R604--Mail Meter Machine Lease-New Contract for Mail Meter Machines one (1) year base period with four (4) one (1) year option periods.
Closed Pre-Solicitation Posted
- Solicitation number
- 36C10E23Q0078
- Agency
-
VBA Headquarters
Veterans Benefits Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 513140 Directory and Mailing List Publishers
Notice details come from SAM.gov. Updated .
Notice text
ST PETERSBURG, VA REGIONAL OFFICE
9500 BAY PINES BLVD
ST PETERSBURG, FL 33708
STATEMENT OF WORK
Mail Meter Machines
VR&Es Jacksonville, Orlando, Sunrise and Bay Pines, Florida
Larry Smith
March 27, 2023
Mail Meter Machines
INTRODUCTION
The U.S. Department of Veterans Affairs, Vocational Rehabilitation and Employment (VR&E) Offices are seeking to provide the lease for installation, and maintenance upkeep of four (4) new Mail Meter Machines.
Location 1 9500 Bay Pines Blvd, Bay Pines, FL 33744
Location 2 7825 Baymeadows Way, Jacksonville, FL 32256
Location 3 5201 Raymond Street, Bldg 500, Orlando, FL 32803
Location 4 9800 Commercial Blvd, Sunrise, FL 33351
Duration. The term of this requirement will consist of a one (1) year base period with four (4) one (1) year option periods.
The machines that we have now are as follows:
Relay 3000 is located at the St. Petersburg RO and the DM400 s is located at the other out base locations.
Scope of Work
Contractor will:
Conduct field site survey at all three locations to verify measurements, exact locations, connectivity, and site conditions for the installation of three mail meter machines.
Provide and install three mail meter machines, one at each of the three identified locations according to the specifications in paragraph 8.
Certify all connections to ensure proper operation.
Provide training to personnel in each office
Provide for routine maintenance and repairs, as well as emergency repairs within four hours of initiation by the respective offices. Routine maintenance, emergency repairs and repairs will be at no cost.
GOVERNMENT FURNISHED ITEMS AND SERVICES
Parking. The government shall provide at no cost, parking space and access to the VR&E Offices as necessary.
CONTRACTOR FURNISHED ITEMS AND SERVICES
GENERAL. The Contractor shall:
Provide all supervision, labor, administrative support, materials, tools, parts, supplies, equipment, software, hardware, freight, lodging, transportation costs (rental car, air fare, etc.), per diem, and transportation to and from work site, necessary to fulfill all the requirements of this Statement of Work (SOW) effectively and efficiently.
Provide a fully qualified on-site technician who shall be responsible for the performance of work. The name of the person and all alternates shall be designated in writing to the designated Contracting Officer Representative (COR). The technician shall have full authority to act for the contractor. The technician shall be on-site during work hours and for contingencies requiring work beyond normal work hours. The Contracting Officer (CO) shall have the right to determine whether the proposed representative has sufficient technical and lingual capabilities, and the contractor shall immediately replace any individual not acceptable to the Government.
Have a thorough knowledge of the installation and functionality of Mail Meter machines.
Provide and utilize on the job site any diagnostic equipment that will enable the Contractor to diagnose/troubleshoot/repair/replace all components to the Meter units.
Be responsible for the acts and omissions of their employees and all subcontractors, their agents and employees and all other persons performing any work under contract with the Contractor.
Not deposit contractor debris in government contracted waste containers.
Perform work in an occupied space during normal working hours from 8 AM to 4 PM.
Respond within 4 hours of being called for repair issues.
transportation costs (rental car, air fare, etc.), per diem, and transportation to and from work site, necessary to fulfill all the requirements of this Statement of Work (SOW) effectively and efficiently.
SECURITY. The Contractor is required to enter and exit each building through the front entrance. Entering or exiting the building through any other door will require VARO approval and an escort. Upon entering the building, the contractor and/or contractor employees will be required to show proof of identity (must have a valid photo ID) as well as pass through a security screening.
SAFETY. The following safety criteria shall be met at the time of the acceptance inspection:
Equipment. The Contractor shall provide all safety equipment/devices, personal protective equipment and clothing as required for its employees.
Compliance with Laws. Contractor represents and warrants that the performance of this contract and the furnishing of goods or services required shall be in accordance with the applicable standards, provisions and stipulations of all pertinent Federal, State or Authority laws, rules, regulations, resolutions, and ordinances including but not limited to the Fair Labor Standards Act, the Equal Employment Opportunity rules and regulations, the Transportation Safety Act, the National Environmental Policy Act, and the Occupational Safety and Health Acts.
DESCRIPTION OF SERVICES. The following services shall be provided by the Contractor:
Phase I - Pre-installation. The Contractor will provide all equipment, parts, labor, and expertise necessary to complete the required pre-installation inspection. The Contractor will:
Perform a physical pre-installation inspection to evaluate site conditions and verify field measurements prior to submitting a bid towards this statement of work.
Ensure all components necessary to install the new Meter Machines are on hand prior beginning installation. The Contractor will ensure all work permits and licenses, if required, are on hand prior beginning any work.
Phase II Installation. The Contractor will provide all parts, labor, and expertise necessary to complete the required installations. During the installation phase the Contractor will:
Phase III Post Installation. During the post installation phase, the Contractor will:
Ensure all installation material and debris is removed from each property. All waste and debris will be removed from the VA property and disposed of in accordance with local, state, and federal regulations. No waste or debris will be deposited in, on, or around any VA trash containers.
Provide training to VA personnel on operation of new Meter Machines.
Maintenance. The contractor shall perform both scheduled and unscheduled maintenance on the Mail Meter Machines located at the properties as required. Contractor will provide all parts, labor, and expertise necessary to complete required maintenance tasks.
Unscheduled maintenance and emergency requests will be responded to within 4 hours.
Scheduled maintenance The contractor shall provide a quarterly scheduled maintenance plan when submitting their quote.Â
Inoperable Meter components will be repaired or replaced within 24 hours.
Parts include those items that must be replaced due to fair wear and tear. The cost for parts and labor for maintenance or damage resulting from operator negligence may be submitted through the Contracting Officer Representative for consideration of payment.
Meter spare parts inventory. The contractor will maintain a spare parts inventory sufficient for specified maintenance and repair requirements to keep the Meters continuously operating. Under normal conditions a Meter Machine should not be unserviceable for more than 24 hours.
Preventive Maintenance: The contractor shall provide, at a minimum, eight preventive maintenance service call during the performance period to ensure that the mail meter machines are maintained in fully operational condition. Contractor shall maintain the mail meter machines in at levels necessary to provide the specified functions to meet the manufacturer s current equipment specifications
MINIMUM MAIL METER MACHINE SPECIFICATIONS:
The Mail Meter Machines for the VR&E Offices shall have.
a touch screen and keypad for input
minimum 10 lb. weighing platform
label dispenser
automatic mail feeder
automatic envelope sealing system
conveyor stacker
LAN connectivity
Pull updates over-the-air for postal rate updates and funds
batch processing speed of at least 110 letters per minute
ability to process .75-inch-thick envelopes
high-capacity ink tank
Files
| File | Type | Posted |
|---|---|---|
| 36C10E23Q0078.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity