RECOVERY--, AJXF 08-1521, Extend Restroom Area into Locker/Shower in 89 OSS Bldg

Award Notice Posted

Solicitation number
AJXF-08-1521
Agency
Awarded
to 1Ci, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
FA4416-09-D-0005-0011 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Andrews AFB Andrews AFB, Maryland 20762, United States

Notice details come from SAM.gov. Updated .

Notice text

RECOVERY - THIS NOTICE IS PORVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE SABER INDEFINITE DELIVERY CONTRACT, FA4416-09-D-0005.


Furnish all supervision, plant labor, transportation, equipment, materials, and perform all operations necessary to remove one toilet and stall from the men's room and remove one toilet and stall from the women's room, relocate the handicap toilet and stall in each restroom to accommodate a new shower, and install one shower in the male restroom and one shower in the female restroom of building 1220 and to meet ADA compliance mandates. The dimensions of the restrooms and the location of new applicable showers in the restrooms must be designed and installed in accordance with all applicable ADA requirements. The floors and walls at the location of each shower installation must be tiled to match the remaining walls of each restroom. The relocated toilet shall be relocated and installed in compliance with ADA requirements where applicable. The rerouting of supply piping and drains to accommodate the new showers, rough-ins and piping of new drains are to provide proper drainage for the restrooms and must meet BOCA standards and requirements. New toilet partitions for the relocated handicap toilet must be installed for each restroom. Perform all operations necessary to tile the floor and walls at location of newly installed shower. Install a new exhaust ventilation system for each restroom and wire it to operate with the restroom light switches. Any possible asbestos containing material shall be tested prior to any demolition work. If the asbestos testing yields positive results, the proper abatement measures shall be addressed.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors