Raven Trail Reconstruction

Awarded Award Notice Posted

Solicitation number
AG-0112-S-15-0021
Agency
Region 10 - Alaska Region Forest Service, Department of Agriculture
Awarded
to Korpela Construction
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-0112-C-15-0006 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
The project site is located in Petersburg, Alaska. The beginning of the project is located at 5648'16.34" N 13255'26.00" along a utility road locally known as the water tank road. Petersburg is located on Mitkof Island, and is accessible by scheduled airline service, boat, barge, and the Alaska Marine Highway system. Petersburg, Alaska 99833, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Added: May 21, 2015 5:05 pm Question 3: Will you allow a track loader pushing a small dump trailer for aggregate delivery if each is less than 10,000 lbs GVW?

Answer 3. The answer is no. The combined weight along with maneuverability issues on a narrow trail with tight curves would make operating two vehicles in this manner impacting.

Update #4 ·

Added: May 12, 2015 7:19 pm Questions and Answers
No information given on this document amends the solicitation.

Question 1: The drawings call for geotextile fabric under the aggregate, while the instructions call for geotextile fabric along with other methods of floating the trail as needed. My question is, does the USFS have a spec on the acceptable geotextile fabric to be used?
Answer 1. Geotextile to meet the requirements of FP-03, Section 714, Type II C.


Question 2: The large rock designated for the rest areas is heavier than a vehicle under 10,000 GVW can move or place.
Answer 2. Two boulders may be substituted for the single large boulder on the Rest Area if the two boulders are selected and placed to fit together and to provide similar size, function, and appearance as the originally specified single boulder


 

Update #3 ·

Added: Apr 30, 2015 7:01 pm Solicitation is posted.

Update #2 ·

Added: Apr 28, 2015 3:25 pm A hosted site visit will be held at the job site on May 5, 2015 from 3 PM to 4 PM. We will meet at parking lot adjacent to the trail head.

Update #1 ·

Added: Apr 01, 2015 7:57 pm This contract is for the construction of approximately 3,470' of aggregate trail and related items. The trail is primarily composed of a 6.5' to 8' wide graded surface of crushed rock, rest areas with benches, culverts, and signposts. There is one fish passage culvert, which has a timing window restriction of July 15 to September 15.There are two option items: removal of old trail planking, and construction of 2 rest areas.

SOLICITATION DETAILS.
The following preliminary details are provided for the benefit of prospective bidders, but are subject to change in the actual solicitation.
Estimated price range: between $100,000 and $250,000.
Contract type: firm-fixed-price.
Period of performance: 365 Days.
Solicitation type: Request for Proposal.
Bid opening date: 30 days after solicitation issuance.
Contract award date: within 60 days after bid opening.
Required bonds: bid bond with the bid and performance and payment bonds after award of a contract.


Do not ask questions until after the solicitation is posted.

Attachments

Files attached to this notice, newest first
File Type Posted
S150021Amd1.pdf PDF
raven1Bmap.docx DOCX document
AG-0112-S-15-0021RavenTrlReconst.pdf PDF
raven_trail_1B_dwgs_Mar12.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity