RECOVERY--C--Project Number 322573 Arc Flash Hazard Assessment
Award Notice Posted
- Solicitation number
- W9127N-09-D-0004-0019
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Awarded
- to I N C A & Ch2M Hill Joint Venture
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W9127N-09-D-0004-0019 Federal contract award
- NAICS code
- 541330 Engineering Services
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
This contract action was accomplished using other than competitive procedures because this is a task/delivery order where an exception to fair opportunity requirements was approved as this is a follow-on order to a competitive initial order (FAR 8.405-6(b)(2) or 16.505(b)(2)(iii).
Portland District Corps of Engineers issued Task Order 0019 using recovery act funding to Contract number W9127N-09-D-0004, awarded to Inca/CH2M Hill, out of Englewood CO, DUNS Number 829843361. This Task Order is to provide arc flash analysis to protect personnel from the possibility of injury. The award amount using recovery act funding is $274,488.00
Update #1 ·
RECOVERY - PER FAR 5.7 THIS IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE TO ONLY TO CONTRACTORS UNDER THE CURRENT CONTRACT W9127N-09-D-0004.
The U.S. Army Corps of Engineers, Portland District, plans to issue Task Order 19 under Contract W9127N-09-D-0004 for flash hazard analysis as required under National Fire Protection (NFPA) 70E Standard for Electrical Safety in the Workplace (2009) in order to protect personnel from the possibility of being injured by an arc flash. The analysis will be based on the available fault current and the fault clearing time. This information will be used to determine the Flash Protection Boundary (FPB) and the Personal Protective Equipment (PPE) that people within the boundary shall use. Switchboards, panel boards, control panels, motor control centers and other industrial locations that are likely to require examination, adjustment, servicing, or maintenance while energized must be analyzed and field marked to warn qualified perrsons of potential electric arc flash hazards.
To comply with the NFPA safety standard, all exisitng electrical equipment (including supply, distribution, and load for AC system at all voltages and ratings) that has a potential to produce an arc flash hazard at up to eight Willamette Valley Projects must be assessed for arc flash hazards. This includes, but is not limited to, all the components within the powerhouse (if applicable), spillway, regulating outlet structures, main dam, warehouses, and fish facilities. The following five projects will be analyzed: Blue River Dam, Cottage Grove Dam, Dorena Dam, Fall Creek Dam, and Fern Ridge Dam. The following locations are optional: Cougar Dam, Foster Dam, and Green Peter Dam.