RECOVERY--46--PROJECT NUMBER 4990, Dry Creek (Warm Springs) Lake & Channel, CA Installation of a Water Filtration System at Dry Creek (Warm Springs) Lake & Channel, CA.
Award Notice Posted
- Solicitation number
- W912P7-09-R-0024
- Agency
-
ENDIST San Francisco
US Army Corps of Engineers, Department of Defense
- Awarded
- to B.c. Schmidt Construction, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912P7-10-C-0004-P00001 Federal contract award
- NAICS code
- 238990 All Other Specialty Trade Contractors
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): B C Schmidt Construction, Inc. Contract No W912P7-10-C-0004
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award.
Furnish the U.S. Army Corps of Engineers (COE)San Francisco District with labor, materials, equipment and supplies necessary to perform the following additional work items (modification to contract W912P7-10-C-0004) for WSD Liberty Glen Campground Water Treatment Plant Replacement:
1. Miscellaneous design work - $ 14,730.00.
2. Design and construct new control system since existing control system would not be compatible with new filtration system without costly modifications -$61,768.00
3. Replace undersized pumps, i.e. existing pumps would not provide high enough water pressures to properly operate new filtration system - $ 30,143.00.
4. Design and construct new chlorination system to satisfy current State of California Regional Water Quality Control Board requirements, i.e. required to secure permit from Regional Board to operate new water treatment plant - $ 122,917.00.
5. Process water permit application - $ 14,420.00.
6. Install pre-filtration system recommended to extend life of main filters, particularly during seasonal periods of high lake turbidity levels - $ 9.503.00
TOTAL FOR ALL WORK ITEMS IS $ 253,481.00.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| Recovery- Installation of a Water Filtration System at Dry Creek (Warm Springs) Lake & Channel, CA. Project #: 4990 | Award Notice |