Raven rock mountain complex (rrmc) $100M SATOC

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
W912DR-22-R-0009
Agency
ENDIST Baltimore US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1AZ Construction Of Other Administrative Facilities And Service Buildings
Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Baltimore District is soliciting proposals for a single award task order contract to provide design-build construction services at the Raven Rock Mountain Complex in Maryland and Pennsylvania. The contract has a maximum value of $100 million to be awarded over a five year ordering period for new construction, renovations, repairs, hazardous material abatement, and upgrades to facilities, utilities, security systems and infrastructure. Proposals are due February 24, 2022 and will be evaluated on technical approach, past performance, and price. The successful offeror must have an active secret facility clearance and all personnel must be U.S. citizens eligible for site access badges.

There is no set-aside designation. The primary NAICS code is 237990 and PSC code is S206. Work will be performed at remote, mountainous secure locations in Maryland and Pennsylvania over five years and include projects such as new maintenance facilities, utilities upgrades, and security infrastructure with task order values up to $42 million. The current incumbent is unspecified. Work may be performed both in secure areas and non-secure areas and involve difficult terrain including underground construction.

Notice text

4 versions

Update #4 · Latest ·

***15 February 2022 - Amendment 0003 revises Section 00 21 16 and the submission date. All other terms and conditions will remain the same.

***11 February 2022 - Amendment 0002 revises section, 00 21 16.  All other terms and conditions will remain the same.

***9 February 2022 - Amendment 0001 revises sections 00 20 00, 00 21 16 and 00 72 00 along with the submission date. All other terms and conditions will remain the same.

The U.S. Army Corps of Engineers (USACE), Baltimore District, intends to issue a contract for a Design-Build Construction Services Single Award Task Order Contract (SATOC) for work to be performed at the Raven Rock Mountain Complex (RRMC).

This procurement will utilize the Two-Phase Design- Build Selection Procedures in accordance with FAR 36.3. The SATOC will have a total contract capacity of $100,000,000 and an ordering period of five (5) years. Task Orders will be firm fixed price, and either Design-Build or Design-Bid-Build.

Project Description: The scope of this contract will encompass a broad variety of major and minor repair, modifications, renovations, rehabilitation, alterations, Design-Build, Design-Bid-Build and new construction projects in a Secure Environment to include working in Sensitive Compartmented Information Facilities (SCIF) in support of the Washington Headquarters Service and the RRMC. The salient characteristics of these projects include: new facility design and construction, site clearing, structures and utilities/fence installations, fuel distribution and storage systems, asbestos/lead abatement/ renovation, heating ventilating and air conditioning (HVAC) upgrades and repairs; electrical upgrades and repairs; direct digital control & network upgrades and repairs; IT Comms and Security system infrastructure, security doors & windows; structural strengthening; interior fit-ups, which may include furniture procurement and installation. Work typically involves hazardous material abatement, requiring a certified industrial hygienist, quality control, material removal, and disposal. Work may also include geo technical investigation; exterior upgrades and repairs; utilities; hydrant; traffic & streetlight; security barricades; roadwork; and other force protection (AT/FP) or access control point type projects associated with existing secure campus buildings and grounds. 


The geographic area where work will be completed under this SATOC will be in Maryland and Pennsylvania. These locations are in remote mountainous areas and access can be difficult.  The sites have a very rocky terrain, frequently with steep slopes.  Some project locations will be underground.  As indicated above, the locations are in two separate states with differing Authorities Having Jurisdictions (AHJ) for various permitting and approval functions.  Winter weather can be extreme and very unpredictable. Work performed may be either in secure or non-secure sites. 


All Offerors will be required to possess a Secret Facility Site Clearance at the time of . The Contractor shall be required to perform all work in accordance with the access and security requirements of the facility. All personnel working on this project must be U.S. citizens. Details of the security requirements will be provided with the draft DD254 Construction Security Specifications for use during the seed project(s) proposal preparation. A final DD254 will be issued to the successful contractor upon award of the seed project(s). All succeeding task orders will have a project specific DD254 issued for each task order. 


WHS/RRMC requires all contract personnel to be US citizens, apply for and obtain an access badge from their department before work. The badge process includes enrolling into the Department of Homeland Security, E Verify system, providing copies of background search consent forms, E Verify, and photo identification. After authorization the contract personnel are fingerprinted and issued an access badge good for 2-years. 

Update #3 ·

***11 February 2022 - Amendment 0002 revises section, 00 21 16.  All other terms and conditions will remain the same.

***9 February 2022 - Amendment 0001 revises sections 00 20 00, 00 21 16 and 00 72 00 along with the submission date. All other terms and conditions will remain the same.

The U.S. Army Corps of Engineers (USACE), Baltimore District, intends to issue a contract for a Design-Build Construction Services Single Award Task Order Contract (SATOC) for work to be performed at the Raven Rock Mountain Complex (RRMC).

This procurement will utilize the Two-Phase Design- Build Selection Procedures in accordance with FAR 36.3. The SATOC will have a total contract capacity of $100,000,000 and an ordering period of five (5) years. Task Orders will be firm fixed price, and either Design-Build or Design-Bid-Build.

Project Description: The scope of this contract will encompass a broad variety of major and minor repair, modifications, renovations, rehabilitation, alterations, Design-Build, Design-Bid-Build and new construction projects in a Secure Environment to include working in Sensitive Compartmented Information Facilities (SCIF) in support of the Washington Headquarters Service and the RRMC. The salient characteristics of these projects include: new facility design and construction, site clearing, structures and utilities/fence installations, fuel distribution and storage systems, asbestos/lead abatement/ renovation, heating ventilating and air conditioning (HVAC) upgrades and repairs; electrical upgrades and repairs; direct digital control & network upgrades and repairs; IT Comms and Security system infrastructure, security doors & windows; structural strengthening; interior fit-ups, which may include furniture procurement and installation. Work typically involves hazardous material abatement, requiring a certified industrial hygienist, quality control, material removal, and disposal. Work may also include geo technical investigation; exterior upgrades and repairs; utilities; hydrant; traffic & streetlight; security barricades; roadwork; and other force protection (AT/FP) or access control point type projects associated with existing secure campus buildings and grounds. 


The geographic area where work will be completed under this SATOC will be in Maryland and Pennsylvania. These locations are in remote mountainous areas and access can be difficult.  The sites have a very rocky terrain, frequently with steep slopes.  Some project locations will be underground.  As indicated above, the locations are in two separate states with differing Authorities Having Jurisdictions (AHJ) for various permitting and approval functions.  Winter weather can be extreme and very unpredictable. Work performed may be either in secure or non-secure sites. 


All Offerors will be required to possess a Secret Facility Site Clearance at the time of . The Contractor shall be required to perform all work in accordance with the access and security requirements of the facility. All personnel working on this project must be U.S. citizens. Details of the security requirements will be provided with the draft DD254 Construction Security Specifications for use during the seed project(s) proposal preparation. A final DD254 will be issued to the successful contractor upon award of the seed project(s). All succeeding task orders will have a project specific DD254 issued for each task order. 


WHS/RRMC requires all contract personnel to be US citizens, apply for and obtain an access badge from their department before work. The badge process includes enrolling into the Department of Homeland Security, E Verify system, providing copies of background search consent forms, E Verify, and photo identification. After authorization the contract personnel are fingerprinted and issued an access badge good for 2-years. 

Update #2 ·

***9 February 2022 - Amendment 0001 revises sections 00 20 00, 00 21 16 and 00 72 00 along with the submission date. All other terms and conditions will remain the same.

The U.S. Army Corps of Engineers (USACE), Baltimore District, intends to issue a contract for a Design-Build Construction Services Single Award Task Order Contract (SATOC) for work to be performed at the Raven Rock Mountain Complex (RRMC).

This procurement will utilize the Two-Phase Design- Build Selection Procedures in accordance with FAR 36.3. The SATOC will have a total contract capacity of $100,000,000 and an ordering period of five (5) years. Task Orders will be firm fixed price, and either Design-Build or Design-Bid-Build.

Project Description: The scope of this contract will encompass a broad variety of major and minor repair, modifications, renovations, rehabilitation, alterations, Design-Build, Design-Bid-Build and new construction projects in a Secure Environment to include working in Sensitive Compartmented Information Facilities (SCIF) in support of the Washington Headquarters Service and the RRMC. The salient characteristics of these projects include: new facility design and construction, site clearing, structures and utilities/fence installations, fuel distribution and storage systems, asbestos/lead abatement/ renovation, heating ventilating and air conditioning (HVAC) upgrades and repairs; electrical upgrades and repairs; direct digital control & network upgrades and repairs; IT Comms and Security system infrastructure, security doors & windows; structural strengthening; interior fit-ups, which may include furniture procurement and installation. Work typically involves hazardous material abatement, requiring a certified industrial hygienist, quality control, material removal, and disposal. Work may also include geo technical investigation; exterior upgrades and repairs; utilities; hydrant; traffic & streetlight; security barricades; roadwork; and other force protection (AT/FP) or access control point type projects associated with existing secure campus buildings and grounds. 


The geographic area where work will be completed under this SATOC will be in Maryland and Pennsylvania. These locations are in remote mountainous areas and access can be difficult.  The sites have a very rocky terrain, frequently with steep slopes.  Some project locations will be underground.  As indicated above, the locations are in two separate states with differing Authorities Having Jurisdictions (AHJ) for various permitting and approval functions.  Winter weather can be extreme and very unpredictable. Work performed may be either in secure or non-secure sites. 


