Puerto Rico-191 Water System Reconstruction
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 12441923R0023
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 221310 Water Supply and Irrigation Systems
- PSC
- S114 Utilities- Water
- Place of performance
- Puerto Rico, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service is seeking a contractor through a total HUBZone set-aside to reconstruct approximately three miles of the PR-191 main water distribution system in Puerto Rico. The contractor will be required to install new HDPE waterlines above and below ground, including a new 10,000-gallon concrete water storage tank. The work will be divided into a base bid and two options, with an estimated contract value between $1-5 million. The anticipated solicitation date is June 26, 2023, with a proposal due date of May 25, 2023 and anticipated award date of July 26, 2023.
The contract is set-aside only for HUBZone small businesses under NAICS 221310 and PSC S114. There is no incumbent as this is a new requirement. The base bid involves work from two wells and tanks to six distribution sites. Optional items one and two extend the waterline to a new storage tank, water tower, and one additional site.
Notice text
2 versions
Update #2 · Latest ·
Type of Action: This is a Pre-solicitation notice being released pursuant to Federal Acquisition Regulation (FAR) Part 5.
This notice is not a Request for Proposals (RFP) and the Government is not committed to award a contract pursuant to this announcement. Attachments included in this notice are:
- Draft Specifications and Drawings
- Schedule of items
All these documents are for information only.
This is a new requirement and that there is no incumbent contract.
THIS PROCUREMENT WILL BE A 100% COMPETITIVE HUBZONE SET-ASIDE
NO FURTHER INFORMATION IS AVAILABLE AT THIS TIME.
Original Set Aside: Total HUBZone Set-Aside (FAR 19) pursuant to FAR Clause 52.219-3 Notice of HUBZone Set-Aside or Sole-Source Award.
NAICS Code: 221310 – Water Supply and Irrigation Systems, Size Standard: $41 Million
Product Service Code (PSC): S114 Utilities- Water
Place of Contract Performance: Puerto Rico, USA
Project Title: EYNF PR-191 Water System Reconstruction
Contracting Office Address:
United States Department of Agriculture (USDA)
United States Forest Service (USFS)
Procurement & Property Services
Special Project Operations Center (SPOC) East Branch
Sidney R. Yates Federal Building, 201 14th St SW,
Washington, DC 20227
Point or Contact: Contract Specialist, Joe L. Libbey at Joe.Libbey@usda.gov, Ian K. Barnes at Ian.Barnes@usda.gov and the Contracting Officer at Josh.choi@usda.gov
Estimated Contract Magnitude: $1,000,000.00 to $5,000,000.00
Line-Item Numbers: Refer to the attached Schedule of Items.
Anticipated Solicitation Date: 06/26/2023
Anticipated Contract Award Date: 07/26/2023
Description:
The U.S. Department of Agriculture’s (USDA) Forest Service requires a Contractor for the reconstruction of the PR-191 main water distribution system. The work includes installation of approximately three miles of HDPE waterline. The waterline in areas may be buried, hand trenched, placed on the surface, anchored to bridges or guardrail, and directionally drilled. Much of the waterline is along Puerto Rico Highway 191 and will require traffic control. Work includes the installation of a new 10,000-gallon concrete water storage tank. Work includes installation of waterline appurtenances such as air release valves, pressure regulating valve, water meters, waterline stream crossings, valves, valve boxes, hydrants, and other appurtenances to complete the work. General intent is for the waterline to be above ground when running through the general forest areas and below ground when running alongside the road and within administrative or recreation sites. Work does include horizontal directional drilling, replacement of concrete gutters, and asphalt patching.
The work is divided into a base bid item, and two option items and they are as described below.
Base Item: The general intent is to complete all work that is above and including the valve at Sierra Palm for the distribution line that goes to the new Yokahu water storage tank. Specifically, it includes the work from the Palo Colorado well to the Palo Colorado tank, from the Caimitillo well to the Caimitillo tank, the bypass line that connects the two systems, and the distribution lines to Stone House, Bano de Oro, Bano Grande, Palo Colorado, and Sierra Palm.
Construction Option 1: The general intent of the item is to complete all work below the valve near the Sierra Palm bridge to and including the valve below the new 10,000-gallon concrete water storage tank. The work includes the bypass around the new water storage tank with the pressure reducing valve, the new water storage tank, and fencing.
Construction Option 2: The general intent of the item is to complete all work below the valve at the new water storage tank to Yokahu Tower. Work includes a side lateral to the Big Tree site.
Update #1 ·
Type of Action: This is a Pre-solicitation notice being released pursuant to Federal Acquisition Regulation (FAR) Part 5.
This notice is not a Request for Proposals (RFP) and the Government is not committed to award a contract pursuant to this announcement. Attachments included in this notice are:
- Draft Specifications and Drawings
- Schedule of items
All these documents are for information only.
This is a new requirement and that there is no incumbent contract.
NO FURTHER INFORMATION IS AVAILABLE AT THIS TIME.
Original Set Aside: Total HUBZone Set-Aside (FAR 19) pursuant to FAR Clause 52.219-3 Notice of HUBZone Set-Aside or Sole-Source Award.
NAICS Code: 221310 – Water Supply and Irrigation Systems, Size Standard: $41 Million
Product Service Code (PSC): S114 Utilities- Water
Place of Contract Performance: Puerto Rico, USA
Project Title: EYNF PR-191 Water System Reconstruction
Contracting Office Address:
United States Department of Agriculture (USDA)
United States Forest Service (USFS)
Procurement & Property Services
Special Project Operations Center (SPOC) East Branch
Sidney R. Yates Federal Building, 201 14th St SW,
Washington, DC 20227
Point or Contact: Contract Specialist, Joe L. Libbey at Joe.Libbey@usda.gov, Ian K. Barnes at Ian.Barnes@usda.gov and the Contracting Officer at Josh.choi@usda.gov
Estimated Contract Magnitude: $1,000,000.00 to $5,000,000.00
Line-Item Numbers: Refer to the attached Schedule of Items.
Anticipated Solicitation Date: 06/26/2023
Anticipated Contract Award Date: 07/26/2023
Description:
The U.S. Department of Agriculture’s (USDA) Forest Service requires a Contractor for the reconstruction of the PR-191 main water distribution system. The work includes installation of approximately three miles of HDPE waterline. The waterline in areas may be buried, hand trenched, placed on the surface, anchored to bridges or guardrail, and directionally drilled. Much of the waterline is along Puerto Rico Highway 191 and will require traffic control. Work includes the installation of a new 10,000-gallon concrete water storage tank. Work includes installation of waterline appurtenances such as air release valves, pressure regulating valve, water meters, waterline stream crossings, valves, valve boxes, hydrants, and other appurtenances to complete the work. General intent is for the waterline to be above ground when running through the general forest areas and below ground when running alongside the road and within administrative or recreation sites. Work does include horizontal directional drilling, replacement of concrete gutters, and asphalt patching.
The work is divided into a base bid item, and two option items and they are as described below.
Base Item: The general intent is to complete all work that is above and including the valve at Sierra Palm for the distribution line that goes to the new Yokahu water storage tank. Specifically, it includes the work from the Palo Colorado well to the Palo Colorado tank, from the Caimitillo well to the Caimitillo tank, the bypass line that connects the two systems, and the distribution lines to Stone House, Bano de Oro, Bano Grande, Palo Colorado, and Sierra Palm.
Construction Option 1: The general intent of the item is to complete all work below the valve near the Sierra Palm bridge to and including the valve below the new 10,000-gallon concrete water storage tank. The work includes the bypass around the new water storage tank with the pressure reducing valve, the new water storage tank, and fencing.
Construction Option 2: The general intent of the item is to complete all work below the valve at the new water storage tank to Yokahu Tower. Work includes a side lateral to the Big Tree site.
Attachments
| File | Type | Posted |
|---|---|---|
| A01 Draft Specifications PR-191 Waterline.pdf | ||
| A01 Draft Schedule of Items.xlsx | XLSX spreadsheet | |
| A01 Draft Drawings PR191 Waterline.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Award Notice: Puerto Rico-191 Water System Reconstruction | Award Notice | |
| Amendment 0001 Puerto Rico-191 Water System Reconstruction | Solicitation | |
| Puerto Rico-191 Water System Reconstruction | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity