RECOVERY--56--PROJECT NUMBER 8840, Harry S Truman Dam And Reservoir, MO The contractor shall furnish all labor, material and fasteners to construct a storage building at the Government designated location within the Harry S Truman (See Desc)

Award Notice Posted

Solicitation number
W912DQ-10-T-0114
Agency
Awarded
to Quality Structures Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912DQ-10-P-0215 Federal contract award
NAICS code
236210 Industrial Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

(Subject Continued) Maintenance Complex.

Overall size of building shall be 40W x 120L x (14H (from finish grade))with (3) three foot overhang on open side.(south)
Contractor shall provide all labor and material to construct a Forty (40) x Ninety (90) short wall, to be located on the west and north sides of the above building. The short wall shall be a minimum of sixteen (16) below the finish grade and shall extend twenty four (24) above the finish grade. The short wall will rest upon on a minimum twelve (12) wide by eight (8) deep footer.
Engineered trusses accommodate a Forty(40) foot free span
Material and Workmanship Warranty
26 gauge R-rib commercial grade metal Minimum 30 year warranty on paint and #1 steel only
Color of metal to be determined after contract award. (contractor to furnish choice of colors with quote)
South side of the building shall be open, with ten (10) , twelve (12) foot wide bays.
Foil Fiberglass Vinyl Roll insulation installed in the ceiling with an R value of 10.
Triangle style gable vent on the east and west end of storage building.
Metal attached with screws/washers
Snow Guards shall be installed on the roof.
Commercial grade Gutters and Down spouts installed with down spouts on each corner of the building or more frequent if needed to carry the run-off load.
The roof shall be a 4/12 pitch or greater depending on the engineering
Column Post, all ground contact lumber and bottom nailer, shall be treated lumber. Engineer Stamped Drawings shall be provided within 10 days after date of award.
Building shall be built to withstand wind and snow loads for central Missouri.
Minimum of 5 years of experience with a minimum of 3 previous job references.

Update #1 ·

The general scope of work consists of the following:

" The erection of (1) one post and metal building: 40x 120 x 14, to include two to three 12 x 12 garage style doors to be located on one long wall, with one or two enclosed storage areas

" Government provided level site

" Engineered Stamped Drawings Required

" Department of Labor Wage Rates will apply

" Contractor payment protection will be required

" The contractor will furnish all labor, equipment, materials, supplies, transportation, security and supervision necessary to satisfactorily accomplish the work in accordance with the Scope of Work (SOW) provided in the solicitation.

" The Contractor shall monitor performance and ensure compliance in accordance with the terms and conditions of the contract. The performance period will be from date of award through 30 September 2010.

COMPETE DETAILS OF THE ABOVE REQUIREMENT WILL BE PROVIDED IN THE FORTH COMING SOLICITATION