All Offerors will be required to possess a Secret Facility Site Clearance at the time of . The Contractor shall be required to perform all work in accordance with the access and security requirements of the facility. All personnel working on this project must be U.S. citizens. Details of the security requirements will be provided with the draft DD254 Construction Security Specifications for use during the seed project(s) proposal preparation. A final DD254 will be issued to the successful contractor upon award of the seed project(s). All succeeding task orders will have a project specific DD254 issued for each task order. 


WHS/RRMC requires all contract personnel to be US citizens, apply for and obtain an access badge from their department before work. The badge process includes enrolling into the Department of Homeland Security, E Verify system, providing copies of background search consent forms, E Verify, and photo identification. After authorization the contract personnel are fingerprinted and issued an access badge good for 2-years. 

Update #1 ·

The U.S. Army Corps of Engineers (USACE), Baltimore District, intends to issue a contract for a Design-Build Construction Services Single Award Task Order Contract (SATOC) for work to be performed at the Raven Rock Mountain Complex (RRMC).

This procurement will utilize the Two-Phase Design- Build Selection Procedures in accordance with FAR 36.3. The SATOC will have a total contract capacity of $100,000,000 and an ordering period of five (5) years. Task Orders will be firm fixed price, and either Design-Build or Design-Bid-Build.

Project Description: The scope of this contract will encompass a broad variety of major and minor repair, modifications, renovations, rehabilitation, alterations, Design-Build, Design-Bid-Build and new construction projects in a Secure Environment to include working in Sensitive Compartmented Information Facilities (SCIF) in support of the Washington Headquarters Service and the RRMC. The salient characteristics of these projects include: new facility design and construction, site clearing, structures and utilities/fence installations, fuel distribution and storage systems, asbestos/lead abatement/ renovation, heating ventilating and air conditioning (HVAC) upgrades and repairs; electrical upgrades and repairs; direct digital control & network upgrades and repairs; IT Comms and Security system infrastructure, security doors & windows; structural strengthening; interior fit-ups, which may include furniture procurement and installation. Work typically involves hazardous material abatement, requiring a certified industrial hygienist, quality control, material removal, and disposal. Work may also include geo technical investigation; exterior upgrades and repairs; utilities; hydrant; traffic & streetlight; security barricades; roadwork; and other force protection (AT/FP) or access control point type projects associated with existing secure campus buildings and grounds. 


The geographic area where work will be completed under this SATOC will be in Maryland and Pennsylvania. These locations are in remote mountainous areas and access can be difficult.  The sites have a very rocky terrain, frequently with steep slopes.  Some project locations will be underground.  As indicated above, the locations are in two separate states with differing Authorities Having Jurisdictions (AHJ) for various permitting and approval functions.  Winter weather can be extreme and very unpredictable. Work performed may be either in secure or non-secure sites. 


All Offerors will be required to possess a Secret Facility Site Clearance at the time of . The Contractor shall be required to perform all work in accordance with the access and security requirements of the facility. All personnel working on this project must be U.S. citizens. Details of the security requirements will be provided with the draft DD254 Construction Security Specifications for use during the seed project(s) proposal preparation. A final DD254 will be issued to the successful contractor upon award of the seed project(s). All succeeding task orders will have a project specific DD254 issued for each task order. 


WHS/RRMC requires all contract personnel to be US citizens, apply for and obtain an access badge from their department before work. The badge process includes enrolling into the Department of Homeland Security, E Verify system, providing copies of background search consent forms, E Verify, and photo identification. After authorization the contract personnel are fingerprinted and issued an access badge good for 2-years. 

Attachments

Files attached to this notice, newest first
File Type Posted
AM0003 W912DR22R0009 - RRMC SATOC.pdf PDF
W912DR22R0009 AMENDMENT 0002_11FEB2022.pdf PDF
Attachment A. SOA - AM0001.pdf PDF
AM0001 W912DR-22-R-0009 Final RFP.pdf PDF
Attachment C - Certificate of Corporate Authority Form.pdf PDF
Statement of Affiliation.docx DOCX document
SF LLL.pdf PDF
W912DR22R0009 SOLICITATION RRMC CONSTRUCTION SATOC_21JAN2022.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
W912DR22D0007 raven rock mountain complex (rrmc) $115M SATOC Latest Limited / Sole Source Justification
Notice of Intent for Raven Rock Mountain Complex SATOC Capacity Increase Latest special notice Special Notice
W912DR22D0007 raven rock mountain complex (rrmc) $100M SATOC Award Award Notice
Raven rock mountain complex (rrmc) $100M SATOC This notice Solicitation
Raven rock mountain complex (rrmc) $100M SATOC Pre-Solicitation
Project labor agreement (PLA) market survey: raven rock mountain complex Special Notice
Sources Sought - RRMC Construction Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity