Radio Frequency Range Modernization, Compatibility and Capability Study

Closed Solicitation Posted

Solicitation number
AF161-016
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
AC12 National Defense R&D Services; Department Of Defense - Military; Applied Research
More information

Notice details come from DoD SBIR/STTR (DSIP). Updated .

Notice text

DoD SBIR topic AF161-016

Component: USAF

Command: AFSC-HILL

Phase: SBIR Program Phase I Action

Technology Areas: Electronics

Keywords: RF antenna range; FCRAT; radome; NRET

Objective:

The equipment for testing aircraft radars is out of date and no longer supportable. New technology has to be researched and developed to modernize the radio frequency (RF) test ranges in the sustainment community.

Description:

The Air Force is interested in combining the Air Force Sustainment Center's RF ranges into one maintenance contract, and to standardize the capabilities and compatibility across the AFSC complexes, i.e., at Tinker, Hill and Robins AFBs. The equipment for testing aircraft radars is out of date and no longer supportable. Therefore, there is a need to research and develop new RF equipment to test radars systems at the three complexes.

The Nose Radome Electrical Test System (NRETS) RF Radome ranges was upgraded in the 1980s and "refurbished" in 2000/2001. NRETS RF ranges test, verify, and validate radome’s capabilities and calibrate. The maintenance and upkeep for the 15-plus-year-old RF equipment has become very difficult. Neither equipment replacements nor parts for refurbishing can be found or purchased. In fact, last year the N2 RF range was down for eight months, leaving the N1 to handle the full workload. The N1 RF range, therefore, became a single point of failure, potentially risking a total work stoppage. The two Fire Control RADAR Antenna Test System (FCRATS) RF Antenna ranges have similar RF to the NRETS RF ranges and are only four years newer, having been refurbished in 2004/2005. The FCRATS RF ranges are quickly becoming a potential risk for a workflow stoppage, as well.

The RF Range Modernization, Compatibility & Capability Study effort proposes to research and develop upgrades to NRETS RF Radome ranges (N1 and N2) and FCRATS RF Antenna ranges (F2 and F3).

Note there two additional FCRATS RF ranges (F1 and F4) that are currently not being used, but are being cannibalized to maintain the functioning (F2 and F3) ranges. The F4 FCRATS RF range is also being looked at for possible new workloads.

The proposer shall research and develop solutions to identified problems for the FCRAT RF Antenna ranges obsolete/unsupportable equipment. The equipment includes, but is not limited to, the following: • MI Technology 4190 and 4193 position controller and power amplifier • MI Technology lobing interface unit • MI Technology rate sensor • Viasat 3862 antenna control unit • Servo amplifiers for antenna azimuth and elevation position control • Antenna gimbal azimuth and elevation motors • Agilent vector network analyzer, signal source and power supply • Software update to communicate with and operate new equipment • Cabling to connect new equipment as needed update all affected Technical Order drawings, original equipment manufacturer manuals, software, and other documentation

The study's research and development effort will result in verifying and validating the new technologies in the two NRETs and two FCRATs RF Antenna ranges previously mentioned, including control rooms, subsystems equipment/components, software and capabilities, and their interfacings and compatibility, to ensure current and future range capabilities, possibilities of workflow growth and for their future sustainability of the worldwide fleet. The proposer shall perform business case analysis (BCA) for the developed solution.

Phase I:

Develop a solution that meets above requirements and conduct preliminary BCA to determine implementation costs, including a return-on-investment (ROI) calculation that compares anticipated savings to expected costs. Proof-of-concept prototype(s) shall be developed to demonstrate conformance to the requirements. Investigate/prepare paper work for required certifications.

Phase II:

Proof-of-concept prototype(s) shall be refined to installation-ready article and shall undergo testing to verify and validate all requirements. This process may require multiple iterations before a final design is selected. Refine BCA/ROI based on the final design.

Phase III:

If the RF Range Modernization, Compatibility & Capability Study R&D program proves cost effective, then we will implement developed, verified and validated solution(s) in Air Force depot operations.

Files

File Type Posted
AF161-016.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors