Pump, fuel, metering

Closed Solicitation Posted

Solicitation number
SPRMM126QHE10
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Defense Logistics Agency Land and Maritime seeks procurement of a fuel metering pump, with proposals due August 14, 2026. No set-aside applies.

The quantity is reduced to 11 units. Drawings and technical data are not available for this item. Contractors who are not manufacturers must identify the Original Equipment Manufacturer. The NAICS code is 336310, Motor Vehicle Gasoline Engine and Engine Parts Manufacturing; the PSC code is 2910, Engine Fuel System Components, Nonaircraft.

The solicitation imposes mandatory use of the Workflow Pro (WFP) Mod Assist Module, with contact Ishmael.Palmer@dla.mil. Contractors must meet Cybersecurity Maturity Model Certification Level requirements as of November 2025. The procurement includes a preference for privately owned U.S.-flag commercial vessels and applies security prohibitions and exclusions per Class Deviation 2026-O0025. Contractors may submit quotes via Electronic Data Interchange (EDI) but must specify any exceptions to solicitation requirements, including Military specifications, packaging, or inspection standards; absent such notice or hardcopy follow-up, award proceeds on stated solicitation terms. Changes requested after award will be evaluated with consideration costs deducted from modifications.

Notice text

2 versions

Update #2 · Latest ·

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||

INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD|

MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Ishmael.Palmer@dla.mil|

NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1||

PREFERENCE FOR PRIVATELY OWNED U.S.-FLAG COMMERCIAL VESSELS (DEV 2026-O0047)(MAR 2026))|2|||

SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|x|x|x|||x||||||||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x|

PD line cancellation, qty reduction to 11 each.

1. All contractual documents (i.e. contracts, purchase orders, task orders,

Delivery orders, and modifications) related to the instant procurement are

considered to be "issued" by the government when copies are either deposited

in the mail, transmitted by facsimile, or sent by other electronic commerce

methods, such as email. The government's acceptance of the contractor's

proposal constitutes bilateral agreement to "issue" contractual documents as

detailed herein.

2. Drawings or technical data are not available for this item.

3. Delivery days_________aro.

4. Offer valid for _____ days.

5. When submitting quotes via Electronic Data Interchange (EDI), make sure

you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection

& Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of

the exceptions. If nothing is indicated or received, award will be based

upon solicitation requirements. Changes or requests for changes after

award will have consideration costs deducted on modifications.

6. If you are not the manufacturer of the material you are offering, you MUST

state who the Original Equipment Manufacturer (OEM) is Commercial and

Government Entity Code (CAGE) code and the part number you are offering.

7. Please provide an email address for follow up communications.

____________________________________________________________

8. It is recommended that vendors provide contact information to NAVSUP Weapon

System Support (WSS) Mechanicsburg in order to receive automated notifications

from Navy Electronic Commerce Online (NECO) when contracts/modifications

are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg

and posted on Procurement Integrated Enterprise Environment (PIEE)

Electronic Data Access (EDA). To receive these notifications, contact:

NAVSUPWSS code 025, procurement systems design and contract support division

Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following

information with your request: CAGE code, company name, address and

Point-of-Contact (POC) with phone number and email address.

9. Contractors can view their orders, contracts and modifications at the

EDA web tool. This web tool is located at the PIEE website. It is

recommended that the contractor register for EDA at https://piee.eb.mil/.

Click on new user and registration.

Any order resulting from this Request for Quotation will require electronic

submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF.

10. The following DLA Procurement Notes are applicable to this requirement:

E06 Inspection and Acceptance at Source (JUN 2018)

11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS):

______________________________________________________________

INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE &

ADDRESS):

______________________________________________________________

12. UCF SECTION F PRODUCTION FACILITY CHANGES

(a) The performance of any of the work contracted for in any place other than

that named in the contract is prohibited unless specifically approved by the

Contracting Officer. Written requests for a change in production facilities

must be submitted in writing to the Contracting Officer. Changes in production

facilities may be approved, provided:

(1) Performance by small business or in labor surplus areas as required by

the contract will not be changed;

(2) The change will not cause a delay in delivery or necessitate a change in

the purchase description;

(3) The free on board (f.o.b.) point is not changed; and

(4) Each request is supported by a price reduction of $250.00 to cover the

Government's administrative costs to process the change.

(b) The Government reserves the right to deny approval even if these four

elements are met.

Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per DFARS 215.101-2-70(a)(1)(i).

\

1. SCOPE

1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the PUMP,FUEL,METERING .

2. APPLICABLE DOCUMENTS - NOT APPLICABLE

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The PUMP,FUEL,METERING furnished under this

contract/purchase order shall be the design represented by Cage Code(s)

reference number(s). Cage _______ ref. no.

;5P630 OD30539;

3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and

approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the

substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government

evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace new.

Code 6: Part redesigned - Parts not interchangeable.

3.3 ;A shim set, LUCAS BRYCE p/n Y3J20017 or OHIO GASKET AND SHIM P/N 538/3305, shall be shipped with each unit.;

3.4 ;A record of the calibration report shall be shipped with each unit.;

3.5 Marking - This item shall be physically identified in accordance with MIL-STD-130.

4. QUALITY ASSURANCE

4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any

inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance

does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.

4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

Update #1 ·

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||

INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD|

MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Ishmael.Palmer@dla.mil|

NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1||

PREFERENCE FOR PRIVATELY OWNED U.S.-FLAG COMMERCIAL VESSELS (DEV 2026-O0047)(MAR 2026))|2|||

SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|x|x|x|||x||||||||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x|

1. All contractual documents (i.e. contracts, purchase orders, task orders,

Delivery orders, and modifications) related to the instant procurement are

considered to be "issued" by the government when copies are either deposited

in the mail, transmitted by facsimile, or sent by other electronic commerce

methods, such as email. The government's acceptance of the contractor's

proposal constitutes bilateral agreement to "issue" contractual documents as

detailed herein.

2. Drawings or technical data are not available for this item.

3. Delivery days_________aro.

4. Offer valid for _____ days.

5. When submitting quotes via Electronic Data Interchange (EDI), make sure

you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection

& Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of

the exceptions. If nothing is indicated or received, award will be based

upon solicitation requirements. Changes or requests for changes after

award will have consideration costs deducted on modifications.

6. If you are not the manufacturer of the material you are offering, you MUST

state who the Original Equipment Manufacturer (OEM) is Commercial and

Government Entity Code (CAGE) code and the part number you are offering.

7. Please provide an email address for follow up communications.

____________________________________________________________

8. It is recommended that vendors provide contact information to NAVSUP Weapon

System Support (WSS) Mechanicsburg in order to receive automated notifications

from Navy Electronic Commerce Online (NECO) when contracts/modifications

are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg

and posted on Procurement Integrated Enterprise Environment (PIEE)

Electronic Data Access (EDA). To receive these notifications, contact:

NAVSUPWSS code 025, procurement systems design and contract support division

Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following

information with your request: CAGE code, company name, address and

Point-of-Contact (POC) with phone number and email address.

9. Contractors can view their orders, contracts and modifications at the

EDA web tool. This web tool is located at the PIEE website. It is

recommended that the contractor register for EDA at https://piee.eb.mil/.

Click on new user and registration.

Any order resulting from this Request for Quotation will require electronic

submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF.

10. The following DLA Procurement Notes are applicable to this requirement:

E06 Inspection and Acceptance at Source (JUN 2018)

11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS):

______________________________________________________________

INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE &

ADDRESS):

______________________________________________________________

12. UCF SECTION F PRODUCTION FACILITY CHANGES

(a) The performance of any of the work contracted for in any place other than

that named in the contract is prohibited unless specifically approved by the

Contracting Officer. Written requests for a change in production facilities

must be submitted in writing to the Contracting Officer. Changes in production

facilities may be approved, provided:

(1) Performance by small business or in labor surplus areas as required by

the contract will not be changed;

(2) The change will not cause a delay in delivery or necessitate a change in

the purchase description;

(3) The free on board (f.o.b.) point is not changed; and

(4) Each request is supported by a price reduction of $250.00 to cover the

Government's administrative costs to process the change.

(b) The Government reserves the right to deny approval even if these four

elements are met.

Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per DFARS 215.101-2-70(a)(1)(i).

\

1. SCOPE

1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the PUMP,FUEL,METERING .

2. APPLICABLE DOCUMENTS - NOT APPLICABLE

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The PUMP,FUEL,METERING furnished under this

contract/purchase order shall be the design represented by Cage Code(s)

reference number(s). Cage _______ ref. no.

;5P630 OD30539;

3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and

approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the

substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government

evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace new.

Code 6: Part redesigned - Parts not interchangeable.

3.3 ;A shim set, LUCAS BRYCE p/n Y3J20017 or OHIO GASKET AND SHIM P/N 538/3305, shall be shipped with each unit.;

3.4 ;A record of the calibration report shall be shipped with each unit.;

3.5 Marking - This item shall be physically identified in accordance with MIL-STD-130.

4. QUALITY ASSURANCE

4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any

inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance

does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.

4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

Similar open opportunities

Opportunity Agency Set-aside Responses due
Pump, fuel, metering and NAICS 336310 Land and Maritime Total Small Business
Pump, fuel, metering and NAICS 336390 Aviation No set-aside
Pump, fuel, electrical NAICS 333618 Land and Maritime No set-aside
Pump, centrifugal NAICS 333914 Land and Maritime No set-aside
Pump, hand, fuel pump NAICS 336310 Land and Maritime Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity