISH THE WORK OVER A TWELVE-MONTH PERIOD. IF ADDITIONAL CPS AND/OR EDC EFFORTS ARE REQUIRED ABOVE WHAT IS AWARDED WITHIN THE BASE TASK ORDER, A MODIFICATION TO THE TASK ORDER WILL BE ISSUED FOR THESE SERVICES.
OPTION 1: THE BASE TASK ORDER IS FOR 520 HOURS OF ENGINEERING DURING CONSTRUCTION (EDC) FOR 3001 HANGAR TINKER AFB (LINE ITEM 2) AT A PRE-NEGOTIATED HOURLY RATE TO ACCOMPLISH THE WORK OVER A TWELVE-MONTH PERIOD. IF ADDITIONAL CPS AND/OR EDC EFFORTS ARE REQUIRED ABOVE WHAT IS AWARDED WITHIN THE BASE TASK ORDER, A MODIFICATION TO THE TASK ORDER WILL BE ISSUED FOR THESE SERVICES.
OPTION 2:THE BASE TASK ORDER IS FOR 700 HOURS OF CONSTRUCTION PHASE SERVICE (CPS) (LINE ITEM 3) AT A PRE-NEGOTIATED HOURLY RATE TO ACCOMPLISH THE WORK OVER A TWELVE-MONTH PERIOD. IF ADDITIONAL CPS AND/OR EDC EFFORTS ARE REQUIRED ABOVE WHAT IS AWARDED WITHIN THE BASE TASK ORDER, A MODIFICATION TO THE TASK ORDER WILL BE ISSUED FOR THESE SERVICES.