Pump unit, centrifug, in repair/modification of
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N0010420QFC78
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333999 All Other Miscellaneous General Purpose Machinery Manufacturing
- PSC
- 4320 Power And Hand Pumps
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
CONTACT INFORMATION|4|N743.20|WR5DD|(717)605-3261|amber.l.miller@navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See sections C and E.|
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x||||||
TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001AA|ONE(1)||||||||||||||X|04 AUGUST 2021||||
GENERAL INFORMATION-FOB-DESTINATION|1|B|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material|Inspection at Destination and Acceptance at Other - Certifications Inspection at Source and Acceptance at Source - Mat
erial|TBD|N00104|TBD|N45404 - Certifications, S4306A - Material|S4306A for material N45404 for certifications|TBD|N/A|N/A|N/A|N45404 - Certifications|N/A|N/A|See form DD1423|1-866-618-5988 - WAWF Helpdesk|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|333914|750||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
1. Subject requirement is hereby updated to include revisions of FAR and DFARS clauses already incorporated into the solicitation.
2. Clause 252.222-7999 Combatting Race and Sex Stereotyping (DEVIATION 2021-O0001) is hereby incorporated into the subject requirement.
COMBATTING RACE AND SEX STEREOTYPING
(DEVIATION 2021-O0001)(NOV 2020)
(a) Definitions. As used in this clause -
"Race or sex scapegoating" means ascribing character traits, values, Moral and ethical codes, privileges, status, or beliefs to a race or sex, or to an individual because of his or race or sex.
(b) Exemptions. The exemptions that apply to Executive Order (E.O.) 11246 (see FAR 22.807) also apply to E.O. 13950 and the requirements of this clause.
(c) Compliance with E.O. 13950, Combating Race and Sex Stereotyping. Unless exempted under paragraph (b) of this clause, the Contractor shall not use any workplace training that inculcates in its employees any form of race or sex scapegoating,
including the concepts that -
(1) One race or sex is inherently superior to another race or sex;
(2) An individual, by virtue of his or her race or sex, is inherently racist, sexist, or oppressive, whether consciously or unconsciously
(3) An individual should be discriminated against or receive adversetreatment solely or partly because of his or her race or sex;
(4) Members of one race or sex cannot and should not attempt to treat others without respect to race or sex;
(5) An individual's moral character is necessarily determined by his or her race or sex;
(6) An individual, by virtue of his or her race or sex, bears responsibility for actions committed in the past by other members of the same race or sex;
(7) Any individual should feel discomfort, guilt, anguish, or any other form of psychological distress on account of his or her race or sex; or
(8) Meritocracy or traits such as hard work ethic are racist or sexist, or were created by a particular race to oppress another race.
(d) Notice. The Contractor shall send, to each labor union or representative of workers with which it has a collective bargaining agreement or other contract or understanding, the notice provided below advising the labor union or workers'
representative of the Contractor's commitments under this clause, and post copies of the notice in conspicuous places available to employees and applicants for employment.
NOTICE
E.O. 13950, Combatting Race and Sex Stereotyping
Employers Holding Federal Contracts or Subcontracts
Contractors shall not use workplace training that inculcates in its employees any form of race or sex stereotyping or any form of race or sex scapegoating, including the following concepts that -
(1) One race of sex is inherently superior to another race or sex;
(2) An individual, by virtue of his or her race or sex, is inherently racist, sexist, or oppressive, whether consciously or unconsciously;
(3) An individual should be discriminated against or receive adversetreatment solely or partly because of his or her race or sex;
(4) Members of one race or sex cannot and should not attempt to treat others without respect to race or sex;
(5) An individual's moral character is necessarily determined by his or her race or sex;
(6) An individual, by virtue of his or her race or sex, bears responsibility for actions committed in the past by other members of the same race or sex;
(7) Any individual should feel discomfort, guilt, anguish, or any other form of psychological distress on account of his or her race or sex; or
(8) Meritocracy or traits such as a hard work ethic are racist or sexist, or were created by a particular race to oppress another race.
For use in this notice -
"Race or sex scapegoating" means assigning fault, blame, or bias to a race or sex, or to members of a race or sex because of their race or sex; and
"Race or sex stereotyping" means ascribing character traits, values, moral and ethical codes, privileges, status, or beliefs to a race or sex, or to an individual because of his or her race or sex.
Any person who believes a contractor has violated its nondiscrimination or affirmative action obligations under this notice should immediately contact the Office of Federal Contract Compliance Programs (OFCCP) Complaint Hotline to Combat Race and Sex
Stereotyping at 202-343-2008 or via email at OFCCPComplaintHotline@dolgov.
(End of notice)
(e) Noncompliance. In the event it is determined that the Contractor is not in compliance with this clause or any rule, regulation, or order of the Secretary of Labor, this contract may be canceled, terminated, or suspended in whole or in part, and the
Contractor may be declared ineligible for further Government contracts, under the procedures authorized in E.O. 11246, as amended. In addition, sanctions may be imposed and remedies invoked against the Contractor as provided in E.O. 11246, as amended;
in the rules, regulations, and orders of the Secretary of Labor; or as otherwise provided bylaw.
(f) Subcontracts. (1) The Contractor shall include the substance of thisclause, including this paragraph (f), in all subcontracts that exceed $10,000 and are not exempted by the rules, regulations, or orders of the Secretary of Labor issued under E.O. 11246,
as amended, so that these terms and conditions will be binding upon each subcontractor.
(2) The Contractor shall take such action with respect to any subcontract as the Director of OFCCP may direct as a means of enforcing these terms and conditions, including sanctions for noncompliance, provided, that ifthe Contractor becomes
involved in, or is threatened with, litigation with a subcontractor as a result of such direction , the Contractor may request the United States to enter the litigation to protect the interests of the UnitedStates.
(end of clause)
3. Solicitation is extended to 08 December 2020.
4. All other terms and conditions remain unchanged.
1. This is a Level 1/AERP (Advanced Equipment Repair Program) requirement.
2. Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mech.
3. This is a Sole-Source (3R) requirement to Curtiss-Wright Electro-Mechanical Corporation (CAGE 0UBG9). The Government does not own the data or the rights to the data needed to purchase this part from additional sources. It has been determined to be uneconomical
to buy the data or the rights to the data. It is uneconomical to reverse engineer the part.
4. "The IWST has determined that all NIINs for this requireemnt are covered by the 30 July 2018 Class Determination and Findings (D&F) for the Special Emergency Procurement Authority (SEPA), and that the criteria in Paragraph 3 thereof are met. Proceed with the
use of SEPA as appropriate. The carcass(es) is/are available for repair."
5. This requirement utilizes Government Furnished Property (GFP). This requirement will utilize the carcasses with SMIC numbers 0424 and 0426 from previous contract order Basic Ordering Agreement (BOA) N0010412GA765 Delivery Order (DO) 0042 and carcass with SMIC
0423 from BOA N0010412GA756 DO 0043. These carcasses will be frankensteined and repaired into one unit for delivery.
6. Carcasses above have previously been evaluated for repair, therefore quote/proposal is to be submitted as a Firm-Fixed Price (FFP) for the full repair effort of the requirement. The resulting contract will be a delivery order placed against Basic Ordering
Agreement (BOA) N00104-17-G-AS01.
7. This item requires Production Radiography and Radiographic Shooting Sketches. The following delivery schedule applies:
RADIOGRAPHIC SHOOTING SKETCHES (RSS) 45 DAYS ADC SD
APPROVAL OF RADIO RSS 30 DAYS AFTER RECEIPT
PRODUCTION RADIOGRAPHY (PR) 135 DAYS AFTER APPROVAL OF RSS SD
APPROVAL OF PR 30 DAYS AFTER RECEIPT
8. The final delivery date for this requirement to meet the needs of the Fleet is 04 August 2021. Early shipment is desired and acceptable but at no additional cost to the Government.
1. SCOPE
1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital
shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.3 Specification Revisions - The specification revisions listed under "Docu ments References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric
Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification
revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009,
R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.
2.4 Certian documents pertaining to this item are classified. The seller must be cleared to receive these classified documents. A DD form 254 is required. Vendors require access to Confidential National Security Information. ;10640-A-18 Rev B; is
classified. Classification is ;Confidential; .
2.4.1 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order.
DRAWING NO CAGE REV DISTR CD
;10591-H-18 88032 F D
PL-10591-H-18 88032 C E
10580-F-18 88032 I B
10640-A-18 88032 B B;
2.4.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.4.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
DRAWING DATA=10640-A-18 |88032| |CD |D|0001 | |00026|0000000
DRAWING DATA=3505-20 |95402| | |D|0001 | |49998|0782765
DRAWING DATA=3505-9 |95402| B| |D|0001 | B|49998|2401675
DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | |
DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | |
DOCUMENT REF DATA=ASTM-A193 | | | |171115|A| | |
DOCUMENT REF DATA=ASTM-A194 | | | |181101|A| | |
DOCUMENT REF DATA=ASTM-A285 | | | |030910|A| | |
DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | |
DOCUMENT REF DATA=ASTM-A479 | | | |180101|A| | |
DOCUMENT REF DATA=ASTM-A487 | | | |931215|A| | |
DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | |
DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | |
DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | |
DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | |
DOCUMENT REF DATA=ISO10012 | | | |030415|A| | |
DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | |
DOCUMENT REF DATA=MIL-S-24093 | | |A |911105|A| | |
DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |
DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | |
DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | |
DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | |
DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | | |950801|A| | |
DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | |
DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | |
3. REQUIREMENTS
3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) -
3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout
refurbishment.
3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied.
3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this TDP (Technical Data Package).
3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Ingersoll Rand Co. drawings 10951-H-18 and PL-10951-H-18, Maintenance Standard 2550-081-066 revision B Change 3, SHIPALT SSN3982, Tech Manual
0947-LP-200-5010 Revision 01 dated 3/12/09, Ingersoll Rand Co drawing 10640-A-18 revision B,(General Dynamics motor drawing 3505-9 with Maintenance Standard 2550-081-062 revision D Change 3 or General Dynamics motor drawing 3505-20 with Maintenance Standard
2550-081-063 revision C change 1) and Refurbishment Instruction 5520-012-0700 Rev C (CSD135); , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order.
3.1.5 Additional SOW Requirements -
;N/A;
3.1.6 ;SMIC Q3 parts for the Pump/Motor assembly which meet RI 5520-012-0700 (CSD135) requirements can be reused.;
3.2 ;No-Forn documents Maintenance Standard 2550-081-066, Maintenance Standard 2550-081-062, Maintenance Standard 2550-081-063, SHIPALT SSN3982 and confidential document Tech Manual 0947-LP-200-5010 will be provided by mail if the bidder does not possess
them.;
3.3 ;Replace packing gland assembly with a split mechanical seal assembly in accordance with SHIPALT SSN3982.;
3.4 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD135; in ECDS at https://register.nslc.navy.mil/
3.5 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise:
Part - ;End Cover; Item No. 158 and Shell; Item No. 476;
Material - ;MIL-S-24093 Class H;
Part - ;Studs; Item No's. 178A, 178B and 178C;
Material - ;ASTM-A193 Grade B7;
Part - ;Nuts; Item No's. 179A,179B and 179C;
Material - ;ASTM-A194 Grade 2H;
Part - ;Blind Flange; Item No.186;
Material - ;ASTM-A285 Grade C;
Part - ;Nut Slotted; Item No. 179G;
Material - ;QQ-N-286 FORM 2; Hot Finished; Annealed and Age Hardened or Cold Drawn ;Annealed and Age Hardened.;
Part - ;Rod,Tie; Item No. 374;
Material - ;QQ-N-286 Form 2, annealed and age hardened;
Part - ;Nozzle Head Assembly; Item No. 477 (Nozzle Head);
Material - ;ASTM-A487 Grade CA-6NM;
Part - ;Nozzle Head Assembly, Item No. 477 (Nipple,Flange);
Material - ;SAE-AMS-QQ-S-763, Class 410, Condition T;
Part - ;Plug; Item 417A;
Material - ;ASTM-A479 Type 316 Annealed;
Part - ;Shaft: item 42 of drawing 3505-9;
Material - ;MIL-S-24093 Class D Type II or AISI Quenched and Tempered and meeting the mechanical properties of note 22 of drawing 3505-9;
3.6 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below.
Test - ;Dye Penetrant Inspection;
Item - ;Nozzle Head Assembly, Item No. 477 (Nipple,Flange);
Performance - T9074-AS-GIB-010/271
Acceptance - S9074-AR-GIB-010A/278
Test - ;Dye Penetrant Inspection;
Item - ;Nozzle Head Assembly; Item No. 477(Nozzle Head);
Performance - T9074-AS-GIB-010/271
Acceptance - S9074-AR-GIB-010A/278
Test - ;Magnetic Particle Inspection;
Item - ;Nozzle Head Assembly; Item No. 477 (Nozzle Head);
Performance - T9074-AS-GIB-010/271
Acceptance - S9074-AR-GIB-010A/278
Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer)
Item - Weldments
Performance - T9074-AS-GIB-010/271
Acceptance - MIL-STD-2035
Test - Visual and Dye Penetrant Inspection (final layer)
Item - Weldments
Performance - T9074-AS-GIB-010/271
Acceptance - MIL-STD-2035
Test - ;Liquid Penetrant Inspection;
Item - ;Nut Slotted; Item No. 179G;
Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222
Acceptance - MIL-DTL-1222
Test - ;Liquid Penetrant Inspection or Magnetic Particle Inspection (Wet Method) (Either inspection is acceptable);
Item - ;Studs; Item No's 178A, 178B and 178C Nuts; Item No,s 179A, 179B and 179C;
Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222
Acceptance - MIL-DTL-1222
Test - ;Insulation Resistance;
Item - ;Motor;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Structureborne noise test;
Item - ;Each Pump/Motor assembly;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Operational Test;
Item - ;Each Pump/Motor assembly;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Hydrostatic test;
Item - ;Pump;
Performance - ;Paragraph 1.al. of MS 2550-081-066;
Acceptance - ;Paragraph 1.al. of MS 2550-081-066;
Attribute - ;Maintenance Standard 2550-081-066 inspections requiring a recorded measurement or checked as SAT or UNSAT;
Item - ;Each Pump assembly;
Performance - ;Maintenance Standard 2550-081-066;
Attribute - ;Maintenance Standard inspections requiring a recorded measurement or checked as SAT or UNSAT;
Item - ;Each Motor assembly;
Performance - ;Maintenance Standard 2550-081-062 for General Dynamics motor drawing 3505-9 or Maintenance Standard 2550-081-063 for General Dynamics motor drawing 3505-20;
Test - ;Hydraulic pump curve test;
Item - ;Each Pump/Motor assembly;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Pump and motor design capacity test;
Item - ;Each Pump/Motor assembly;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Pump mechanical seal leakage test;
Item - ;Each Pump;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Attribute - Annealing and Age Hardening
Item - ;Nut,Slotted; Item No. 179G and Rod,Tie; Item No. 374;
Performance - QQ-N-286
3.7 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the
following must be used:
For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG.
For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG.
30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG.
The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in
this contract, the following must be used:
For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes.
For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes.
For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes.
3.8 K-MONEL Fasteners - Material must be heat treated per QQ-N-286.
3.8.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the
annealed and age hardened material and must meet the requirements of QQ-N-286.
3.8.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be
cut or ground only.
3.9 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories:
Huntington Alloys, a Special Metals Company
Attn: Bill Bolenr
3200 Riverside Drive
Huntington, WV 257059
Phone: (304) 526-5889
FAX: (304) 526-5973
Metallurgical Consultants, Inc.
Attn: W. M. Buehler
4820 Caroline
PO Box 88046
Houston, TX 77288-0046
Phone: (713) 526-6351
FAX: (713) 526-2964
Naval Surface Warfare Center, Carderock Division
Attn: Eric Focht Code 614
9500 Macarthur Blvd
West Bethesda, MD 20817-5700
Phone: (301) 227-5032
FAX: (301) 227-5576
Teledyne Allvac
Attn: Dr. W. D. Cao
2020 Ashcraft Ave.
Monroe, NC 28110
Phone: (704) 289-4511
FAX: (704) 289-4269
Westmoreland Mechanical Testing and Research Inc.
Attn: Andrew Wisniewski
P.O. Box 388
Youngstown, PA 15696-0388
Mannesmann Rohrenwerke
Mannesmann Forschungsinstitut (MFI)
Attn: Dr. Weiss
Postfach 251160
47251 Duisburg
Germany
Phone: 011-49-0203-9993194
FAX: 011-49-0203-9994415
ThyssenKrupp VDM USA, Inc.
Attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
Houston, TX 77065-4939
Phone: (281) 955-6683
3.10 Welding or Brazing - When welding, brazing, and allied processes are required, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production
and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing.
3.11 Radiography is required on ;Nozzle Head and Pump Casing; .
3.12 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;Tech Manual 0947-LP-200-5010; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to
mark the working pressure on the item does not apply and is strictly prohibited.
3.13 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent
inspection in accordance with ASME B1 series is acceptable.
3.13.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement.
3.13.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System
22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222.
3.13.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system.
3.14 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable.
3.15 Component Identification - An AERP serial number will be assigned to each component and a nameplate will be provided by NAVSUP WSS MECH, Code N97121, as Government Furnished Equipment (GFE) prior to packaging and shipment. The Contractor is requested to
notify NAVSUP WSS MECH, Code N97121 when the manufacturing process is ready for the nameplate(s), allowing sufficient time for mailing. Additional details are clarified in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
3.16 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document,
including any/all invoked specifications and drawings.
3.17 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format.
Definitions are provided elsewhere in the Contract/Purchase Order.
3.17.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide
a copy of this request to the QAR. Requests must include the information listed below.
a. A complete description of the contract requirement affected
and the nature of the waiver/deviation (non-conformance),
including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this
configuration.
c. Any impacts to logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel or impacts to the operational use of the product.
d. Information about remedial action being taken to prevent reoccurrence
of the non-conformance.
3.17.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/
3.17.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering
Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II),
and change justification.
b. A complete description of the change to be made and the need for
that change.
c. A complete listing of other Configuration Items impacted by the
proposed change and a description of the impact on those CIs.
d. Proposed changes to documents controlled by the Government.
e. Proposed serial/lot number effectivities of units to be
produced in, or retrofitted to, the proposed configuration.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel in support of the product.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the
engineering change.
3.18 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
3.19 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further
application of the above documents is prohibited.prohibited.
3.19.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.
^ QUALITY ASSURANCE REQUIREMENTS ^
3.20 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected,
identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance
criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.
3.21 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as
part of the certification OQE package submitted by the Contractor.
Note: These requirements do not apply to tack/spot welds.
3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair).
3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The
approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be
submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data
submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." " WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ."). Authority for the
repair of Special Repairs in castings and authority for the repair of wrought or forged material material must be obtained from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of
the proposed repair. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application.
3.21.3 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 48 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 48 hour time limit may be modified upon mutual
agreement between the vendor and DCMA.
3.21.4 When drawings require hard facing surface Iron content (Nickel for Monel valves) not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results
must be submitted as part of the qualification data.
3.21.5 Qualification requirements for production hardfacing: The maximum qualified thickness for hardfacing must be twice the weld deposit thickness measured in the as-welded condition that is subjected to initial NDT (Non-Destructive Testing) and any
additional drawing requirements. The minimum qualified thickness is the final machined thickness at which hardness testing, NDT, macro-etch, and any additional drawing requirements are satisfactorily performed.
3.21.6 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not
listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element.
3.21.7 Qualification requirements for production cladding: The maximum qualified thickness for cladding must be twice the weld deposit thickness measured in the as-welded condition that is subjected to initial NDT and any additional drawing requirements.
The minimum qualified thickness is the final machined thickness at which NDT, side bends, macro-etch testing, and any additional drawing requirements are satisfactorily performed.
3.21.8 When weld repair is required on titanium material, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted for review and approval.
3.21.9 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable
documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training
plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic formation, such as Adobe Acrobat
PDF.
3.21.10 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278.
3.21.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following:
a) Filler Metal LOT number(s)
b) Specification and Type
c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements.
d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption.
3.21.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor.
3.22 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012
or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.
3.22.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality
requirements established in the Contract/Purchase Order.
3.22.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon
notification, make his facilities available for audit by the contracting Officer or his authorized representative.
3.22.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of
any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.22.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly
notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency
(DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.
3.22.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.23 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and
rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.23.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made
available for operations of such devices and for verification of their accuracy and condition.
3.23.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided
by the Government representative.
3.24 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization
of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being
purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon
receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest
Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.24.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.24.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services
specified in the purchase order or contract.
3.24.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the
purchased product on the end item represented by this contract.
3.24.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be
established. Records of this effort must be available for review by the government.
3.24.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.25 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:
3.25.1 Visual examination upon receipt to detect damage during transit.
3.25.2 Inspection for completeness and proper type.
3.25.3 Verification of material quality received.
3.25.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.25.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
3.25.6 Identification and protection from improper use or disposition.
3.25.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and
necessity for withholding the material from use.
3.25.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on
bailed property must be maintained.
3.25.9 Material returned to the contractor must be handled as GFM.
3.26 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required
Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3,
Section C of this contract/purchase order.
3.26.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that
implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order.
3.27 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must
provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of
operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.
3.27.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the
marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is
permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.
3.27.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and
the tag securely affixed to the material.
3.27.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the item identifying the part
number, piece number, traceability number, and the location of the permanent mark.
3.27.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ;
3.28 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply:
3.28.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the
material supplied.
3.28.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or
mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used
during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material
must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered,
the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below.
TRACEABILITY MARKING ________________________________________________
(marking on finished item)
IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO
HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER _____________________
(when applicable)
_________________________________________ DATE _____________________
(name and signature of auth. co. rep.)
3.28.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract
requirements. Transcription of certification data is prohibited.
3.28.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.
3.28.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
3.29 Material Handling - The written material control process must include the following:
3.29.1 All raw materials must have traceability markings (except as specified below).
3.29.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.
3.29.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate
material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability
marking must be reapplied upon completion of the final manufacturing process.
3.29.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a
minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and
grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.
3.29.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in
DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.
3.29.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking
location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.
3.30 Receiving inspection -
3.30.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to
another location.
3.30.2 Receiving Inspection must include as a minimum -
Verification that the traceability marking on the material agrees with that on the certification test reports.
Verification that certification test reports are legible and complete.
Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements.
3.31 Discrepancy reporting -
3.31.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to
the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR).
3.32 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance.
3.32.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military
specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code),
table IIA (for sample size).
SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot.
3.32.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the
Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above.
3.32.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification
test reports must also be 100% inspected for completeness and legibility.
3.32.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible.
3.33 Additional Marking for Fasteners - Fasteners must be marked in accordance with ;MIL-DTL-1222; . The method of marking must be types I, II, III, V, VIII or IX of MIL-STD-792 except for grades 410, 416 and 431 in the H condition and grades 8, 630, A574,
and 4340 which must be marked by method II when marking is applied after the final heat treatment. Markings on fasteners that are to be coated must be marked prior to coating and have a minimum depth of 4 mils. Traceability marking must be legible after the
application of protective compounds.
3.33.1 Marking is required for all fasteners regardless of size and must include the material symbol, the manufacturer's identification symbol, and the traceability marking. Marking must be applied on the head of headed fastener (top preferred, side
location if necessary). Self-Locking screws must also be marked with six dots. Where no contract invoked specification requirement exists for this marking, self-locking fasteners must be marked with six dots approximately .032" diameter, raised or depressed
by approximately .010" located on the top perimeter of the head of the fastener in an arc or circular pattern. The six dots must be distinguishable from all other required markings.
3.34 Radiography (RT) - Radiography must be performed in accordance with T9074-AS-GIB-010/271. RT acceptable criteria for castings to be criticality level Iper the applicable table of S9074-AR-GIB-010A/278. RT acceptance criteria for weldments to be per the
applicable table of S9074-AR-GIB-010A/278 (P-1 piping) or MIL-STD-2035, class 1, as applicable.
3.34.1 See CDRL DI-MISC-80678 (RSS) - The Contractor or activity performing theradiography must be responsible for preparing the radiographic shooting sketches (RSS) in accordance with T9074-AS-GIB-010/271. Shooting sketches are not required for radiography
of weldments. The radiographic standard shooting sketches (RSSS) referenced on the applicable drawing may be used, however, since T9074-AS-GIB-010/271 permits a variety of processes, the RSSS may not be applicable as they will not necessarily depend only on
the coverage requirements, but also on the equipment and procedures of the particular radiographic facility. Approval of these shooting sketches or radiographic standard shooting sketches is required per S9074-AR-GIB-010A/278. If this datahas been previously
approved by a Navy activity, the original approval letter must be submitted at the same time as RT film and reader sheet submittal.
3.34.2 All pieces radiographed must be permanently marked with "RT" and a unique RT serial number. (The unique RT serial number must be directly traceable tothe RT film.)
3.34.3 See CDRL DI-MISC-80678 (Production Radiography) - Production Radiographyrequires final acceptance by the Navy. The items listed below must be submitted for final acceptance, cataloging, file, and retention. They must be submitted and approved prior to
shipment of the applicable hardware. However, when the source certification clause is invoked, they must be submitted a minimum of forty-five (45) working days prior to the date of source certification inspection.
(a) Film
(b) RSS/RSSS
(c) RS
(d) DD250 (with unique RT serial numbers traceable to the RT film)
3.35 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information:
1. Contractor's name, address and date.
2. The contract/purchase order number (for example: N00104-11-P-FA12)
3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC
(for example: 1H 4820 012345678 L1)
4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable).
5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable).
6. Manufacturer's compound number ("N/A" when Not Applicable).
7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable).
8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed
satisfactorily.
9. Contractor's or authorized personnel's signature.
4. QUALITY ASSURANCE
4.1 Notes to DCMA QAR and the Contractor -
4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a
disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition.
4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A
record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO.
4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements.
4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders.
4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at:
https://register.nslc.navy.mil/
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.2 ;Packaging shall be in accordance with Refurbishment Instruction 5520-012-0700 paragraph 8.5.;
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES
6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item.
6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD
(Contract Support Document) Library within ECDS.
6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the
ship, or unacceptable risk of personal injury or loss of life.
6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a
critical characteristic is within drawing or specification compliance (such as, test
Update #1 ·
CONTACT INFORMATION|4|N743.20|WR5DD|(717)605-3261|amber.l.miller@navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See sections C and E.|
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x||||||
TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001AA|ONE(1)||||||||||||||X|04 AUGUST 2021||||
GENERAL INFORMATION-FOB-DESTINATION|1|B|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material|Inspection at Destination and Acceptance at Other - Certifications Inspection at Source and Acceptance at Source - Mat
erial|TBD|N00104|TBD|N45404 - Certifications, S4306A - Material|S4306A for material N45404 for certifications|TBD|N/A|N/A|N/A|N45404 - Certifications|N/A|N/A|See form DD1423|1-866-618-5988 - WAWF Helpdesk|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|333914|750||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
1. This is a Level 1/AERP (Advanced Equipment Repair Program) requirement.
2. Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mech.
3. This is a Sole-Source (3R) requirement to Curtiss-Wright Electro-Mechanical Corporation (CAGE 0UBG9). The Government does not own the data or the rights to the data needed to purchase this part from additional sources. It has been determined to be uneconomical
to buy the data or the rights to the data. It is uneconomical to reverse engineer the part.
4. "The IWST has determined that all NIINs for this requireemnt are covered by the 30 July 2018 Class Determination and Findings (D&F) for the Special Emergency Procurement Authority (SEPA), and that the criteria in Paragraph 3 thereof are met. Proceed with the
use of SEPA as appropriate. The carcass(es) is/are available for repair."
5. This requirement utilizes Government Furnished Property (GFP). This requirement will utilize the carcasses with SMIC numbers 0424 and 0426 from previous contract order Basic Ordering Agreement (BOA) N0010412GA765 Delivery Order (DO) 0042 and carcass with SMIC
0423 from BOA N0010412GA756 DO 0043. These carcasses will be frankensteined and repaired into one unit for delivery.
6. Carcasses above have previously been evaluated for repair, therefore quote/proposal is to be submitted as a Firm-Fixed Price (FFP) for the full repair effort of the requirement. The resulting contract will be a delivery order placed against Basic Ordering
Agreement (BOA) N00104-17-G-AS01.
7. This item requires Production Radiography and Radiographic Shooting Sketches. The following delivery schedule applies:
RADIOGRAPHIC SHOOTING SKETCHES (RSS) 45 DAYS ADC SD
APPROVAL OF RADIO RSS 30 DAYS AFTER RECEIPT
PRODUCTION RADIOGRAPHY (PR) 135 DAYS AFTER APPROVAL OF RSS SD
APPROVAL OF PR 30 DAYS AFTER RECEIPT
8. The final delivery date for this requirement to meet the needs of the Fleet is 04 August 2021. Early shipment is desired and acceptable but at no additional cost to the Government.
1. SCOPE
1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital
shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.3 Specification Revisions - The specification revisions listed under "Docu ments References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric
Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification
revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009,
R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.
2.4 Certian documents pertaining to this item are classified. The seller must be cleared to receive these classified documents. A DD form 254 is required. Vendors require access to Confidential National Security Information. ;10640-A-18 Rev B; is
classified. Classification is ;Confidential; .
2.4.1 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order.
DRAWING NO CAGE REV DISTR CD
;10591-H-18 88032 F D
PL-10591-H-18 88032 C E
10580-F-18 88032 I B
10640-A-18 88032 B B;
2.4.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.4.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
DRAWING DATA=10640-A-18 |88032| |CD |D|0001 | |00026|0000000
DRAWING DATA=3505-20 |95402| | |D|0001 | |49998|0782765
DRAWING DATA=3505-9 |95402| B| |D|0001 | B|49998|2401675
DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | |
DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | |
DOCUMENT REF DATA=ASTM-A193 | | | |171115|A| | |
DOCUMENT REF DATA=ASTM-A194 | | | |181101|A| | |
DOCUMENT REF DATA=ASTM-A285 | | | |030910|A| | |
DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | |
DOCUMENT REF DATA=ASTM-A479 | | | |180101|A| | |
DOCUMENT REF DATA=ASTM-A487 | | | |931215|A| | |
DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | |
DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | |
DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | |
DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | |
DOCUMENT REF DATA=ISO10012 | | | |030415|A| | |
DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | |
DOCUMENT REF DATA=MIL-S-24093 | | |A |911105|A| | |
DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |
DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | |
DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | |
DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | |
DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | | |950801|A| | |
DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | |
DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | |
3. REQUIREMENTS
3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) -
3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout
refurbishment.
3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied.
3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this TDP (Technical Data Package).
3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Ingersoll Rand Co. drawings 10951-H-18 and PL-10951-H-18, Maintenance Standard 2550-081-066 revision B Change 3, SHIPALT SSN3982, Tech Manual
0947-LP-200-5010 Revision 01 dated 3/12/09, Ingersoll Rand Co drawing 10640-A-18 revision B,(General Dynamics motor drawing 3505-9 with Maintenance Standard 2550-081-062 revision D Change 3 or General Dynamics motor drawing 3505-20 with Maintenance Standard
2550-081-063 revision C change 1) and Refurbishment Instruction 5520-012-0700 Rev C (CSD135); , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order.
3.1.5 Additional SOW Requirements -
;N/A;
3.1.6 ;SMIC Q3 parts for the Pump/Motor assembly which meet RI 5520-012-0700 (CSD135) requirements can be reused.;
3.2 ;No-Forn documents Maintenance Standard 2550-081-066, Maintenance Standard 2550-081-062, Maintenance Standard 2550-081-063, SHIPALT SSN3982 and confidential document Tech Manual 0947-LP-200-5010 will be provided by mail if the bidder does not possess
them.;
3.3 ;Replace packing gland assembly with a split mechanical seal assembly in accordance with SHIPALT SSN3982.;
3.4 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD135; in ECDS at https://register.nslc.navy.mil/
3.5 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise:
Part - ;End Cover; Item No. 158 and Shell; Item No. 476;
Material - ;MIL-S-24093 Class H;
Part - ;Studs; Item No's. 178A, 178B and 178C;
Material - ;ASTM-A193 Grade B7;
Part - ;Nuts; Item No's. 179A,179B and 179C;
Material - ;ASTM-A194 Grade 2H;
Part - ;Blind Flange; Item No.186;
Material - ;ASTM-A285 Grade C;
Part - ;Nut Slotted; Item No. 179G;
Material - ;QQ-N-286 FORM 2; Hot Finished; Annealed and Age Hardened or Cold Drawn ;Annealed and Age Hardened.;
Part - ;Rod,Tie; Item No. 374;
Material - ;QQ-N-286 Form 2, annealed and age hardened;
Part - ;Nozzle Head Assembly; Item No. 477 (Nozzle Head);
Material - ;ASTM-A487 Grade CA-6NM;
Part - ;Nozzle Head Assembly, Item No. 477 (Nipple,Flange);
Material - ;SAE-AMS-QQ-S-763, Class 410, Condition T;
Part - ;Plug; Item 417A;
Material - ;ASTM-A479 Type 316 Annealed;
Part - ;Shaft: item 42 of drawing 3505-9;
Material - ;MIL-S-24093 Class D Type II or AISI Quenched and Tempered and meeting the mechanical properties of note 22 of drawing 3505-9;
3.6 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below.
Test - ;Dye Penetrant Inspection;
Item - ;Nozzle Head Assembly, Item No. 477 (Nipple,Flange);
Performance - T9074-AS-GIB-010/271
Acceptance - S9074-AR-GIB-010A/278
Test - ;Dye Penetrant Inspection;
Item - ;Nozzle Head Assembly; Item No. 477(Nozzle Head);
Performance - T9074-AS-GIB-010/271
Acceptance - S9074-AR-GIB-010A/278
Test - ;Magnetic Particle Inspection;
Item - ;Nozzle Head Assembly; Item No. 477 (Nozzle Head);
Performance - T9074-AS-GIB-010/271
Acceptance - S9074-AR-GIB-010A/278
Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer)
Item - Weldments
Performance - T9074-AS-GIB-010/271
Acceptance - MIL-STD-2035
Test - Visual and Dye Penetrant Inspection (final layer)
Item - Weldments
Performance - T9074-AS-GIB-010/271
Acceptance - MIL-STD-2035
Test - ;Liquid Penetrant Inspection;
Item - ;Nut Slotted; Item No. 179G;
Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222
Acceptance - MIL-DTL-1222
Test - ;Liquid Penetrant Inspection or Magnetic Particle Inspection (Wet Method) (Either inspection is acceptable);
Item - ;Studs; Item No's 178A, 178B and 178C Nuts; Item No,s 179A, 179B and 179C;
Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222
Acceptance - MIL-DTL-1222
Test - ;Insulation Resistance;
Item - ;Motor;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Structureborne noise test;
Item - ;Each Pump/Motor assembly;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Operational Test;
Item - ;Each Pump/Motor assembly;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Hydrostatic test;
Item - ;Pump;
Performance - ;Paragraph 1.al. of MS 2550-081-066;
Acceptance - ;Paragraph 1.al. of MS 2550-081-066;
Attribute - ;Maintenance Standard 2550-081-066 inspections requiring a recorded measurement or checked as SAT or UNSAT;
Item - ;Each Pump assembly;
Performance - ;Maintenance Standard 2550-081-066;
Attribute - ;Maintenance Standard inspections requiring a recorded measurement or checked as SAT or UNSAT;
Item - ;Each Motor assembly;
Performance - ;Maintenance Standard 2550-081-062 for General Dynamics motor drawing 3505-9 or Maintenance Standard 2550-081-063 for General Dynamics motor drawing 3505-20;
Test - ;Hydraulic pump curve test;
Item - ;Each Pump/Motor assembly;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Pump and motor design capacity test;
Item - ;Each Pump/Motor assembly;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Test - ;Pump mechanical seal leakage test;
Item - ;Each Pump;
Performance - ;Refurbishment Instruction 5520-012-0700;
Acceptance - ;Refurbishment Instruction 5520-012-0700;
Attribute - Annealing and Age Hardening
Item - ;Nut,Slotted; Item No. 179G and Rod,Tie; Item No. 374;
Performance - QQ-N-286
3.7 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the
following must be used:
For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG.
For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG.
30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG.
The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in
this contract, the following must be used:
For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes.
For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes.
For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes.
3.8 K-MONEL Fasteners - Material must be heat treated per QQ-N-286.
3.8.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the
annealed and age hardened material and must meet the requirements of QQ-N-286.
3.8.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be
cut or ground only.
3.9 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories:
Huntington Alloys, a Special Metals Company
Attn: Bill Bolenr
3200 Riverside Drive
Huntington, WV 257059
Phone: (304) 526-5889
FAX: (304) 526-5973
Metallurgical Consultants, Inc.
Attn: W. M. Buehler
4820 Caroline
PO Box 88046
Houston, TX 77288-0046
Phone: (713) 526-6351
FAX: (713) 526-2964
Naval Surface Warfare Center, Carderock Division
Attn: Eric Focht Code 614
9500 Macarthur Blvd
West Bethesda, MD 20817-5700
Phone: (301) 227-5032
FAX: (301) 227-5576
Teledyne Allvac
Attn: Dr. W. D. Cao
2020 Ashcraft Ave.
Monroe, NC 28110
Phone: (704) 289-4511
FAX: (704) 289-4269
Westmoreland Mechanical Testing and Research Inc.
Attn: Andrew Wisniewski
P.O. Box 388
Youngstown, PA 15696-0388
Mannesmann Rohrenwerke
Mannesmann Forschungsinstitut (MFI)
Attn: Dr. Weiss
Postfach 251160
47251 Duisburg
Germany
Phone: 011-49-0203-9993194
FAX: 011-49-0203-9994415
ThyssenKrupp VDM USA, Inc.
Attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
Houston, TX 77065-4939
Phone: (281) 955-6683
3.10 Welding or Brazing - When welding, brazing, and allied processes are required, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production
and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing.
3.11 Radiography is required on ;Nozzle Head and Pump Casing; .
3.12 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;Tech Manual 0947-LP-200-5010; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to
mark the working pressure on the item does not apply and is strictly prohibited.
3.13 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent
inspection in accordance with ASME B1 series is acceptable.
3.13.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement.
3.13.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System
22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222.
3.13.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system.
3.14 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable.
3.15 Component Identification - An AERP serial number will be assigned to each component and a nameplate will be provided by NAVSUP WSS MECH, Code N97121, as Government Furnished Equipment (GFE) prior to packaging and shipment. The Contractor is requested to
notify NAVSUP WSS MECH, Code N97121 when the manufacturing process is ready for the nameplate(s), allowing sufficient time for mailing. Additional details are clarified in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
3.16 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document,
including any/all invoked specifications and drawings.
3.17 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format.
Definitions are provided elsewhere in the Contract/Purchase Order.
3.17.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide
a copy of this request to the QAR. Requests must include the information listed below.
a. A complete description of the contract requirement affected
and the nature of the waiver/deviation (non-conformance),
including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this
configuration.
c. Any impacts to logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel or impacts to the operational use of the product.
d. Information about remedial action being taken to prevent reoccurrence
of the non-conformance.
3.17.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/
3.17.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering
Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II),
and change justification.
b. A complete description of the change to be made and the need for
that change.
c. A complete listing of other Configuration Items impacted by the
proposed change and a description of the impact on those CIs.
d. Proposed changes to documents controlled by the Government.
e. Proposed serial/lot number effectivities of units to be
produced in, or retrofitted to, the proposed configuration.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel in support of the product.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the
engineering change.
3.18 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
3.19 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further
application of the above documents is prohibited.prohibited.
3.19.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.
^ QUALITY ASSURANCE REQUIREMENTS ^
3.20 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected,
identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance
criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.
3.21 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as
part of the certification OQE package submitted by the Contractor.
Note: These requirements do not apply to tack/spot welds.
3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair).
3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The
approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be
submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data
submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." " WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ."). Authority for the
repair of Special Repairs in castings and authority for the repair of wrought or forged material material must be obtained from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of
the proposed repair. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application.
3.21.3 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 48 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 48 hour time limit may be modified upon mutual
agreement between the vendor and DCMA.
3.21.4 When drawings require hard facing surface Iron content (Nickel for Monel valves) not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results
must be submitted as part of the qualification data.
3.21.5 Qualification requirements for production hardfacing: The maximum qualified thickness for hardfacing must be twice the weld deposit thickness measured in the as-welded condition that is subjected to initial NDT (Non-Destructive Testing) and any
additional drawing requirements. The minimum qualified thickness is the final machined thickness at which hardness testing, NDT, macro-etch, and any additional drawing requirements are satisfactorily performed.
3.21.6 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not
listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element.
3.21.7 Qualification requirements for production cladding: The maximum qualified thickness for cladding must be twice the weld deposit thickness measured in the as-welded condition that is subjected to initial NDT and any additional drawing requirements.
The minimum qualified thickness is the final machined thickness at which NDT, side bends, macro-etch testing, and any additional drawing requirements are satisfactorily performed.
3.21.8 When weld repair is required on titanium material, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted for review and approval.
3.21.9 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable
documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training
plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic formation, such as Adobe Acrobat
PDF.
3.21.10 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278.
3.21.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following:
a) Filler Metal LOT number(s)
b) Specification and Type
c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements.
d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption.
3.21.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor.
3.22 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012
or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.
3.22.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality
requirements established in the Contract/Purchase Order.
3.22.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon
notification, make his facilities available for audit by the contracting Officer or his authorized representative.
3.22.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of
any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.22.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly
notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency
(DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.
3.22.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.23 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and
rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.23.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made
available for operations of such devices and for verification of their accuracy and condition.
3.23.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided
by the Government representative.
3.24 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization
of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being
purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon
receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest
Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.24.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.24.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services
specified in the purchase order or contract.
3.24.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the
purchased product on the end item represented by this contract.
3.24.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be
established. Records of this effort must be available for review by the government.
3.24.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.25 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:
3.25.1 Visual examination upon receipt to detect damage during transit.
3.25.2 Inspection for completeness and proper type.
3.25.3 Verification of material quality received.
3.25.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.25.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
3.25.6 Identification and protection from improper use or disposition.
3.25.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and
necessity for withholding the material from use.
3.25.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on
bailed property must be maintained.
3.25.9 Material returned to the contractor must be handled as GFM.
3.26 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required
Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3,
Section C of this contract/purchase order.
3.26.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that
implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order.
3.27 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must
provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of
operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.
3.27.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the
marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is
permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.
3.27.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and
the tag securely affixed to the material.
3.27.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the item identifying the part
number, piece number, traceability number, and the location of the permanent mark.
3.27.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ;
3.28 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply:
3.28.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the
material supplied.
