Recovery - 3909001, install 81KV photovotaic power system
Award Notice Posted
- Solicitation number
- W91364-09-R-0048
- Agency
-
Ohio National Guard
Army National Guard, Department of Defense
- Awarded
- to The Rudolph / Libbe Companies Inc
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W91364-05-D-0014-0038 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Toledo Readiness Center 925 Research Drive Toledo, Ohio 43623, United States
Notice details come from SAM.gov. Updated .
Notice text
RECOVERY PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE FOLLOWING CURRENT OHIO NATIONAL GUARD MULTIPLE AWARD TASK ORDER CONTRACTS:
W91364-05-D-0001, Toltest INC
W91364-05-D-0002, Syska Hennessy Group, INC
W91364-05-D-0003, Hunsi Group, INC
W91364-05-D-0004, McDaniel's Construction Corp INC
W91364-05-D-0005, Smoot Construction Company of Ohio
W91364-05-D-0006, Rock Industries INC
W91364-05-D-0008, McTech Corp
W91364-05-D-0009, Four Seasons Environmental, Inc
W91364-05-D-0010, Sherrick/Woolpert, INC (Joint Venture)
W91364-05-D-0011, Northwind Engineering, LLC
W91364-05-D-0012, Q.B.S., INC
W91364-05-D-0013, Megen Construction Company, INC
W91364-05-D-0014, Rudolph/Libbe Companies INC
W91364-05-D-0015, LDV, INC
W91364-05-D-0016, Braun Enterprises, INC
W91364-05-D-0017, Brigadier Construction Services, LLC
W91364-05-D-0018, Veteran Construction Services, LLC
W91364-05-D-0020, Versar Inc
W91364-05-D-0021, Lusk Mechanical Contractors INC
W91364-05-D-0022, Henderson Contractors Corp
W91364-05-D-0023, Navarro Construction Company
Install in accordance with this statement of work a 81 KV maximum peak electrical production, Photovoltaic (PV) array electrical power production plant. Provide all permitting, site work and preparation, foundations, framing, PV solar panels, electric distribution system and or upgrades to the existing system, inverters and transformers and other required equipment etc., as needed and tie into the existing high voltage electric distribution system as required to provide a complete and useable system.