RDS
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- FA8504-19-R-0006
- Agency
-
AFLCMC Robins AFB
Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336411 Aircraft Manufacturing
- PSC
- Not on record
- Place of performance
- Robins Air Force Base, GA Warner Robins, Georgia 31098, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The Contractor shall design, engineer, develop, manufacture, and install a minimum 4000 gallon Retardant Delivery System (RDS) tank with a net max dry weight of 5,000 lbs. for all fixed and removable components to include restraints with a maximum total system weight of 41,000 lbs. (which includes the fluid at a weight of 9 lbs/gal, dry weight of the tank and all additional structure) for seven (7) HC-130H aircraft. There shall be a basic contract with one (1) trial kit/install, one (1) verification kit/install and five (5) production kits/installs.
The required effort includes, but is not limited to; RDS development, manufacture and installation, structural modifications and maintenance and inspection plans. The Government requires an internally mounted gravity, constant flow RDS.
The Contractor shall be responsible for the conversion, maintenance and return of the aircraft to an airworthy condition at final delivery. The conversion and modification shall occur at the Contractor's facility. Period-of-Performance: Assuming timely execution of all options, the Contractor shall be required to design, engineer, develop, manufacture, install and test an RDS for all seven (7) HC-130H aircraft within 27 months of contract award.
The successful offeror will be chosen using the Technically Acceptable Risk (TAR) source selection procedure.
Based on market research, the Government is not using the policies contained in FAR Part 12, Acquisition of Commercial Items, in its solicitation for the described supplies or services.
A Draft Statement of Work is attached to this pre-solicitation notice. The estimated release date is 29 Mar 19 with a required response date of 45 days after issuance. Any concerns related to the Draft Statement of Work and/or desires to obtain a copy of the RFP must be submitted to victor.conner.1@us.af.mil. No telephonic requests.
.
Update #1 ·
The Contractor shall design, engineer, develop, manufacture, and install a minimum 4000 gallon Retardant Delivery System (RDS) tank with a net max dry weight of 5,000 lbs. for all fixed and removable components to include restraints with a maximum total system weight of 41,000 lbs. (which includes the fluid at a weight of 9 lbs/gal, dry weight of the tank and all additional structure) for seven (7) HC-130H aircraft. There shall be a basic contract with one (1) trial kit/install, one (1) verification kit/install and five (5) production kits/installs.
The required effort includes, but is not limited to; RDS development, manufacture and installation, structural modifications and maintenance and inspection plans. The Government requires an internally mounted gravity, constant flow RDS.
The Contractor shall be responsible for the conversion, maintenance and return of the aircraft to an airworthy condition at final delivery. The conversion and modification shall occur at the Contractor's facility. Period-of-Performance: Assuming timely execution of all options, the Contractor shall be required to design, engineer, develop, manufacture, install and test an RDS for all seven (7) HC-130H aircraft within 27 months of contract award.
The successful offeror will be chosen using the Technically Acceptable Risk (TAR) source selection procedure.
Based on market research, the Government is not using the policies contained in FAR Part 12, Acquisition of Commercial Items, in its solicitation for the described supplies or services.
A Draft Statement of Work is attached to this pre-solicitation notice. The estimated release date is 6 Mar 19 with a required response date of 45 days after issuance. Any concerns related to the Draft Statement of Work and/or desires to obtain a copy of the RFP must be submitted to victor.conner.1@us.af.mil. No telephonic requests.
.
Files
| File | Type | Posted |
|---|---|---|
| Synopsis_Q&A_1.pdf | ||
| DRAFT_RDS_SOW_Basic_Cal_fire.docx.pdf | ||
| DRAFT_Appendix_E_SOW.xlsx | XLSX spreadsheet | |
| DRAFT_Appendix_F_BELLY_ANTENNAS.pptx | PPTX presentation | |
| DRAFT_RDS_SOW_Final_2_Mar_17.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| HC-130H retardant delivery system (RDS) | Solicitation | |
| This notice | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity