RECOVERY--A--Project Number SI-0939, Distributed Power Systems for Sustainable Energy Resources
Award Notice Posted
- Solicitation number
- W912HQ-SI-0939
- Agency
-
Humphreys Engineer Center Support Activity
US Army Corps of Engineers, Department of Defense
- Awarded
- to RTX Corporation
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912HQ-09-C-0055 Federal contract award
- NAICS code
- 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
- PSC
- Not on record
- Place of performance
- Serdp Program Office 901 North Stuart Street, Suite 303 Arlington VA 22203 US
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
The award notice of Contract W912HQ-09-C-0055 is amended to add URL http://www.estcp.org/Technology/SI-0939-FS.cfm to a fact sheet giving a description of the project and the work being performed under this contract which falls under the Recovery Act.
Update #2 ·
This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2).
Project Number SI-0939 entitled Distributed Power Systems for Sustainable Energy Resources. This work falls within the topic areas of both Continuous Building Commissioning and Solid Waste Gasification. This funded amount of $1,390,003.00 falls within the topic of Continuous Building Commissioning and $627,000.00 falls within the topic of Solid Waste Gasification.
RATIONALE FOR CONTRACT AWARD THAT IS NOT FIXED-PRICE: This is a R&D type contract in support of the Environmental Security Technology Certification Program (ESTCP) issued against BAA-09-0003. Cost reimbursement contracts are suitable for use when uncertainties involved in contract performance do not permit cost to be estimated with sufficient accuracy to use any type of fixed price contract. The nature of development work often requires a cost-reimbursement arrangement. In addition, the contractor's accounting system has been deemed adequate for determining cost applicable to the contract and appropriate Government surveillance during performance will provide reasonable assurance that efficient methods and cost controls are used.
Update #1 ·
RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W912HQ-SI-0939.
THIS IS NOT A REQUEST FOR PROPOSALS. THIS IS FOR INFORMATION PURPOSES ONLY. Distributed Power Systems for Sustainable Energy Resources. This is for work previously solicited under BA-09-0003 dated 07 January 2009. Proposals have already been received and selections made. This is only a notice that this project will be funded using American Recovery and Reinvestment Act (ARRA) Funds.