RECOVERY ACTION--C--Two-Phase Design-Build Gravel Road

Award Notice Posted

Solicitation number
DE-SOL-0001746
Agency
Awarded
to North Wind Services, LLC
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
DEEM0000927 Federal IDV award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Within 100 miles of Idaho Falls, ID. Idaho Falls, Idaho 83402, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

This is the Request for Proposal Number DE-SOL-0001746.

This Request for Proposal (RFP) is set-aside for certified 8(a) companies. It utilizes the Two-Phase Design Build Selection Procedures in accordance with FAR 36.301.

Phase 1 requires all interested offerors to submit the information as described in Section L of the RFP by no later than 5:00 pm MT, June 16, 2010, through FedConnect at www.fedconnect.net.

Questions regarding the RFP are to be provided no later than 12:00 pm MT (noon), June 9, 2010, by submitting through FedConnect at www.fedconnect.net.

From the Phase 1 proposal submittals, the Government will select no more than five (5) offerors to continue to Phase 2.  Those selected to continue to Phase 2 will be provided an opportunity to visit the site of construction as part of that Task Order 1 - Haul Road, in order that the selected offerors can propose on this work during the Phase 2 process.

Phase 2 is currently in draft form but is anticipated to be due July 8, 2010.  

The full RFP is available at FedConnect, www.fedconnect.net.

Update #4 ·

Amendment to Pre-solicitation Synopsis:

Additional Information: It is anticipated that one or more Indefinite-Delivery, Indefinite-Quantity award(s) will result from the Request for Proposal. Each award will be for a period of no more than five years in length. In addition to the controlled access road described in the previous pre-solicitation synopsis, removal of an asphalt section of road and maintenance of roads at the INL site will be included in the Scope of Work.


The estimated magnitude of total price for this entire project is changed from "$1,000,000-$5,000,000" to "More than $10,000,000."

Amendment to Pre-solicitation Synopsis:
Synopsis is amended to note that task orders placed against the resultant Indefinite-Delivery, Indefinite-Quantity award(s) may include Recovery Act funding.

Update #3 ·

Amendment to Pre-solicitation Synopsis:

Additional Information: It is anticipated that one or more Indefinite-Delivery, Indefinite-Quantity award(s) will result from the Request for Proposal. Each award will be for a period of no more than five years in length. In addition to the controlled access road described in the previous pre-solicitation synopsis, removal of an asphalt section of road and maintenance of roads at the INL site will be included in the Scope of Work.


The estimated magnitude of total price for this entire project is changed from "$1,000,000-$5,000,000" to "More than $10,000,000."

Update #2 ·

The U.S. Department of Energy has a requirement for a two-phase design-build at the Idaho National Laboratory located 40 miles west of Idaho Falls, Idaho. The project will include the design and construction of a controlled access road to be used for service and out-of-commerce shipments. It will not be used for individuals traveling between facilities. The road will be a gravel road for limited year-round use with the ability for trucks traveling in opposite directions to pass. The road is anticipated to be between 10 and 20 miles in length. A Request for Proposal (RFP) is expected to be issued by not later than May 28, 2010. The Request for Proposal will utilize the Two-Phase Design-Build Selection Procedures in accordance with FAR 36.301. The outcome will be a fixed-price award to the responsible offeror whose proposal offers the best value to the Government, price and technical factors considered. During Phase One, the offeror will be evaluated on the following evaluation factors: 1) Technical approach (but do not include any detailed design or technical information); the 2) Technical qualifications such as (a) specialized experience and technical competence; (b) capability to perform; and (c) past performance. From the Phase One proposal submittals, no more than five of the most highly qualified offerors will be selected to continue to Phase Two. The selected offerors will then be invited to a site visit of the anticipated location for the road. Phase Two proposals will require the submission of the technical proposal to include the detailed design and estimated schedule, as well as a fixed-price proposal. The price proposal for construction is expected to be on a per-mile basis. The estimated magnitude of total price for this entire project is anticipated to be between $1,000,000 and $5,000,000. This solicitation is 100% set-aside for 8(a) firms. Entities interested in this announcement are encouraged to register at FedConnect by going to www.fedconnect.net. Instruction are found in the Ready, Set, Go document located at the FedConnect home page.

Update #1 ·

The U.S. Department of Energy has a requirement for a two-phase design-build at the Idaho National Laboratory located 40 miles west of Idaho Falls, Idaho. The project will include the design and construction of a controlled access road to be used for service and out-of-commerce shipments. It will not be used for individuals traveling between facilities. The road will be a gravel road for limited year-round use with the ability for trucks traveling in opposite directions to pass. The road is anticipated to be between 10 and 20 miles in length.

A Request for Proposal (RFP) is expected to be issued by not later than May 28, 2010. The Request for Proposal will utilize the Two-Phase Design-Build Selection Procedures in accordance with FAR 36.301. The outcome will be a fixed-price award to the responsible offeror whose proposal offers the best value to the Government, price and technical factors considered. During Phase One, the offeror will be evaluated on the following evaluation factors: 1) Technical approach (but do not include any detailed design or technical information); the 2) Technical qualifications such as (a) specialized experience and technical competence; (b) capability to perform; and (c) past performance.

From the Phase One proposal submittals, no more than five of the most highly qualified offerors will be selected to continue to Phase Two. The selected offerors will then be invited to a site visit of the anticipated location for the road.

Phase Two proposals will require the submission of the technical proposal to include the detailed design and estimated schedule, as well as a fixed-price proposal. The price proposal for construction is expected to be on a per-mile basis. The estimated magnitude of total price for this entire project is anticipated to be between $1,000,000 and $5,000,000.

This solicitation is 100% set-aside for 8(a) firms.

Entities interested in this announcement are encouraged to register at FedConnect by going to www.fedconnect.net. Instruction are found in the Ready, Set, Go document located at the FedConnect home page.