Rapid Expeditionary Fuel Reclamation
Closed Solicitation Posted
- Solicitation number
- AF161-001
- Agency
-
Air Force Civil Engineer Center
Air Force Installation and Mission Support Center, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
Notice text
DoD SBIR topic AF161-001
Component: USAF
Command: AFCEC
Phase: SBIR Program Phase I Action
Technology Areas: Materials
Keywords: JP-8; fuel recovery; reclamation; kerosene
Objective:
Develop an expeditionary-capable system to perform rapid reclamation of fuel spilled from storage containment due to accident or damage to a condition suitable for immediate reuse.
Description:
The Air Force employs enormous quantities of hydrocarbon fuels (JP-8 being the primary concern) in storage systems around the world. Large amounts of fuels can potentially be lost due to tank puncture or destruction. Fuel spilled during tank failure is usually captured in fuel tank containment berms, where it acquires contaminants during exposure to the elements or fire-fighting activities. Three types of contaminants are of primary concern, at a total concentration of 2 percent or less: water from rain or run-off; particulate matter, such as dirt, grime, mold, etc., which may be chemically reactive with JP8; and fire suppressants—particularly aqueous film-forming foams (AFFFs), which may produce foam/fuel emulsions or chemically alter fuels. The Air Force seeks solutions that will rapidly decontaminate fuels, on site, producing fuel that can be placed back into the dispensing system via fuel truck or pumped directly to storage to be immediately used. This system will separate the contaminants from the spilled fuel and pump the contaminated refuse into a separate system or holding area. The system will continuously or iteratively monitor the quality of the fuel during the reclamation process(es).
The most difficult challenge is expected to be emulsions; minimizing the time to solve the issue of contaminated emulsions is an objective of the system. The following are specific minimum requirements for the final system: 1) can be towed by a small truck or similar vehicle; 2) setup time less than one hour; 3) redundant elements susceptible to consumption or occlusion, so process flow can be maintained during replacement; 4) in-situ monitoring and verification that recovered fuel is usable; 5) automated alarm and/or shutdown when operating conditions exceed design safety specifications, or other faults occur; 6) separate paths and storage capacity for recovered fuel and treatment residues; 7) 10,000-gal/hr throughput after breaking emulsions; 8) 200,000-gal capacity for a single event; 9) 80 percent recovery of fuel from the first cycle through the process; and 10) ability to pump fuel from a berm system that is burning.
The initial concept would be to place the decontamination capability between the contaminated fuel pool and an R-11/R17.5 fuels truck or a nearby storage tank, so the technology separates and purifies spilt fuel as it pumps the recovered fuel back into the "clean" system. Proposed technologies must be technically sound and realistically feasible for engineering design, production and testing. The intent is to incorporate the technology into existing fuel filtering/recovery systems to improve and enhance fuel recovery capability.
Phase I:
Develop and demo as breadboard prototype concept to remove 0.5 wt-percent each of water, AFFF, rust fines and soot from JP-8. Design system to monitor fuel quality in reclamation flow. Propose prototype-to-product concepts for a rapid, transportable fuel reclamation system that measures fuel quality throughout the process. Deliverables: system designs, four interim and one final technical report.
Phase II:
Refine breadboard and pilot-scale capability to demonstrate all steps of a continuous fuel reclamation process and flow quality monitoring at a rate of 10 gal/min for 30 minutes and that is suitable for engineering development to a final product. Deliverables: 11 interim reports & a final technical report that details of designs and testing, including test results, and an initial manufacturing design for a fieldable system scaled to satisfy the full set of performance conditions above.
Phase III:
Final product will be suitable for fuel recovery due to loss at commercial fuel-handling and storage facilities due to attack, accident or natural disaster, and rapid fuel reclamation to minimize environmental damage due to accidental fuel spills from storage locations.
Files
| File | Type | Posted |
|---|---|---|
| AF161-001.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity