RECOVERY--C--PROJECT NUMBER 105469, Complete design of Oxbow Bypass so construction can occur
Award Notice Posted
- Solicitation number
- W91238-10-D-0012-0002
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Awarded
- to Mcmillen, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W91238-10-D-0012-0002 Federal contract award
- NAICS code
- 541310 Architectural Services
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): McMillen LLC, W91238-10-D-0012-0002, Complete design of Oxbow Bypass so construction can occur
Contract Award Amount equals $1,256,414.73 Recovery Funds, and $77,470.30 Non-Recovery Funds.
This task order was awarded to an existing contract for the current contractor to prepare a complete biddable, constructible, and operable final design for the Napa Dry Bypass segment of the Napa River/Napa Creek Flood Protection Project. This shall include final Plans and Specifications (35%, 65%, 95%, Final submittals) biddable for construction contract; a Design Documentation Report (DDR); cost estimate (35%, 65%, 95%, Final) using most recent version of Corps MCACES estimating format; Operation and Maintenance, Repair, Replacement and Rehabilitation (OMRR&R) Manual for the Dry Bypass reach; and Engineering Considerations and Instructions for Field Personnel (ECIFP) Report.
All questions should be directed to Contract Specialist Stacey Barksdale at Stacey.Barksdale@usace.army.mil or Contracting Officer Carolyn Mallory at Carolyn.E.Mallory@usace.army.mil
Contracting Office Address:
US Army Corps of Engineers
1325 J Street
Sacramento CA 95814-2922
Update #1 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): McMillen LLC, W91238-10-D-0012-0002, Complete design of Oxbow Bypass so construction can occur
This is a task order to an existing contract for the current contractor to prepare a complete biddable, constructible, and operable final design for the Napa Dry Bypass segment of the Napa River/Napa Creek Flood Protection Project. This shall include final Plans and Specifications (35%, 65%, 95%, Final submittals) biddable for construction contract; a Design Documentation Report (DDR); cost estimate (35%, 65%, 95%, Final) using most recent version of Corps MCACES estimating format; Operation and Maintenance, Repair, Replacement and Rehabilitation (OMRR&R) Manual for the Dry Bypass reach; and Engineering Considerations and Instructions for Field Personnel (ECIFP) Repor! t.