3.28.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or
mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used
during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material
must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered,
the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below.
TRACEABILITY MARKING ________________________________________________
(marking on finished item)
IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO
HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER _____________________
(when applicable)
_________________________________________ DATE _____________________
(name and signature of auth. co. rep.)
3.28.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract
requirements. Transcription of certification data is prohibited.
3.28.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.
3.28.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
3.29 Material Handling - The written material control process must include the following:
3.29.1 All raw materials must have traceability markings (except as specified below).
3.29.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.
3.29.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate
material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability
marking must be reapplied upon completion of the final manufacturing process.
3.29.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a
minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and
grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.
3.29.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in
DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.
3.29.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking
location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.
3.30 Receiving inspection -
3.30.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to
another location.
3.30.2 Receiving Inspection must include as a minimum -
Verification that the traceability marking on the material agrees with that on the certification test reports.
Verification that certification test reports are legible and complete.
Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements.
3.31 Discrepancy reporting -
3.31.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to
the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR).
3.32 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance.
3.32.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military
specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code),
table IIA (for sample size).
SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot.
3.32.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the
Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above.
3.32.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification
test reports must also be 100% inspected for completeness and legibility.
3.32.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible.
3.33 Additional Marking for Fasteners - Fasteners must be marked in accordance with ;MIL-DTL-1222; . The method of marking must be types I, II, III, V, VIII or IX of MIL-STD-792 except for grades 410, 416 and 431 in the H condition and grades 8, 630, A574,
and 4340 which must be marked by method II when marking is applied after the final heat treatment. Markings on fasteners that are to be coated must be marked prior to coating and have a minimum depth of 4 mils. Traceability marking must be legible after the
application of protective compounds.
3.33.1 Marking is required for all fasteners regardless of size and must include the material symbol, the manufacturer's identification symbol, and the traceability marking. Marking must be applied on the head of headed fastener (top preferred, side
location if necessary). Self-Locking screws must also be marked with six dots. Where no contract invoked specification requirement exists for this marking, self-locking fasteners must be marked with six dots approximately .032" diameter, raised or depressed
by approximately .010" located on the top perimeter of the head of the fastener in an arc or circular pattern. The six dots must be distinguishable from all other required markings.
3.34 Radiography (RT) - Radiography must be performed in accordance with T9074-AS-GIB-010/271. RT acceptable criteria for castings to be criticality level Iper the applicable table of S9074-AR-GIB-010A/278. RT acceptance criteria for weldments to be per the
applicable table of S9074-AR-GIB-010A/278 (P-1 piping) or MIL-STD-2035, class 1, as applicable.
3.34.1 See CDRL DI-MISC-80678 (RSS) - The Contractor or activity performing theradiography must be responsible for preparing the radiographic shooting sketches (RSS) in accordance with T9074-AS-GIB-010/271. Shooting sketches are not required for radiography
of weldments. The radiographic standard shooting sketches (RSSS) referenced on the applicable drawing may be used, however, since T9074-AS-GIB-010/271 permits a variety of processes, the RSSS may not be applicable as they will not necessarily depend only on
the coverage requirements, but also on the equipment and procedures of the particular radiographic facility. Approval of these shooting sketches or radiographic standard shooting sketches is required per S9074-AR-GIB-010A/278. If this datahas been previously
approved by a Navy activity, the original approval letter must be submitted at the same time as RT film and reader sheet submittal.
3.34.2 All pieces radiographed must be permanently marked with "RT" and a unique RT serial number. (The unique RT serial number must be directly traceable tothe RT film.)
3.34.3 See CDRL DI-MISC-80678 (Production Radiography) - Production Radiographyrequires final acceptance by the Navy. The items listed below must be submitted for final acceptance, cataloging, file, and retention. They must be submitted and approved prior to
shipment of the applicable hardware. However, when the source certification clause is invoked, they must be submitted a minimum of forty-five (45) working days prior to the date of source certification inspection.
(a) Film
(b) RSS/RSSS
(c) RS
(d) DD250 (with unique RT serial numbers traceable to the RT film)
3.35 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information:
1. Contractor's name, address and date.
2. The contract/purchase order number (for example: N00104-11-P-FA12)
3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC
(for example: 1H 4820 012345678 L1)
4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable).
5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable).
6. Manufacturer's compound number ("N/A" when Not Applicable).
7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable).
8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed
satisfactorily.
9. Contractor's or authorized personnel's signature.
4. QUALITY ASSURANCE
4.1 Notes to DCMA QAR and the Contractor -
4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a
disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition.
4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A
record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO.
4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements.
4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders.
4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at:
https://register.nslc.navy.mil/
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.2 ;Packaging shall be in accordance with Refurbishment Instruction 5520-012-0700 paragraph 8.5.;
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES
6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item.
6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD
(Contract Support Document) Library within ECDS.
6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the
ship, or unacceptable risk of personal injury or loss of life.
6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a
critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation).
6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements.
6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's
commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program.
6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the
Contracting Agency as important, are observed and evaluated.
6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government
representative prior to shipment.
6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied
conforms to the specified requirements.
6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits,
center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order.
6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated.
6.1.11 Verification - An examination performed to determine compliance with a specific requirement.
6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following:
- The requirements of this contract/purchase order.
- Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.).
- Contractually invoked federal, military, or commercial specifications and/or standards.
- Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government.
6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is
or after repair by an approved method.
6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of
time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method.
6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety.
6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts
- Health or Safety
- Effective Use or Operation
- Weight, Stability, or Structural Integrity
- System design parameters as schematics, flows, pressures or temperatures
- Compartment arrangements or assigned function
6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major.
6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item.
6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval.
6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification.
6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order.
6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information
contained on those documents and drawings.
6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows:
A... approved for public release; distribution is unlimited.
B... distribution authorized to US Governments agencies only.
C... distribution authorized to US Government agencies and their contractors.
D... distribution authorized to DoD and DoD contractors only.
E... distribution authorized to DoD Components only.
F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T.
X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161.
6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Websit
Notice history
| Notice | Type | Posted |
|---|---|---|
| Pump unit, centrifug, in repair/modification of | Award Notice | |
| This notice | Solicitation | |
| Pump unit, centrifug, in repair/modification of | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity