Reach H Levee Improvement Construction Project

Award Notice Posted

Solicitation number
W91238-17-R-0049
Agency
Awarded
to AECOM - Inquip JV
Set-aside
No set-aside

Opportunity facts

Contract number
W9123818C0005 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

10 versions

Update #10 · Latest ·

The purpose of this Amendment is to cancel Solicitation No.: W9123817R0049. The Agency's requirement for this project has changed and the aforementioned solicitation no longer reflects the Agency's needs. Therefore, it is in the Government's best interst to cancel this procurement.

Update #9 ·

***UPDATE 20 SEPTEMBER 2017***

To all concerned:

This solicitation was issued as a Request for Proposals under FAR Part 15 as opposed to an Invitation for Bid under FAR Part 14. Therefore, there is no "low bid" or "bidder" information to provide. Proposals/Offers (not bids) are currently under evaluation and the Government is not able to provide an estimated award date at this time.  However, once a source selection decision is made and a contract awarded, an award announcement will be posted on this site and will provide the information stated in FAR 15.503(b).

The Government will not be responding to inquiries about the results of this solicitation until an award announcement is made.


***UPDATE 24 AUGUST 2017***

Amendment No.: 01 is hereby issued. Please note the revised proposal due date. Also, for your convenience, a conformed copy of the solicitation (including changes made via Amendment 01) is provided. 

ProjNET will NOT re-open to address any questions arising from this Amendment. 

For all intents and purposes, changes to the solicitation captured in this Amendment should not pose a surprise if you have been following the Bidder Inquiry responses provided in ProjNET and the several updates to this announcement where information was provided in advance of this amendment.

***UPDATE 16 AUGUST 2017***

1) The Government is adding the "Sanchez" staging area and reducing the size of the Pumping Plant 8 staging areas.  The attached revised drawings are being provided as a courtesy at this time, and will formally be incorporated into the solicitation via a forthcoming amendment.

2) In response to Bidder Inquiry ID: 7105448, the Government will incorporate borrow site testing data into the amendment in an upcoming amendment to the solicitation. However, it is being provided now as a courtesy. 

The Government estimates issuing an amendment on or about 23 August 2017.

***UPDATE 9 AUGUST 2017***

1) Reference Bidder Inquiry ID No.: 7097986, The Geotechnical Data Report is referenced in the technical specifications. The report is being provided at this time for your convenience and will formally be incorporated into the solicitation in a forthcoming amendment. Please note that the GDR is merely backup information. The boring drawings in the Plans provide sufficient information upon which to base your proposal.

2) The sign-in roster from yesterday's site visit is posted for your informational purposes only.

***UPDATE 31 JULY 2017*** Solicitation No. W91238-17-R-0049 is hereby issued.

Natomas Basin Reach H Levee Improvement Construction Project


The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Natomas Basin Reach H Levee Improvement Construction Project.

Project Description: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road is also required. The methods determined to be technically acceptable to the constructability of Reach H include conventional long reach excavation or One Pass Trench (OPT) using soil-bentonite (SB) slurry in majority of the length. Three separate locations will require Slag-Cement Cement Bentonite (SCCB) wall using conventional method.

This acquisition is proceeding as an unrestricted, full and open competition.  However, the prime contractor will be required to self-perform the cutoff wall work.

In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25,000,000 and $100,000,000. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million.

The RFP is estimated to be issued on or about 31 JULY2017 with proposals due tentatively on 1 SEPTEMBER 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov) and will establish a firm proposal due date/time.

The site visit/pre-proposal conference date, time and location is identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

Update #8 ·

***UPDATE 24 AUGUST 2017***

Amendment No.: 01 is hereby issued. Please note the revised proposal due date. Also, for your convenience, a conformed copy of the solicitation (including changes made via Amendment 01) is provided. 

ProjNET will NOT re-open to address any questions arising from this Amendment. 

For all intents and purposes, changes to the solicitation captured in this Amendment should not pose a surprise if you have been following the Bidder Inquiry responses provided in ProjNET and the several updates to this announcement where information was provided in advance of this amendment.

***UPDATE 16 AUGUST 2017***

1) The Government is adding the "Sanchez" staging area and reducing the size of the Pumping Plant 8 staging areas.  The attached revised drawings are being provided as a courtesy at this time, and will formally be incorporated into the solicitation via a forthcoming amendment.

2) In response to Bidder Inquiry ID: 7105448, the Government will incorporate borrow site testing data into the amendment in an upcoming amendment to the solicitation. However, it is being provided now as a courtesy. 

The Government estimates issuing an amendment on or about 23 August 2017.

***UPDATE 9 AUGUST 2017***

1) Reference Bidder Inquiry ID No.: 7097986, The Geotechnical Data Report is referenced in the technical specifications. The report is being provided at this time for your convenience and will formally be incorporated into the solicitation in a forthcoming amendment. Please note that the GDR is merely backup information. The boring drawings in the Plans provide sufficient information upon which to base your proposal.

2) The sign-in roster from yesterday's site visit is posted for your informational purposes only.

***UPDATE 31 JULY 2017*** Solicitation No. W91238-17-R-0049 is hereby issued.

Natomas Basin Reach H Levee Improvement Construction Project


The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Natomas Basin Reach H Levee Improvement Construction Project.

Project Description: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road is also required. The methods determined to be technically acceptable to the constructability of Reach H include conventional long reach excavation or One Pass Trench (OPT) using soil-bentonite (SB) slurry in majority of the length. Three separate locations will require Slag-Cement Cement Bentonite (SCCB) wall using conventional method.

This acquisition is proceeding as an unrestricted, full and open competition.  However, the prime contractor will be required to self-perform the cutoff wall work.

In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25,000,000 and $100,000,000. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million.

The RFP is estimated to be issued on or about 31 JULY2017 with proposals due tentatively on 1 SEPTEMBER 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov) and will establish a firm proposal due date/time.

The site visit/pre-proposal conference date, time and location is identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

Update #7 ·

***UPDATE 16 AUGUST 2017***

1) The Government is adding the "Sanchez" staging area and reducing the size of the Pumping Plant 8 staging areas.  The attached revised drawings are being provided as a courtesy at this time, and will formally be incorporated into the solicitation via a forthcoming amendment.

2) In response to Bidder Inquiry ID: 7105448, the Government will incorporate borrow site testing data into the amendment in an upcoming amendment to the solicitation. However, it is being provided now as a courtesy. 

The Government estimates issuing an amendment on or about 23 August 2017.

***UPDATE 9 AUGUST 2017***

1) Reference Bidder Inquiry ID No.: 7097986, The Geotechnical Data Report is referenced in the technical specifications. The report is being provided at this time for your convenience and will formally be incorporated into the solicitation in a forthcoming amendment. Please note that the GDR is merely backup information. The boring drawings in the Plans provide sufficient information upon which to base your proposal.

2) The sign-in roster from yesterday's site visit is posted for your informational purposes only.

***UPDATE 31 JULY 2017*** Solicitation No. W91238-17-R-0049 is hereby issued.

Natomas Basin Reach H Levee Improvement Construction Project


The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Natomas Basin Reach H Levee Improvement Construction Project.

Project Description: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road is also required. The methods determined to be technically acceptable to the constructability of Reach H include conventional long reach excavation or One Pass Trench (OPT) using soil-bentonite (SB) slurry in majority of the length. Three separate locations will require Slag-Cement Cement Bentonite (SCCB) wall using conventional method.

This acquisition is proceeding as an unrestricted, full and open competition.  However, the prime contractor will be required to self-perform the cutoff wall work.

In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25,000,000 and $100,000,000. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million.

The RFP is estimated to be issued on or about 31 JULY2017 with proposals due tentatively on 1 SEPTEMBER 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov) and will establish a firm proposal due date/time.

The site visit/pre-proposal conference date, time and location is identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

Update #6 ·

***UPDATE 9 AUGUST 2017***

1) Reference Bidder Inquiry ID No.: 7097986, The Geotechnical Data Report is referenced in the technical specifications. The report is being provided at this time for your convenience and will formally be incorporated into the solicitation in a forthcoming amendment. Please note that the GDR is merely backup information. The boring drawings in the Plans provide sufficient information upon which to base your proposal.

2) The sign-in roster from yesterday's site visit is posted for your informational purposes only.

***UPDATE 31 JULY 2017*** Solicitation No. W91238-17-R-0049 is hereby issued.

Natomas Basin Reach H Levee Improvement Construction Project


The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Natomas Basin Reach H Levee Improvement Construction Project.

Project Description: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road is also required. The methods determined to be technically acceptable to the constructability of Reach H include conventional long reach excavation or One Pass Trench (OPT) using soil-bentonite (SB) slurry in majority of the length. Three separate locations will require Slag-Cement Cement Bentonite (SCCB) wall using conventional method.

This acquisition is proceeding as an unrestricted, full and open competition.  However, the prime contractor will be required to self-perform the cutoff wall work.

In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25,000,000 and $100,000,000. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million.

The RFP is estimated to be issued on or about 31 JULY2017 with proposals due tentatively on 1 SEPTEMBER 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov) and will establish a firm proposal due date/time.

The site visit/pre-proposal conference date, time and location is identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

Update #5 ·

***UPDATE 31 JULY 2017*** Solicitation No. W91238-17-R-0049 is hereby issued.

Natomas Basin Reach H Levee Improvement Construction Project


The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Natomas Basin Reach H Levee Improvement Construction Project.

Project Description: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road is also required. The methods determined to be technically acceptable to the constructability of Reach H include conventional long reach excavation or One Pass Trench (OPT) using soil-bentonite (SB) slurry in majority of the length. Three separate locations will require Slag-Cement Cement Bentonite (SCCB) wall using conventional method.

This acquisition is proceeding as an unrestricted, full and open competition.  However, the prime contractor will be required to self-perform the cutoff wall work.

In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25,000,000 and $100,000,000. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million.

The RFP is estimated to be issued on or about 31 JULY2017 with proposals due tentatively on 1 SEPTEMBER 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov) and will establish a firm proposal due date/time.

The site visit/pre-proposal conference date, time and location is identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

Update #4 ·

***UPDATE: 27 July 2017 - Please note the estimated RFP issuance and estimated proposal due date has changed as indicated below.***

PRE-SOLICITATION NOTICE

Natomas Basin Reach H Levee Improvement Construction Project


The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Natomas Basin Reach H Levee Improvement Construction Project.

Project Description: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road is also required. The methods determined to be technically acceptable to the constructability of Reach H include conventional long reach excavation or One Pass Trench (OPT) using soil-bentonite (SB) slurry in majority of the length. Three separate locations will require Slag-Cement Cement Bentonite (SCCB) wall using conventional method.

This acquisition is proceeding as an unrestricted, full and open competition.  However, the prime contractor will be required to self-perform the cutoff wall work.

In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25,000,000 and $100,000,000. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million.

The RFP is estimated to be issued on or about 1 AUGUST 2017 with proposals due tentatively on 1 SEPTEMBER 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov) and will establish a firm proposal due date/time.

The site visit/pre-proposal conference date, time and location will be identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

Update #3 ·

PRE-SOLICITATION NOTICE

Natomas Basin Reach H Levee Improvement Construction Project


The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Natomas Basin Reach H Levee Improvement Construction Project.

Project Description: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road is also required. The methods determined to be technically acceptable to the constructability of Reach H include conventional long reach excavation or One Pass Trench (OPT) using soil-bentonite (SB) slurry in majority of the length. Three separate locations will require Slag-Cement Cement Bentonite (SCCB) wall using conventional method.

This acquisition is proceeding as an unrestricted, full and open competition.  However, the prime contractor will be required to self-perform the cutoff wall work.

In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25,000,000 and $100,000,000. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million.

The RFP is estimated to be issued on or about 26 July 2017 with proposals due tentatively on 28 August 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov) and will establish a firm proposal due date/time.

The site visit/pre-proposal conference date, time and location will be identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

Update #2 ·

PRE-SOLICITATION NOTICE

Natomas Basin Reach H Levee Improvement Construction Project


The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Natomas Basin Reach H Levee Improvement Construction Project.

Project Description: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road. The methods determined to be technically acceptable to the constructability of Reach H include conventional long reach excavation or One Pass Trench (OPT) using soil-bentonite (SB) slurry in majority of the length. Three separate locations will require Slag-Cement Cement Bentonite (SCCB) using conventional or One Pass Trench (OPT) techniques.

This acquisition is proceeding as an unrestricted, full and open competition.  However, the prime contractor will be required to self-perform the cutoff wall work.

In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25,000,000 and $100,000,000. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million.

The RFP is estimated to be issued on or about 26 July 2017 with proposals due tentatively on 28 August 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov) and will establish a firm proposal due date/time.

The site visit/pre-proposal conference date, time and location will be identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

Update #1 ·

Natomas Basin Reach H Levee Improvement Construction Project

The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Natomas Basin Reach H Levee Improvement Construction Project.

Project Description: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road. The methods determined to be technically acceptable to the constructability of Reach H include conventional long reach excavation or One Pass Trench. Materials to be used include Slag-Cement Cement Bentonite (SCCB) at three required locations; and either Cement Bentonite (CB) or One Pass Trench (OPT) can be used at any other location indicated to have cutoff wall.

This acquisition is proceeding as an unrestricted, full and open competition.  However, the prime contractor will be required to self-perform the cutoff wall work.

In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25,000,000 and $100,000,000. This proposed contract action will be conducted using FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil Engineering Construction and the small business size standard is $36.5 million.

The RFP is estimated to be issued on or about 26 July 2017 with proposals due tentatively on 28 August 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov) and will establish a firm proposal due date/time.

The site visit/pre-proposal conference date, time and location will be identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub).

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

Files

Show all 19

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors